BLD-Final | 6/4/2002 | 6/5/2002 | 6/5/2002 | P | PASS |
Jim Storey
|
|
|
###-#### key above front door final ok c/n made ok 6/5/2002 9:01:28 AM
|
DOC - Permit Finaled | 6/5/2002 | 6/5/2002 | 6/5/2002 | A | PASS |
Jim Storey
|
|
|
Finaled by inspector at 6/5/2002 9:01:55 AM
|
BLD-Final | 6/3/2002 | 6/4/2002 | 6/4/2002 | A | FAIL |
Dave Hannah
|
|
|
###-#### lon key above front door c/n on site 6/4/2002 11:08:26 AM
|
BLD-Energy code compliance | 4/16/2002 | 4/17/2002 | 4/17/2002 | A | PASS |
Jim Storey
|
|
|
###-####
|
BLD-Framing/Rough-in | 4/15/2002 | 4/16/2002 | 4/16/2002 | A | PASS |
Jim Storey
|
|
|
###-#### LON
|
BLD-Wall cover | 3/27/2002 | 3/27/2002 | 3/27/2002 | P | PASS |
Jim Storey
|
|
|
Added by Inspector: 301 On 3/27/2002 4:35:33 PM 2nd floor gyp nailling ok to stand walls and trusses.
|
BLD-Framing/Rough-in | 3/22/2002 | 3/22/2002 | 3/22/2002 | P | PART |
Steven Webb
|
|
|
fire wall LON ###-#### Fire wall on 1st floor-draftstop and fireblocking verified with 1" air space per plans 3/22/2002 12:52:18 PM
|
BLD-Conference | 3/20/2002 | 3/20/2002 | 3/20/2002 | P | FAIL |
Carl Dependahl
|
|
|
###-#### LON would like to have conf at work site; obtain legible plans/eng'g and compile list of questions, then recall when ready 3/20/2002 3:25:32 PM
|
BLD-Foundation | 3/12/2002 | 3/13/2002 | 3/13/2002 | A | PART |
Jim Storey
|
|
|
###-#### fireplace deleted/ wall lateral ok to delete straps in back corners will meet with out alternet pannels. 3/13/2002 8:57:38 AM
|
BLD-Footing | 3/11/2002 | 3/12/2002 | 3/12/2002 | A | PART |
Jim Storey
|
|
|
JAY\\attn.Jim Storey this was missed yesterday afternoon because we forgot to put the inspector in the assigned to part sorry\\rita
|
Issue PAID IN FULL permit | | | 3/5/2002 | | DONE |
|
|
|
|
Telephone call | | | 2/21/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/13/2002 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 2/12/2002 | | PEND |
|
|
|
2/11/02 I recieved the additional information from the engineer that I requested this afternoon. ONLY ONE set of plans is being approved due to excessive red-lining.
|
Plan Review Report | | | 2/12/2002 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/12/2002 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 1/29/2002 | | 2/12/2002 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 1/31/2002 | | 2/12/2002 | | PASS |
Steve Munroe
|
|
|
2/12/2002 16:31:11 SAM - activity updated through activity BLDA022 from case BLD02-00167.
|
Plan Reviewer's activity | | | 2/1/2002 | | PEND |
|
|
|
2/1/02 10:50 I called and talked to Rodney, the engineer. I asked him about the three shear panel, steel moment frame, beam B11, beam B2 and post under B2. He said he will get back with me. I also called the builder.
|
Routing - PUBLIC WORKS | 1/29/2002 | | 1/29/2002 | | PASS |
|
|
|
|
Application received | | | 1/28/2002 | | |
|
|
|
|
Routing - PLANNING | 1/28/2002 | | 1/28/2002 | | PASS |
|
|
|
|