Permit Information
Permit NumberBLD02-00131
StatusFinaled
Name HUGHES PATRICIA R AND
Site Address 6929 S SUPPLY WAY
Project NameBASQUE COUNTRY IMPORTS
Customer Number 
ePlanReviewNo
Description
Basque Country Imports * To construct a 8140 sq. ft.one story, metal building warehouse with an accessory office and additional lease space. Separate MIS02-00011 will be issued for the Basque Country Imports to allow occupancy. A separate permit will be required for the lease space to allow occupancy when tenant is determined. Building will have a grade level loading doors & dock high loading doors. DRH01-002031 All work is per approved plans and attachments.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD4/26/20054/26/20054/26/2005 DONE
First Notice has not been responded to.
First Notice 12/18/20034/26/2005 DONE
First Notice1/22/20021/22/20024/26/2005 DONE
DOC - Permit Finaled12/18/200312/18/200312/18/2003APASS
DetailsJim Storey
Finaled by inspector at 12/18/2003 8:23:55 AM
BLD-Aging Inspection12/18/200312/18/200312/18/2003 DONE
DetailsJim Storey
7/31/02 310 12/18/2003 8:23:53 AM
Letter of compliance  7/31/2002 DONE
Letter of Compliance #22554 issued 7-31-02.
BLD-Final7/30/20027/30/20027/30/2002PPASS
DetailsJim Storey
; Phone #: ###-#### ok for final on mis02-00011 also to provide occ. 7/30/2002 3:41:01 PM
Code Occupancy Approval7/30/20027/30/20027/30/2002PPASS
DetailsScott M.Brown
SIGNED OFF FINAL, LOOKS GOOD AND TO MOST PART TO PLANS. 7/30/2002 3:55:14 PM
FIRE-Final Inspection7/17/20027/18/20027/18/2002APASS
DetailsRick Jackson
FIRE FN DUTCH- ###-####
BLD-Framing/Rough-in7/15/20027/16/20027/16/2002APASS
DetailsJim Storey
dutch ###-#### cielling ok. 7/16/2002 8:56:07 AM
Print Occupancy Form  7/12/2002 DONE
BLD-Wall cover6/13/20026/13/20026/13/2002PPASS
DetailsJim Storey
###-#### dutch office walls ok for cover. 6/13/2002 2:23:58 PM
BLD-Framing/Rough-in6/10/20026/11/20026/11/2002APASS
DetailsJim Storey
###-#### fire wall horrasontal joints taped ok. 6/11/2002 12:23:09 PM
Telephone call  6/5/2002 DONE
received phone call from Glenn Walker requesting to put drywall on only one side of tenant demising wall to unfinished space. I told him no the demising wall must meet full requirements to occupy. MLO
BLD-Framing/Rough-in5/29/20025/30/20025/30/2002APART
DetailsJim Storey
###-#### dutch framing and north fire wall ok 5/30/2002 1:55:31 PM
BLD-Footing4/23/20024/23/20024/23/2002PPART
DetailsJim Storey
ft insp -dutch ###-#### placed w/special insp. 4/23/2002 1:55:21 PM
BLD-Foundation4/19/20024/22/20024/22/2002APASS
DetailsJim Storey
FOUND WALL- DUTCH ###-#### rebar ok pending special insp. report on concrete. 4/22/2002 9:22:41 AM
BLD-Footing4/15/20024/16/20024/16/2002PPART
DetailsJim Storey
###-#### DUTCH pending special insp report. rebar ok 4/16/2002 12:31:10 PM
BLD-Footing4/11/20024/12/20024/12/2002PCANC
DetailsJim Storey
###-#### DUTCH
(F) Reprint permit  4/12/2002  
Issue PAID IN FULL permit  4/11/2002 DONE
PLANS/APPL TAKEN TO FRONT DESK  3/20/2002 DONE
Inspection Record Card- Bld  3/20/2002 DONE
CALLED CORNELL
Telephone call  3/20/2002 DONE
Plan assigned to (MLO)1/24/2002 3/20/2002 PASS
DetailsMike Otto
3/20/2002 14:48:32 MLO - activity updated through activity BLDA022 from case BLD02-00131.
Routing - PUBLIC WORKS3/7/2002 3/19/2002 PASS
Re-route to PW if plans pass in plumbing. kmm
Routing - PLUMBING3/13/20023/13/20023/13/2002 PASS
resubmittals recieved for using Orenco systems pump and filter ok to use sent to be attached to approved plans.
Plan resubmittals received  3/8/2002 DONE
response to structural review. MLO
Routing - PLUMBING3/6/2002 3/7/2002 PASS
per plans and 2000 upc
Routing - FIRE3/4/2002 3/6/2002 PASS
Plan resubmittals received  3/4/2002 DONE
Received two copies of revised sheets SP-1. Routed to Mike O. kmm
Routing - FIRE2/27/2002 3/1/2002 FAIL
STILL NEED HYDRANT FLOW
Routing - PLAN CHECK2/19/2002 2/25/2002 PASS
Plan resubmittals requested  2/25/2002 FAIL
Structural corrections
Routing Off Site - STRUCTURAL2/13/2002 2/25/2002 PASS
2-13-02 received metal bldg. drawings.
waiting for pre engineered plans and calcs. When receive, will send to outside eng. kmm Corrections faxed and mailed to architect. MLO
Routing - PLANNING Land Div2/15/2002 2/19/2002 PASS
Land division ok. Returned to Plan Review. (blc)
Routing - FIRE2/12/2002 2/15/2002 FAIL
hydrant location, access road quality, sprinkler underground, high storage
Plan Review Completed(1st rev)  2/15/2002 FAIL
Plan resubmittals received  2/14/2002 DONE
Received two copies of revised sheets 0, A-1, A-4R and one copy of cover letter. Routed to Mike O. KMM
Additional plans submitted  2/13/2002 DONE
Received three copis of Metal bld. drawings and struct. calcs. Routed one to outside eng. and gave the other two to mike O. kmm
Routing - PLAN CHECK2/8/2002 2/12/2002 FAIL
corrections faxed and mailed to architect
Plan resubmittals requested  2/12/2002 FAIL
UBC corrections
Routing - PLUMBING2/6/2002 2/8/2002 FAIL
provide a plan showing the septic tank and pump chamber, pumps and venting.
Routing - PLANNING2/6/2002 2/6/2002 PASS
Approved per DRH01-00203.
Routing - PUBLIC WORKS2/4/2002 2/6/2002 FAIL
sEWER PLAN SHOWING PUMP DESIGN AND CONNECTION TO PRESSURE SEWER SYSTEM. JJ
Routing - PLANNING Land Div1/24/2002 2/4/2002 FAIL
Need copies of deeds recorded after ROS #3303. Routed to Public Works. (blc)
Telephone call  2/1/2002 DONE
Left message for Cornel Larson to send the engineering building plans and calculations as soon as possible.
Pending Assignment by JCM1/23/2002 1/24/2002 DONE
DetailsJohn Menard
1/24/2002 07:52:22 JCM - activity updated through activity BLDA174 from case BLD02-00131.
Plans ACCEPTED BY PLAN TECH  1/24/2002 PEND
Requires three copies of pre engineered plans and calcs. Contacted Cornel of this need. kmm
Plan routing begun/NEW & ADDTN  1/23/2002 DONE
Recd Pcfee & Taken To Pln CK  1/22/2002 DONE