Fee Review-notes | 1/25/2002 | 1/25/2002 | 4/30/2004 | | DONE |
|
|
|
|
Fee Review-notes | 7/15/2003 | 7/15/2003 | 7/15/2003 | | DONE |
|
|
|
|
Permanent Occupancy | | 5/28/2003 | 5/28/2003 | | DONE |
|
|
|
|
BLD-Final | 5/27/2003 | 5/28/2003 | 5/28/2003 | A | PASS |
Jim Sly
|
|
|
steve please call first; Phone #: ###-#### Internet Inspection Request from: Barbara Moore OK for Perm Occ. 5/28/2003 11:17:30 AM
|
First Notice | | 5/28/2003 | 5/28/2003 | | DONE |
|
|
|
|
Permanent occupancy | | | 5/28/2003 | | DONE |
|
|
|
Perm. Occ. Cert. #9661 issued 5-28-03 to New Heights Christian Fellowship (addn.)
|
BLD-Final | 5/14/2003 | 5/14/2003 | 5/14/2003 | P | PART |
Jim Sly
|
|
|
MEL; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie OK for Temp occ. C/N Need to obtain Perm Occ status within 90 days of this notice. 5/14/2003 3:25:13 PM
|
FIRE-Final Inspection | 5/14/2003 | 5/14/2003 | 5/14/2003 | A | PASS |
Troy Cobbley
|
|
|
Fire sprinklers, fire alarm and fire life safety finaled
|
Temporary occupancy | | | 5/14/2003 | | DONE |
|
|
|
Temp. Occ. Cert. #4952 issued 5-14-03 to New Heights Christian Church (addn.)
|
FIRE-Final Inspection | 5/13/2003 | 5/13/2003 | 5/13/2003 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given for fire alarm until the fire alarm permit is finaled. Life safety is OK other than the fire alarm
|
BLD-Final | 5/13/2003 | 5/13/2003 | 5/13/2003 | P | FAIL |
Jim Sly
|
|
|
mel; Phone #: ###-#### Internet Inspection Request from: Annette Moore Need signatures. 5/13/2003 3:18:14 PM
|
PubWorks Occupancy Approval | 5/9/2003 | 5/9/2003 | 5/9/2003 | | DONE |
|
|
|
Drainage project complete, signed permanent occupancy 5/9/03. R.Rokovitz
|
BLD-Conference | 5/9/2003 | 5/9/2003 | 5/9/2003 | A | DONE |
Troy Cobbley
|
|
|
I left a correction notice with construction superintendant, Mel, stating that the new addition to the church can not be occupied until all sign offs had been received and a Certificate of Occupancy is issued.
|
BLD-Final | 5/8/2003 | 5/8/2003 | 5/8/2003 | P | FAIL |
Jim Sly
|
|
|
MEL; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Need all req signatures 5/8/2003 3:57:23 PM
|
BLD-Framing/Rough-in | 4/22/2003 | 4/22/2003 | 4/22/2003 | P | PART |
Jim Sly
|
|
|
###-#### Corridors and grid OK. 4/22/2003 4:12:27 PM
|
BLD-Framing/Rough-in | 4/11/2003 | 4/11/2003 | 4/11/2003 | P | PART |
Jim Sly
|
|
|
###-#### 4/11/2003 5:19:39 PM 91-3014 4/11/2003 5:19:39 PM 4/11/2003 5:20:41 PM Frame at N.E. corner by Mech room....OK. 4/11/2003 5:21:25 PM
|
BLD-Framing/Rough-in | 2/28/2003 | 2/28/2003 | 2/28/2003 | P | PART |
Jim Sly
|
|
|
###-#### MEL Kitchen area and adjacent rooms......East corridor OK for cover. 2/28/2003 3:07:36 PM
|
BLD-Framing/Rough-in | 2/13/2003 | 2/13/2003 | 2/13/2003 | P | PART |
Jim Sly
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung OK to cover West 1/2 of bldg....front entry and canopy. 2/13/2003 2:47:29 PM
|
BLD-Framing/Rough-in | 2/11/2003 | 2/11/2003 | 2/11/2003 | P | PART |
Jim Sly
|
|
|
###-#### OK to cover East wall Mech room. 2/11/2003 2:21:44 PM
|
BLD-Framing/Rough-in | 2/7/2003 | 2/7/2003 | 2/7/2003 | P | PART |
