BLD-Final | 8/14/2002 | 8/15/2002 | 8/15/2002 | A | PASS |
Dave Hannah
|
|
|
###-####c.c # 17622 issued 8/15/2002 11:26:26 AM
|
DOC - Permit Finaled | 8/15/2002 | 8/15/2002 | 8/15/2002 | A | PASS |
Dave Hannah
|
|
|
Finaled by inspector at 8/15/2002 11:26:28 AM
|
BLD-Energy code compliance | 4/17/2002 | 4/18/2002 | 4/18/2002 | P | PASS |
Dave Hannah
|
|
|
###-#### johnny all c/n items on framing complted ok to cover 4/18/2002 4:02:16 PM
|
BLD-Framing/Rough-in | 4/16/2002 | 4/17/2002 | 4/17/2002 | A | PART |
Dave Hannah
|
|
|
fr insp -johnny ###-#### c/n on site ok to insulate 4/17/2002 9:57:04 AM
|
BLD-Framing/Rough-in | 4/1/2002 | 4/2/2002 | 4/2/2002 | A | PART |
Dave Hannah
|
|
|
shear nail--johnny ###-#### ok to cover ext 4/2/2002 12:03:51 PM
|
BLD-Foundation | 2/25/2002 | 2/25/2002 | 2/25/2002 | P | PASS |
Dave Hannah
|
|
|
###-####
|
BLD-Footing | 2/22/2002 | 2/22/2002 | 2/22/2002 | P | PASS |
Dave Hannah
|
|
|
###-#### robert
|
Issue PAID IN FULL permit | | | 2/20/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/14/2002 | | DONE |
|
|
|
|
Telephone call | | | 2/14/2002 | | DONE |
|
|
|
SPOKE WITH SECRETARY SHANELLE PLANS READY
|
Plan assigned to (DJO) | 2/5/2002 | 2/5/2002 | 2/13/2002 | | PASS |
Dan Overy
|
|
|
2/13/2002 08:45:57 DJO - activity updated through activity BLDA022 from case BLD02-00185.
|
Plan Reviewer's activity | | | 2/13/2002 | | DONE |
|
|
|
received engineering for lateral wall bracing at front wall line. garage front will be an engineered system from idaho truss. verbal from true engineering to add notes for overheight wall studs
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/13/2002 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 2/5/2002 | | |
|
|
|
|
Plan Reviewer's activity | | | 2/5/2002 | | PEND |
|
|
|
engineering for overheight walls and garage front have not been included. alternate panels will not comply with stud lengths exceeding 10ft. will issue permit when this and all information is received.
|
Case Summary (BLD) | | | 2/5/2002 | | PEND |
|
|
|
|
Plan Review Report | | | 2/5/2002 | | PEND |
|
|
|
|
Routing - PLANNING | 1/30/2002 | | 1/31/2002 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 1/31/2002 | | 1/31/2002 | | PASS |
|
|
|
|
Application received | | | 1/30/2002 | | |
|
|
|
|
Pending Assignment by DJO | 1/30/2002 | | | | |
Dan Overy
|
|
|
|
Routing - PLAN CHECK | 2/1/2002 | | | | |
|
|
|
|