BLD-Aging Inspection | 10/27/2006 | 10/27/2006 | 11/1/2006 | | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 8/18/2006 | 8/18/2006 | 8/25/2006 | | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 6/6/2006 | 6/6/2006 | 6/7/2006 | | PASS |
Dave Hannah
|
|
|
|
Case Summary (BLD) | | | 6/5/2006 | | DONE |
|
|
|
|
BLD-Aging Inspection | 4/3/2006 | 4/3/2006 | 4/3/2006 | | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 1/31/2006 | 1/31/2006 | 2/1/2006 | P | PASS |
Dave Hannah
|
|
|
harvey -###-#### pending fire fn ok for perm occ
|
FIRE-Final Inspection | 1/31/2006 | 1/31/2006 | 1/31/2006 | P | PASS |
Forrest France
|
|
|
Fire life safety is acceptable for the permitted scope of work.
|
CHANGE STATUS TO (ISS) | | | 1/31/2006 | | DONE |
|
|
|
per dave hannah ok to re-open permit & schedule insp
|
BLD-Aging Inspection | 1/2/2006 | 1/2/2006 | 1/4/2006 | | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Expired | 1/4/2006 | 1/4/2006 | 1/4/2006 | P | PASS |
Dave Hannah
|
|
|
work is being completed under a 05 permit
|
BLD-Aging Inspection | 11/2/2005 | 11/2/2005 | 11/3/2005 | | PASS |
Dave Hannah
|
|
|
wip
|
BLD-Aging Inspection | 8/29/2005 | 8/29/2005 | 8/29/2005 | | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 6/21/2005 | 6/21/2005 | 6/23/2005 | | PASS |
Dave Hannah
|
|
|
wip
|
Telephone call | | | 4/27/2005 | | DONE |
|
|
|
per jenifer gilliland unexpire this permit. they have commenced construction/4/26/05/mls
|
CHANGE STATUS TO (ISS) | | | 4/27/2005 | | DONE |
|
|
|
per jenifer gilliland unexpire this permit. they have commenced construction/4/26/05/mls//letter on file with records
|
BLD-Conference | 4/12/2005 | 4/12/2005 | 4/12/2005 | P | FAIL |
Troy James
|
|
|
|
DOC - Permit Expired | 4/12/2005 | 4/12/2005 | 4/12/2005 | P | PASS |
Troy James
|
|
|
Expired by inspector at 4/12/2005 1:56:08 PM
|
Case Summary (BLD) | | | 4/12/2005 | | |
|
|
|
|
BLD-Aging Inspection | 3/14/2005 | 3/14/2005 | 3/14/2005 | | CANC |
Troy James
|
|
|
|
BLD-Conference | 11/30/2004 | 11/30/2004 | 11/30/2004 | A | DONE |
Troy James
|
|
|
meeting with project manager, contractor, architect, and facility manager in regards to project. Work to be started by the end of year. Plans will have to be resubmitted for review due to the changes. 11/30/2004 11:04:16 AM
|
BLD-Conference | 10/4/2004 | 10/4/2004 | 10/4/2004 | P | DONE |
Dave Hannah
|
|
|
told owner they have two weeks to start work befor this permit exsp 10/4/2004 1:56:11 PM
|
BLD - Request for Extension | 8/13/2004 | 8/16/2004 | 8/16/2004 | | PASS |
Dave Hannah
|
|
|
Still working on this project would you please contact Graeme at this # to confirm if extended//###-#### graeme leggatt
|
BLD-Aging Inspection | 7/26/2004 | 7/26/2004 | 7/26/2004 | | CANC |
Troy James
|
|
|
wip 7/26/2004 8:30:01 AM
|
BLD-Conference | 5/18/2004 | 5/18/2004 | 5/18/2004 | P | PASS |
Dave Hannah
|
|
|
ok to ext 90 days 5/18/2004 12:59:44 PM
|
BLD-Aging Inspection | 5/17/2004 | 5/17/2004 | 5/17/2004 | | FAIL |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 2/10/2004 | 2/10/2004 | 2/10/2004 | | DONE |
Dave Hannah
|
|
|
exp on 4/27 2/10/2004 12:15:43 PM
|
Issue PAID IN FULL permit | | | 10/30/2003 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/30/2003 | | DONE |
|
|
|
|
Permit EXTENDED | | | 5/1/2003 | | DONE |
|
|
|
received letter on April 22nd from Tim Hogland granting an extension for 180 days or until October 28th 2003/mls
|
CHANGE STATUS TO (R) | | | 5/1/2003 | | DONE |
|
|
|
changed status to ready/has a 180 day extension per Tim H.