Jim Sly
|
|
|
mel; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie OK to cover both sides of Kitch wall between grid lines C&B No electr in upper part this wall. 2/7/2003 1:26:28 PM
|
BLD-Framing/Rough-in | 2/3/2003 | 2/3/2003 | 2/3/2003 | P | PART |
Jim Sly
|
|
|
###-#### Walk thru with Mel prior to frame insp. 2/3/2003 3:43:41 PM
|
BLD-Framing/Rough-in | 12/9/2002 | 12/9/2002 | 12/9/2002 | P | PART |
Jim Sly
|
|
|
###-#### OSB shear at West wall.....OK for veneer brick. 12/9/2002 2:55:04 PM
|
BLD-Framing/Rough-in | 10/24/2002 | 10/25/2002 | 10/25/2002 | P | PART |
Dave Hannah
|
|
|
MEL; Phone #: ###-#### Internet Inspection Request from: Darla Downs masonry inspected by M.T.I. 10/25/2002 4:33:23 PM
|
BLD-Foundation | 10/16/2002 | 10/17/2002 | 10/17/2002 | A | PART |
Tom Arcoraci
|
|
|
masonary insp mel; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie mti on site 10/17/2002 8:42:57 AM
|
BLD-Conference | 10/9/2002 | 10/10/2002 | 10/10/2002 | A | DONE |
Dave Hannah
|
|
|
###-#### can call for conference and just talk over the phone masonry issues 10/10/2002 11:55:04 AM
|
BLD-Footing | 8/7/2002 | 8/8/2002 | 8/8/2002 | P | PART |
Tom Arcoraci
|
|
|
###-#### mti on site 8/8/2002 10:21:34 AM
|
BLD-Foundation | 7/29/2002 | 7/30/2002 | 7/30/2002 | P | PART |
Dave Hannah
|
|
|
###-#### MEL
|
BLD-Footing | 7/25/2002 | 7/26/2002 | 7/26/2002 | A | PART |
Tom Arcoraci
|
|
|
###-#### mel mti on site
7/26/2002 8:26:19 AM
|
BLD-Footing | 7/22/2002 | 7/23/2002 | 7/23/2002 | P | PART |
Dave Hannah
|
|
|
mel; Phone #: ###-#### mti on site to test conc and inspect rebar 7/23/2002 4:26:34 PM
|
BLD-Foundation | 7/22/2002 | 7/23/2002 | 7/23/2002 | P | PART |
Dave Hannah
|
|
|
mel; Phone #: ###-####
|
BLD-Foundation | 7/17/2002 | 7/18/2002 | 7/18/2002 | A | PART |
Dave Hannah
|
|
|
; Phone #: ###-####
|
BLD-Footing | 7/12/2002 | 7/15/2002 | 7/15/2002 | A | NR |
Dave Hannah
|
|
|
FT MEL- ###-#### will have mti check be for placing conc 7/15/2002 10:35:17 AM
|
BLD-Footing | 7/9/2002 | 7/10/2002 | 7/10/2002 | A | NR |
Dave Hannah
|
|
|
late am ###-####
|
BLD-Footing | 7/10/2002 | 7/10/2002 | 7/10/2002 | P | PART |
Dave Hannah
|
|
|
mti on site this project is being covered by spec inspection nent over project with in spector 7/10/2002 2:51:26 PM
|
Issue PAID IN FULL permit | | | 5/16/2002 | | DONE |
|
|
|
|
Telephone call | | | 5/2/2002 | | DONE |
|
|
|
talked to jim main to verify plans are ready & need info from a.c.h.d./mls
|
Routing Off Site - STRUCTURAL | 3/11/2002 | | 3/22/2002 | | PASS |
|
|
|
Contacted PDQ to take resubmitted plans of 3/11/02 to outside eng. KMM
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/22/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/22/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/22/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/22/2002 | | DONE |
|
|
|
|
Telephone call | | | 3/22/2002 | | DONE |
|
|
|
Called Jim Main permit ready, fees due and need ACHD
|
Plan assigned to (MLO) | 1/25/2002 | | 3/22/2002 | | PASS |
Mike Otto
|
|
|
3/22/2002 09:19:44 MLO - activity updated through activity BLDA022 from case BLD02-00155.
