Permit Information
Permit NumberBLD02-00150
StatusFinaled
Name KREIZENBECK CONDOMINIUM
Site Address 199 N CAPITOL BLVD Unit: 1006
Project NameWASHINGTON MUTUAL BLDG
Customer Number 
ePlanReviewNo
Description
(KREIZENBECK CONDOMINIUM) This building is fire sprinklered to meet high-rise provisions. To remodel an existing 1,976 square foot 2 story residential condominium for a new tenant. This condominium is located on the 10th and 11th floors of an existing 112,000 square foot high-rise building. Interior demolition was covered under permit BLD02-00174. Work is to include interior nonbearing walls, a noncombustible mechanical loft supported by bearing walls, millwork, 45 minute doors, 45 minute windows, and interior finishes all per approved drawings and plan review conditions on file. The location of fire sprinkler heads shall comply with NFPA 13-1999 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes7/15/20037/15/20037/15/2003 DONE
BLD-Conference12/20/200212/20/200212/20/2002PPASS
DetailsCarl Dependahl
previously ok'd 12/20/2002 1:10:37 PM
BLD-Conference12/20/200212/20/200212/20/2002PPASS
DetailsCarl Dependahl
re final ...from aging; 12/20/2002 2:58:05 PM
DOC - Permit Finaled12/20/200212/20/200212/20/2002PPASS
DetailsCarl Dependahl
Finaled by inspector at 12/20/2002 1:10:12 PM
DOC - Permit Finaled12/20/200212/20/200212/20/2002PPASS
DetailsCarl Dependahl
Finaled by inspector at 12/20/2002 2:58:09 PM
BLD-Final5/31/20026/3/20026/3/2002APASS
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 05/31/2002 at 14:50:51. Contact: ###-####.
BLD-Framing/Rough-in6/3/20026/3/20026/3/2002APART
DetailsCarl Dependahl
corridor peneterations...45 min glazing assy's...partitions ...ok
Permanent Occupancy 6/3/20026/3/2002 DONE
Details
Permanent occupancy  6/3/2002 DONE
Perm. Occ. Cert. #9155 issued to Kreizenbeck Condominium 6/3/02 aml
FIRE-Final Inspection5/31/20025/31/20025/31/2002PPASS
DetailsRick Jackson
Scheduled by Inspector: 409 On 5/31/2002 3:36:39 PM
BLD-Conference5/31/20025/31/20025/31/2002PPASS
DetailsCarl Dependahl
w/ bldr re accessibility issues...doesn't apply to SFD
FIRE-Final Inspection5/30/20025/31/20025/31/2002AFAIL
DetailsRick Jackson
###-#### Ralph need sprinkler plans submitted; corridor wall penetrations 5/31/2002 10:22:40 AM
BLD-Final5/30/20025/31/20025/31/2002PNR
DetailsCarl Dependahl
###-####
Issue PAID IN FULL permit  2/20/2002 DONE
Routing - PLAN CHECK2/19/2002 2/19/2002 PASS
PLANS/APPL TAKEN TO FRONT DESK  2/19/2002 PASS
Inspection Record Card- Bld  2/19/2002 DONE
Print Occupancy Form  2/19/2002 DONE
Telephone call  2/19/2002 DONE
Plan assigned to (CJW)1/25/2002 2/19/2002 PASS
DetailsCarl Westfall
2/19/2002 08:07:03 CJW - activity updated through activity BLDA022 from case BLD02-00150.
Routing - FIRE2/14/2002 2/18/2002 PASS
Plan Review Completed(1st rev)  2/18/2002 PASS
Routing - PLAN CHECK1/29/2002 2/14/2002 PASS
UBC plan review started February 13, 2002 and finished the next day. The drawings were approved with conditions. See the conditions list. A plan review report was sent to the architect.
Meeting  1/29/2002 DONE
Mr. Kreizenbeck stopped by asking for the demo permit (separate certificate of values for demo was included with permit application). I talked to Carl Westfall, and the permit is not ready yet and to let Mr. Kreizenbeck know that the ladies up front will call him when it is ready.
Routing - PUBLIC WORKS1/25/2002 1/29/2002 PASS
as per approved plans
First Notice1/24/20021/24/20021/24/2002 DONE
Plans ACCEPTED BY PLAN TECH  1/24/2002 DONE
1. Plans not fully dimensioned.
2. No building code data on front sheet of plans.
Application received  1/24/2002  
CHANGE STATUS TO (PND)  1/24/2002 DONE
SHOULD HAVE JUST A TAKE MONEY ISSUE ///DLD
Recd Pcfee & Taken To Pln CK  1/24/2002 DONE