Permit Information
Permit NumberBLD02-00161
StatusFinaled
Name HASTINGS
Site Address 7500 W FAIRVIEW AVE
Project NameWESTGATE SHOPPING CNTR
Customer Number 
ePlanReviewNo
Description
(HASTINGS - TENANT EXPANSION) This building is fire sprinklered for area increase. To expand an existing 16,500 square foot retail sales tenant space into an adjacent 10,200 square foot area. After the expansion, this tenant space will have a total floor area of 26,700 square feet. This permit replaces BLD01-02863 which was issued earlier. A food preparation and a food service area are also being created under this permit. Work is to include interior nonbearing walls, 2 restrooms accessible to the disabled, suspended ceilings, display fixtures, checkout aisles, and millwork all per approved drawings and plan review conditions on file. Openings in an existing 2-hr area separation wall are being filled in with 2-hr fire-resistive wall construction. The location of fire sprinkler heads shall comply with NFPA 13-1999 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes1/25/20021/25/20026/24/2002 DONE
Permanent occupancy UNPAID FEE  4/12/2002 DONE
Perm. Occ. Cert. #9103 issued 4-12-02 to Hastings (expansion).
Permanent Occupancy 4/9/20024/9/2002 DONE
Details
BLD-Final4/8/20024/9/20024/9/2002APASS
DetailsTom Arcoraci
###-#### jim ok for perm occ 4/9/2002 11:23:38 AM
FIRE-Alarm Testing4/5/20024/8/20024/8/2002APASS
DetailsTroy Cobbley
fire alarm system finaled 4/8/2002 10:11:16 AM
FIRE-Final Inspection4/5/20024/8/20024/8/2002APASS
DetailsTroy Cobbley
fire alarm, fire sprinklers and fire/life safety finaled 4/8/2002 10:11:47 AM
BLD-Final4/5/20024/8/20024/8/2002AFAIL
DetailsDave Hannah
Scheduled by a contractor via Hello! on 04/05/2002 at 17:02:49. Contact: ###-####. entry door not set up to brake away at 30 lbs need to remove thumb latches with key and post sign above door dr to remain unlocked during bs hours 4/8/2002 12:09:27 PM
Temporary occupancy  4/8/2002 DONE
Temp. Occ. Cert. #4783 issued 4-8-02 to Hastings (expansion).
FIRE-Final Inspection4/5/20024/5/20024/5/2002PPASS
DetailsTroy Cobbley
life/safety finaled. 4/5/2002 3:13:48 PM
FIRE-Alarm Testing4/5/20024/5/20024/5/2002PFAIL
DetailsTroy Cobbley
two duct detectors in the new area of the store do not work and need testing, signals need to be reverified to the monitoring station (alarm,trouble and supervisiory) 4/5/2002 3:12:09 PM
BLD-Final4/5/20024/5/20024/5/2002PNR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 04/05/2002 at 09:40:18. Contact: ###-####.
FIRE-Final Inspection4/3/20024/3/20024/3/2002PNR
DetailsTroy Cobbley
fire alarm and life/safety not ready 4/3/2002 4:20:06 PM
FIRE-Final Inspection4/2/20024/2/20024/2/2002PPASS
DetailsTroy Cobbley
Fire sprinklers OK
BLD-Framing/Rough-in3/28/20023/29/20023/29/2002APART
DetailsDave Hannah
grid ceiling cover- jim ###-#### ok to cover 3/29/2002 12:15:38 PM
BLD-Framing/Rough-in3/27/20023/28/20023/28/2002APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 03/27/2002 at 17:59:34. Contact: ###-####. Coffee room..... Need (1) lateral wall brace check at ceiling insp. 3/28/2002 10:26:18 AM
BLD-Wall cover3/27/20023/28/20023/28/2002APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 03/27/2002 at 18:00:19. Contact: ###-####. OK to cover wall at coffee room. 3/28/2002 10:26:45 AM
BLD-Framing/Rough-in3/28/20023/28/20023/28/2002PPART
DetailsDave Hannah
CEILING GRID INSPECT ###-#### JIM pods ok but still need to wire ends of runs 3/28/2002 3:18:38 PM
BLD-Wall cover3/19/20023/19/20023/19/2002PPASS
DetailsRuss Owen
Scheduled by a contractor via Hello! on 03/19/2002 at 10:55:10. Contact: ###-####.
BLD-Framing/Rough-in3/15/20023/15/20023/15/2002PPART
DetailsDave Hannah
fr for walls--insp- jim ###-#### front office areaok need top of wall to roof 45 angel braces 3/15/2002 5:37:08 PM
Plan assigned to (CJW)1/29/2002 3/8/2002 PASS
DetailsCarl Westfall
3/8/2002 09:25:22 CJW - activity updated through activity BLDA022 from case BLD02-00161.
Routing - PLAN CHECK3/5/2002 3/8/2002 PASS
(3-6-02) Completed resubmittal review. Required response to 3 items. Faxed report to the architect. (3-8-02) Completed 2nd resubmittal review. Drawings approved with conditions.
PLANS/APPL TAKEN TO FRONT DESK  3/8/2002 PASS
Inspection Record Card- Bld  3/8/2002 DONE
Print Occupancy Form  3/8/2002 DONE
Telephone call  3/8/2002 DONE
SPOKE WITH KYLE PLANS READY
Issue PAID IN FULL permit  3/8/2002 DONE
Plan resubmittals received  3/7/2002 DONE
Received two sets of resubmittal sheets F-1, A-3, A-1 with cover letter. Routed to Carl Westfall.
Routing Off Site - C.D.H2/28/2002 3/5/2002 PASS
Carol took plans to CDH and gave to Bud. kmm
Plan resubmittals received  3/1/2002 DONE
Received two copies of revised sheets A-1, A-3,F-1, P-1, one plan response. Routed to Carl W. kmm
Routing - PLUMBING2/25/2002 2/28/2002 PASS
after conversation with ECI, provide a floor sink and water for equipment at the island in the coffee area, all floor sinks must be exposed, out from under cabinets and equipment, additional cross connection protection may be required, if an automatic soap dispensor is installed at the mop sink, provide a water supply for it.
Plan Review Completed(1st rev)  2/25/2002  
Failed first UBC review.
Routing - FIRE2/20/2002 2/25/2002 PASS
Routing - PLAN CHECK1/29/2002 2/20/2002  
Failed first UBC review. UBC plan review started February 15 and finished February 20, 2002. Resubmitted drawings were required from the architect. See the conditions list. A copy of the plan review report was sent to the architect.
Routing - PUBLIC WORKS1/29/2002 1/29/2002 PASS
Plans ACCEPTED BY PLAN TECH  1/28/2002 DONE
Application received  1/25/2002  
Recd Pcfee & Taken To Pln CK  1/25/2002 DONE