Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD02-00133
StatusFinaled
Name CORNEL LARSON
Site Address 6929 S SUPPLY WAY
Project NameBASQUE COUNTRY IMPORTS
Customer Number 
ePlanReviewNo
Description
Basque Country Imports * Grading permit. To grub, clean, excavate, grade, import and compact site earth materials in preparation for the future construction of the Basque Country Imports. To install curb, gutter and paving in accordance with the grading and drainage plans approved by the public works department. Related site utilities included in this permit. No building demoliton, installation or construction is allowed under this permit. DRH01-00203 PC# 045-02
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection12/30/200212/30/200212/30/2002 PASS
DetailsJim Storey
DOC - Permit Finaled12/30/200212/30/200212/30/2002APASS
DetailsJim Storey
Finaled by inspector at 12/30/2002 8:31:24 AM
PubWorks Occupancy Approval7/18/20027/18/20027/18/2002 DONE
Pwk permit not tied to Bld permit, R.Rokovitz signed permanent occupancy 7/18/02. 1/14/05
Issue PAID IN FULL permit  3/5/2002 DONE
Routing - PLAN CHECK3/4/20023/4/20023/4/2002 DONE
Print Pending Permit.LaserJet4  3/4/2002 DONE
PLANS/APPL TAKEN TO FRONT DESK  3/4/2002  
Telephone call  3/4/2002 DONE
Inspection Record Card- Bld  3/4/2002 DONE
Plan assigned to (KMM)1/23/2002 3/4/2002 PASS
DetailsKathy Miller
3/4/2002 14:11:10 KMM - activity updated through activity BLDA022 from case BLD02-00133.
Routing - FIRE2/27/2002 3/4/2002 PASS
Routing - PLUMBING2/26/2002 2/27/2002 PASS
provide a dip tube on the discharge side of the septic tank, provide gas tight covers on the septic tank and pump chamber.
Routing - PLAN CHECK2/15/2002 2/26/2002  
Plan resubmittals received  2/26/2002 DONE
received two copies of revised sheet sp-1. Put with plans.
Routing - FIRE2/12/2002 2/15/2002 FAIL
Routing - PLANNING Land Div2/8/2002 2/12/2002 PASS
Land division ok. Returned to Plan Review. (blc)
Routing - PLUMBING2/7/2002 2/8/2002 FAIL
please provide a plan showingm the septic tank, pump station, pump detail, venting and sewer connections.
Routing - PLANNING2/7/2002 2/7/2002 PASS
Routing - PUBLIC WORKS2/4/2002 2/6/2002 PASS
Routing - PLANNING Land Div2/6/2002 2/6/2002 FAIL
Still need recorded copy of all 4deeds from ROS #3303. Routed back to Plan Review. (blc)
Routing - PLANNING Land Div1/24/2002 2/4/2002 FAIL
Need copies of deeds recorded after ROS #3303. Routed to Public Works. (blc)
Plan routing begun/NEW & ADDTN  1/23/2002 DONE
Application received  1/23/2002  
Plans ACCEPTED BY PLAN TECH  1/23/2002 DONE