Permit Information
Permit NumberBLD02-00189
StatusFinaled
Name BARKER ROSHOLT & SIMPSON LLP
Site Address 205 N 10TH ST Unit: 520
Project NameEMPIRE BLDG-5TH FLR
Customer Number 
ePlanReviewNo
Description
(BARKER ROSHOLT & SIMPSON) This building is fire sprinklered under the provisions of the 1994 UCBC because it is too tall, too big, and has too many stories. To construct a 2,627 square foot office tenant space on the 5th floor of the Empire Building (North end). Work is to include interior nonbearing walls, suspended ceilings, interior doors and window, and interior finishes all per approved drawings and plan review conditions on file. The location of fire sprinkler heads shall comply with NFPA 13-1999 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes7/15/20037/15/20037/15/2003 DONE
Additional value from subcontractor (ele).
Fee Review-notes1/30/20021/30/20028/21/2002 DONE
13000.00 difference for ele still waiting on mec final cert
Permanent occupancy  5/8/2002 DONE
Perm. Occ. Cert. #9125 issued 5-8-02 to Barker Rosholt & Simpson LLP on the 5th floor of the Empire Bldg.
BLD-Final4/26/20024/29/20024/29/2002APASS
DetailsRuss Owen
tim ###-#### fn . Ok perm signature on card. 4/29/2002 12:27:30 PM
Permanent Occupancy 4/29/20024/29/2002 DONE
Details
BLD-Final4/25/20024/25/20024/25/2002PPART
DetailsCarl Dependahl
fn tim -###-#### seal firestop penetrations at stair landing; t/o ok. 4/25/2002 4:34:52 PM
FIRE-Final Inspection4/25/20024/25/20024/25/2002PPASS
DetailsRick Jackson
Added by Inspector: 409 On 4/25/2002 12:00:56 PM
BLD-Framing/Rough-in4/9/20024/10/20024/10/2002APART
DetailsCarl Dependahl
ceiling grid- tim ###-#### ...grid clg ok 4/10/2002 3:46:53 PM
BLD-Framing/Rough-in3/4/20023/4/20023/4/2002PPART
DetailsCarl Dependahl
tim ###-#### - wall cover walls ok 3/4/2002 4:01:24 PM
Issue PAID IN FULL permit  2/28/2002 DONE
Routing - PLAN CHECK2/26/2002 2/27/2002 PASS
PLANS/APPL TAKEN TO FRONT DESK  2/27/2002 PASS
Inspection Record Card- Bld  2/27/2002  
Print Occupancy Form  2/27/2002  
Telephone call  2/27/2002 DONE
left mess with matt that permit is ready
Plan assigned to (CJW)2/5/2002 2/27/2002 PASS
DetailsCarl Westfall
2/27/2002 08:10:54 CJW - activity updated through activity BLDA022 from case BLD02-00189.
Plan Review Completed(1st rev)  2/26/2002 PASS
Routing - FIRE2/21/2002 2/25/2002 PASS
Routing - PLAN CHECK2/6/2002 2/21/2002 PASS
UBC plan review started February 20, 2002 and finished the next day. The drawings were approved with conditions. See the conditions list. A copy of the Plan Review Report was sent to the architect.
Routing - PUBLIC WORKS2/5/2002 2/6/2002 PASS
Plans ACCEPTED BY PLAN TECH  1/31/2002 DONE
1. Plans state in the General Notes of A2.0 that all plumbing, HVAC, electrical, and fire sprinkler system is design build by the contractor. No plumbing/mechanical plans submitted.
Application received  1/30/2002  
Recd Pcfee & Taken To Pln CK  1/30/2002 DONE