Third Notice BLD | 6/14/2006 | 6/14/2006 | 6/14/2006 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 4/14/2006 | 4/14/2006 | 6/14/2006 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | 3/27/2006 | 3/27/2006 | 4/14/2006 | | DONE |
Jim Sly
|
|
|
|
BLD-Final | 3/27/2006 | 3/27/2006 | 3/27/2006 | P | DONE |
Jim Sly
|
|
|
EXP.
|
DOC - Permit Finaled | 3/27/2006 | 3/23/2006 | 3/27/2006 | A | PASS |
Jim Sly
|
|
|
|
DOC - Permit Expired | 3/27/2006 | 3/27/2006 | 3/27/2006 | A | PASS |
Jim Sly
|
|
|
Previously Exp by J Toombs
|
Expired/Cancelled | | | 8/18/2003 | | DONE |
|
|
|
|
BLD-Final | 6/11/2002 | 6/11/2002 | 6/11/2002 | A | PART |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 6/11/2002 11:41:21 AM ok temp oc, c/n posted. 6/11/2002 11:43:41 AM
|
BLD-Conference | 6/10/2002 | 6/10/2002 | 6/10/2002 | P | CANC |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 6/10/2002 5:19:03 PM Just needed to check history. 6/11/2002 11:25:59 AM
|
BLD-Framing/Rough-in | 2/22/2002 | 2/22/2002 | 2/22/2002 | P | PART |
Dave Hannah
|
|
|
fr insp ###-####- john crew has patches up and is mudding and taping ok to add second layer 2/22/2002 2:58:06 PM
|
BLD-Framing/Rough-in | 2/15/2002 | 2/19/2002 | 2/19/2002 | A | PART |
Russ Owen
|
|
|
JOHN ###-#### PLEASE CALL BEFORE GOING OUTrest room ok ceiling needs patches in place prior to 2nd layer 5/8" drywall. 2/19/2002 11:00:37 AM
|
Telephone call | | | 2/7/2002 | | DONE |
|
|
|
left mess that permit is ready
|
Issue PAID IN FULL permit | | | 2/7/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/7/2002 | | |
|
|
|
|
Print Occupancy Form | | | 2/7/2002 | | DONE |
|
|
|
|
Plan assigned to (DRS) | 1/18/2002 | | 2/6/2002 | | PASS |
Dan Stuart
|
|
|
2/6/2002 14:40:19 DRS - activity updated through activity BLDA022 from case BLD02-00111.
|
Routing - PLAN CHECK | 1/18/2002 | | 2/6/2002 | | PASS |
|
|
|
Approved as noted and attached. Visited with fire code plans examiner over the scope of work. As this permit is only for 1-hour code upgrade and an occupancy group; occupant load or exiting is not being considered under this permit, the plan doesnot need to route for fire code review.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/6/2002 | | PASS |
|
|
|
To permit desk for issue.
|
Plans ACCEPTED BY PLAN TECH | | | 1/18/2002 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 1/18/2002 | | 1/18/2002 | | PASS |
|
|
|
|
Application received | | | 1/17/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/17/2002 | | DONE |
|
|
|
|
Fee Review-notes | 1/17/2002 | 1/17/2002 | | | |
|
|
|
|