Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD02-00167
StatusFinaled
Name STEVEN GREGORY
Site Address 2221 -23 S PACIFIC ST
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 2820 sq. ft. two story DUPLEX. Each unit is a three bedroom, two and quarter bathroom 1410 sq. ft. (613 sq. ft. first floor/797 sq. ft. second floor) with a attached 466 sq. ft. two car garage and a 43 sq. ft. covered front entry. THIS STRUCTURE IS BEING CONSTRUCTED AS A DUPLEX ONLY. Per approved plans, engineering and requirement list. PC#032 (SAM)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/4/20026/5/20026/5/2002PPASS
DetailsJim Storey
###-#### key above front door final ok c/n made ok 6/5/2002 9:01:28 AM
DOC - Permit Finaled6/5/20026/5/20026/5/2002APASS
DetailsJim Storey
Finaled by inspector at 6/5/2002 9:01:55 AM
BLD-Final6/3/20026/4/20026/4/2002AFAIL
DetailsDave Hannah
###-#### lon key above front door c/n on site 6/4/2002 11:08:26 AM
BLD-Energy code compliance4/16/20024/17/20024/17/2002APASS
DetailsJim Storey
###-####
BLD-Framing/Rough-in4/15/20024/16/20024/16/2002APASS
DetailsJim Storey
###-#### LON
BLD-Wall cover3/27/20023/27/20023/27/2002PPASS
DetailsJim Storey
Added by Inspector: 301 On 3/27/2002 4:35:33 PM 2nd floor gyp nailling ok to stand walls and trusses.
BLD-Framing/Rough-in3/22/20023/22/20023/22/2002PPART
DetailsSteven Webb
fire wall LON ###-#### Fire wall on 1st floor-draftstop and fireblocking verified with 1" air space per plans 3/22/2002 12:52:18 PM
BLD-Conference3/20/20023/20/20023/20/2002PFAIL
DetailsCarl Dependahl
###-#### LON would like to have conf at work site; obtain legible plans/eng'g and compile list of questions, then recall when ready 3/20/2002 3:25:32 PM
BLD-Foundation3/12/20023/13/20023/13/2002APART
DetailsJim Storey
###-#### fireplace deleted/ wall lateral ok to delete straps in back corners will meet with out alternet pannels. 3/13/2002 8:57:38 AM
BLD-Footing3/11/20023/12/20023/12/2002APART
DetailsJim Storey
JAY\\attn.Jim Storey this was missed yesterday afternoon because we forgot to put the inspector in the assigned to part sorry\\rita
Issue PAID IN FULL permit  3/5/2002 DONE
Telephone call  2/21/2002 DONE
Inspection Record Card- Bld  2/13/2002 DONE
Plan Reviewer's activity  2/12/2002 PEND
2/11/02 I recieved the additional information from the engineer that I requested this afternoon. ONLY ONE set of plans is being approved due to excessive red-lining.
Plan Review Report  2/12/2002  
PLANS/APPL TAKEN TO FRONT DESK  2/12/2002 DONE
Routing - PLAN CHECK1/29/2002 2/12/2002 DONE
Plan assigned to (SAM)1/31/2002 2/12/2002 PASS
DetailsSteve Munroe
2/12/2002 16:31:11 SAM - activity updated through activity BLDA022 from case BLD02-00167.
Plan Reviewer's activity  2/1/2002 PEND
2/1/02 10:50 I called and talked to Rodney, the engineer. I asked him about the three shear panel, steel moment frame, beam B11, beam B2 and post under B2. He said he will get back with me. I also called the builder.
Routing - PUBLIC WORKS1/29/2002 1/29/2002 PASS
Application received  1/28/2002  
Routing - PLANNING1/28/2002 1/28/2002 PASS