|
Telephone call | | | 4/2/2003 | | DONE |
|
|
|
TALKED TO ROCKY TOWLE WILL LET OWNER KNOW THAT PERMIT NEEDS TO BE PICKED UP BY MAY OR WILL BE VOIDED
|
Telephone call | | | 12/13/2002 | | DONE |
|
|
|
TALKED TO GARY TO VERIFY PLANS ARE READY
|
Routing - PUBLIC WORKS | 11/13/2002 | | 11/14/2002 | | PASS |
|
|
|
DAN PICKED UP PLANS AND ROUTED TO LOUISE///11-13-02 DLD
11/14/02 - Plans returned to Dan Stuart. No changes made to original PW review data.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/14/2002 | | PASS |
|
|
|
Approved as noted and conditions / comments of agency code reviews attached to plans.
|
CHANGE STATUS TO (PND) | | | 11/13/2002 | | PEND |
|
|
|
DAN PICKED UP PLANS AND ROUTED TO LOUISE..11-13-02///DLD
|
Print Occupancy Form | | | 11/12/2002 | | DONE |
|
|
|
|
Telephone call | | | 11/12/2002 | | DONE |
|
|
|
permit ready
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/8/2002 | | PASS |
|
|
|
To permit desk to issue.
|
Routing - PLAN CHECK | 4/9/2002 | | 11/8/2002 | | PASS |
|
|
|
Approved as noted on plans and conditions & comments of all plan reviewing agenciesattached to and being part of the approved plans.
|
Plan resubmittals received | | | 9/17/2002 | | DONE |
|
|
|
Received two sets of resubmittal sheets COVER, C1.1, B1.1, B1.2, BE1.A1.1, A1.2, A1.3, A1.4, A1.5, A3.1, A3.2, A3.3, A4.1, A6.1, S1.1, S2.1, S2.2, K-1, K-2, K-3, K-4, K-5, K-6, K-7, P2, P3, M2, M3, with cover letter. Routed to Dan Stuart.
|
Routing - FIRE | 4/1/2002 | | 4/8/2002 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 1/31/2002 | | 3/31/2002 | | FAIL |
|
|
|
Corrections & clarifications required. Copies of corrections mailed & faxed to architect for response. Plans to fire code analyst for review.
|
Plan resubmittals requested | | | 3/29/2002 | | FAIL |
|
|
|
Mailed 30 sheets (corrections & general comments) and faxed (8 pages of correction comments only) copy of plan review to Rocky Towle for response.
|
Routing - PLUMBING | 3/6/2002 | | 3/7/2002 | | PASS |
|
|
|
install interceptor vent shown on detail, additional cross connection protection may be required, if an automatic soap dispensor is installed at the mop sinks, provide a water supply for it.
|
Routing - PUBLIC WORKS | 2/28/2002 | | 3/6/2002 | | PASS |
|
|
|
|
Routing - PLANNING | 2/21/2002 | | 2/28/2002 | | DONE |
|
|
|
|
Routing - PLANNING Land Div | 2/15/2002 | | 2/21/2002 | | FAIL |
|
|
|
Need chain of deeds back to prior to 10/30/65 to verify land division. Also need site plan showing complete parcel w/dimensions. Routed to Planning (Marty). (blc)
|
Plan assigned to (DRS) | 2/1/2002 | 2/1/2002 | 2/15/2002 | | |
Dan Stuart
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/1/2002 | | DONE |
|
|
|
1. I called Bob M. with CDHD, and the kitchen remodel will be reviewed by the Bureau of Facility Standards, so sign-off from CDHD is not required.
2. Called Rocky Towle because we still need structural calculations and a letter explaining code analysis.
3. Plans are not fully dimensioned.
4. Routed plans to Dan Stuart.
|
Additional plans submitted | | | 2/1/2002 | | DONE |
|
|
|
Received structural calculations and letter regarding code analysis. Routed to Dan Stuart.
|
Application received | | | 1/31/2002 | | |
|
|
|
|