|
Routing - PLAN CHECK | 3/14/2002 | | 3/15/2002 | | PASS |
|
|
|
|
Plan resubmittals received | | | 3/14/2002 | | DONE |
|
|
|
Received one sets of resubmittal sheets 3.30, 3.41, 3.70, 5.20, and 5.21with transmittal. Routed to Mike Otto.
|
Routing - PLANNING Land Div | 3/5/2002 | | 3/14/2002 | | PASS |
|
|
|
Land division verified. Returned to Plan Review. (blc)
|
Plan resubmittals received | | | 3/11/2002 | | DONE |
|
|
|
Received three sets of resubmittal sheets 14.00, 14.01. 14.11. 14.17, 14.18, 14.21, 14.29, 14.30, 14.3. Received two sets of resubmittal sheets3..0, 3.41, 3.70, 5.20, 5.21, Pinnacle Engineers structural plan review comments, Door Schedule, Structural Calculations, and one copy of the cover letter with response. Routed to Mike Otto.
|
Override - Parcel Holds | | | 3/5/2002 | | |
|
|
|
|
Routing - PUBLIC WORKS | 2/22/2002 | | 3/1/2002 | | PASS |
|
|
|
plans returned to plan check
|
Routing - FIRE | 2/19/2002 | | 2/22/2002 | | PASS |
|
|
|
as noted
|
Plan resubmittals received | | | 2/20/2002 | | DONE |
|
|
|
Received three copies of rvised site plan, one copy of Boise City Transmittal requesting additional information, one copy personal representative's deed of subject property and one packet Ada County Assesors Plat maps & property master. Routed to Mike O. Site plans not signed. kmm
|
Routing - PLAN CHECK | 2/12/2002 | | 2/19/2002 | | FAIL |
|
|
|
corrections sent to architect
|
Routing Off Site - STRUCTURAL | 1/26/2002 | | 2/19/2002 | | FAIL |
|
|
|
CONTACTED PDQ TO TAKE PLANS TO OUTSIDE ENG. KMM Corrections sent to architect. MLO
|
Plan resubmittals requested | | | 2/19/2002 | | FAIL |
|
|
|
UBC and structural corrections
|
Routing - PLUMBING | 2/8/2002 | | 2/12/2002 | | PASS |
|
|
|
detail page P2.1 should be a wh-1, if an automatic soap dispensor is installed at the ss-1, provide a water supply for it.
|
Routing - PLANNING | 2/6/2002 | | 2/8/2002 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 2/4/2002 | | 2/6/2002 | | FAIL |
|
|
|
|
Routing - PLANNING Land Div | 1/25/2002 | | 2/4/2002 | | FAIL |
|
|
|
1) Need a new site plan which shows entire parcel and dimensions. 2) Need to see current deed to verify legal description - discrepancy between ArcView and AS/400. 3) Need to do a density reduction Record of Survey to combine 4 lots into one since they can't build over lot lines. Routed to Public Works. (blc)
|
Plans ACCEPTED BY PLAN TECH | | | 1/25/2002 | | DONE |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 1/25/2002 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 1/25/2002 | | |
|
|
|
|
Override - Parcel Holds | | | 1/25/2002 | | |
|
|
|
|
Application received | | | 1/25/2002 | | |
|
|
|
|
Override - Parcel Holds | | | 1/25/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/25/2002 | | |
|
|
|
|