Third Notice BLD | 4/14/2006 | 4/14/2006 | 9/13/2006 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 3/29/2006 | 3/29/2006 | 4/14/2006 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | 3/16/2006 | 3/16/2006 | 3/29/2006 | | DONE |
Mike Jordan
|
|
|
|
BLD-Aging Inspection | 3/16/2006 | 3/16/2006 | 3/16/2006 | | CANC |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 3/16/2006 | 3/16/2006 | 3/16/2006 | A | PASS |
Mike Jordan
|
|
|
All work is complete. No temp structure on site. Permanent bldg in place as finaled.
|
PubWorks Occupancy Approval | 1/14/2005 | 1/14/2005 | 1/14/2005 | | DONE |
|
|
|
No final inspection, found complete 1/14/05. R.Rokovitz
|
Expired/Cancelled | | | 8/18/2003 | | DONE |
|
|
|
|
BLD-Final | 4/30/2002 | 5/1/2002 | 5/1/2002 | A | CANC |
Russ Owen
|
|
|
###-#### KEN FOR OCCUPANCY. This is not a building permit, this is a temporary modular which required a Zoning certificate only . a building permit is not required . A plan reveiw is also not performed on this and no structural inspections required. I have learned this this day, as I had questions pertaining to an occupacy certificate. 5/1/2002 1:05:56 PM
|
FIRE-Final Inspection | 4/29/2002 | 4/30/2002 | 4/30/2002 | A | PASS |
Troy Cobbley
|
|
|
fire life/safety OK 4/30/2002 9:24:28 AM
|
FIRE-Final Inspection | 4/26/2002 | 4/26/2002 | 4/26/2002 | P | FAIL |
Troy Cobbley
|
|
|
provide ADA approved hardware on the restroom doors, remove the thumbturn on the main exit, remove the manual flush bolts on the main exit 4/26/2002 9:49:24 AM
|
BLD-Framing/Rough-in | 3/22/2002 | 3/25/2002 | 3/25/2002 | A | PART |
Russ Owen
|
|
|
###-#### tie down inspection for temporary premanufactured structure. Appears ok no details called out on approved plans. 3/25/2002 12:24:52 PM
|
Issue PAID IN FULL permit | | | 3/1/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/20/2002 | | DONE |
|
|
|
|
Telephone call | | | 2/20/2002 | | DONE |
|
|
|
permit ready and need ACHD
|
Routing - PLAN CHECK | 2/19/2002 | | 2/19/2002 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 2/19/2002 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 2/19/2002 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/19/2002 | | DONE |
|
|
|
|
Routing - FIRE | 2/15/2002 | | 2/18/2002 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 2/14/2002 | | 2/15/2002 | | |
|
|
|
Called Architect for (1) more copy of resubmittal of floor plan. Placed plans in hold box.
|
Additional plans submitted | | | 2/15/2002 | | DONE |
|
|
|
Received two copies of the fire hydrant and flow information. Routed to fire for re-review.
|
Telephone call | | | 2/14/2002 | | DONE |
|
|
|
Called Andrew Davis of BRS Architects, requesting one more copy of the revised sheet 1 of 4 of the floor plan. I informed Andrew that this would be issued as soon as I get one more copy.
|
Plan resubmittals received | | | 2/14/2002 | | DONE |
|
|
|
Received one more copy of Sheet 1 of 4 Floor Plan as requested. Attached to plans.
|
Plan Review Completed(1st rev) | | | 2/13/2002 | | FAIL |
|
|
|
|
Routing - FIRE | 2/8/2002 | | 2/13/2002 | | FAIL |
|
|
|
|
Routing - PLANNING Land Div | 2/8/2002 | | 2/8/2002 | | PASS |
|
|
|
Rec'd deed. Land division ok. Returned to Plan Review. (blc)
|
Routing - PLUMBING | 2/6/2002 | | 2/8/2002 | | PASS |
|
|
|
backflow prevention will be required on the water service.
|
Routing - PLANNING | 2/5/2002 | | 2/6/2002 | | PASS |
|
|
|
Approver per CZC01-198.
|
Routing - PUBLIC WORKS | 1/31/2002 | | 2/5/2002 | | PASS |
|
|
|
|
Plan resubmittals received | | | 2/4/2002 | | DONE |
|
|
|
Received one resubmittal sheet "1" with transmittal that contains comments. Requested one more copy from Architect.
|
Routing - PLANNING Land Div | 1/23/2002 | | 1/31/2002 | | FAIL |
|
|
|
Need deed recorded after ROS and new parcel number. Routed to Public Works. (blc)
|
Telephone call | | | 1/23/2002 | | DONE |
|
|
|
1. Received call from Andrew Davis of BRS Architects stating that the temporary structure will be left on wheels and "sunk" into the ground, so there will be no stairs/ramps. I directed the call to Mike Otto.
2. After a brief discussion with Brian Murphy, Brian stated he needs three (3) copies of the civil plans and the calculations.
3. I called Craig Callaham with Quadrant Consulting requesting the (3) copies of civil plans and calculations. Mr. Callaham stated that he would bring them in today.
|
Additional plans submitted | | | 1/23/2002 | | DONE |
|
|
|
Received the three sets of civil plans with drainage calculations.
|
Application received | | | 1/22/2002 | | |
|
|
|
|
Telephone call | | | 1/22/2002 | | DONE |
|
|
|
1. Faxed letter to Andrew Davis listing the missing documents that are necessary before we can start the processing. I stated in the letter that the letters will be placed on "HOLD" until these documents are received.
2.1/23/02 Left message for Andrew Davis if he received the faxed letter regarding the missing documents.
|