Permit Information
Permit NumberBLD02-00199
StatusFinaled
Name IDAHO WATER CENTER (GARAGE)
Site Address 322 E FRONT ST
Project NameID WATER CENTER-GARAGE
Customer Number 
ePlanReviewNo
Description
IDAHO WATER CENTER-(GARAGE SHELL) TO CONSTRUCT A NEW 127,500 SQUARE FOOT, REINFORCED CONCRETE UNDERGROUND PARKING GARAGE (WITH 332 PARKING STALLS) WITH GRADE LEVEL CONCRETE STRUCTURAL SUPPORT DECK FOR FUTURE MULTI-STORY OFFICE, RETAIL AND RESIDENTIAL BUILDINGS, AS WELL AS, SURFACE LANDSCAPING, PARKING AND RELATED SITE IMPROVEMENTS. THIS PERMIT IS FOR THE CONSTRUCTION OF THE CONCRETE STRUCTURAL SHELL ONLY, NO FINISHES INCLUDING SHAFTS, INTERIOR PARTITIONS, STAIRWAYS, ETC. ARE APPROVED UNDER THIS PERMIT. A SEPARATE TENANT IMPROVEMENT PERMIT WILL BE REQUIRED TO FINISH THIS GARAGE FOR OCCUPANCY. THIS GARAGE IS FULLY FIRE SPRINKLED. ALL CONSTRUCTION PER THE APPROVED PLANS, ATTACHED COMMENTS, AND ATTACHED GROUND WATER DISCHARGE AGREEMENT CONDITION. THIS PERMIT HAS BEEN MODIFIED TO ALLOW CONSTRUCTION IN TWO PHASES. PHASE ONE IS THE WEST 77,000 SQUARE FOOT PORTION BETWEEN GRID LINES 1&13.5 AND WA&WK. THE SECOND PHASE IS THE REMAINING 50,500 SQUARE FOOT EAST PORTION. SEE PLAN REVIEWER ACTIVITY, DATED 2/26/03 FOR MORE DETAILED INFORMATION. DRH01-00161/CUP01-00090/PC# 67-02/JCM
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance  3/29/2005 DONE
Letter of Compliance issued 3-29-05.
Code Occupancy Approval  3/29/2005 PASS
compliance met.
BLD-Final3/24/20053/25/20053/25/2005APASS
DetailsDave Hannah
tammy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok for c.c 3/25/2005 8:38:47 AM
BLD-Footing1/14/20051/14/20051/14/2005PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 1/14/2005 at 9:47:06 AM. Contact: ###-####. ok pending spec insp sign off 1/14/2005 4:21:50 PM
Receive PAYMENT IN FULL PRINT  12/17/2004 DONE
CHANGE STATUS TO (ISS)  12/17/2004 DONE
plan mod issued previously
Telephone call  12/16/2004 DONE
left mess that permit is ready
Inspection Record Card- Bld  12/15/2004 DONE
Permit Ready to Issue  12/15/2004  
Plan assigned to (JCM)11/29/200411/29/200412/14/2004 PASS
12/14/2004 15:35:08 JCM - activity updated through activity BLDA022 from case BLD02-00199.
PLANS/APPL TAKEN TO FRONT DESK  12/14/2004 DONE
Routing - FIRE11/29/2004 12/6/2004 PASS
review faxed to aarchitect for advance notification of additional permit requirements.
Plan Modification Accepted  11/29/2004 DONE
per John Menard.
Routing - PLANNING11/29/2004 11/29/2004 PASS
Tempra Wilson
Routing - PLAN CHECK11/29/2004 11/29/2004 PASS
John Menard.
Plan Reviewer's activity  11/29/2004 PASS
Reviewed and approved plans modification to construct addtional exit stairway at the south wall from the basement garage to the exterior plaza level. JCM
Temporary occupancy  11/8/2004  
This temporary occupancy is extended for an additional 90 days based on continued access by the public to the Idaho Water Center's stairs for exiting. At the end of this 90 day period a permanent set of exit stairs is expected to be constructed and a permanent CO will be issued for the entire Water Center Garage after such construction. This temporary occupancy is due to expire on February 7, 2005.
BLD-Final11/5/200411/5/200411/5/2004PPASS
DetailsDave Hannah
Tammy; Phone #: ###-#### Internet Inspection Request from: Jan Rice
BLD-Final11/3/200411/3/200411/3/2004PNR
DetailsLane Manuel
Tammy; Phone #: ###-#### Internet Inspection Request from: Cheryl Baumgartner
No one on job site.
spoke w/ Tammy by phone. Instructed her to reschedule w/ Dave Hannah 11/3/2004 1:12:35 PM
BLD-Final10/18/200410/18/200410/18/2004PFAIL
DetailsDave Hannah
tammy ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie not ready 10/18/2004 3:54:44 PM
SUPER- Supervisor's review8/16/20048/16/20048/16/2004  
Mailed letter extending temporary approval for Water Center Garage until November 8, 2004 at which time a Letter of Compliance for the entire garage should be issued. The decision of the Water Center to secure its parking(with a fence) has necessitated the addition of a stairway prior to the occupancy of the Water Center and utilization of its parking. Failure to obtain a permanent solution may result in the removal of the temporary approval which allows the parking garage to operate. Jenifer Gilliland
BLD-Final8/10/20048/10/20048/10/2004PCANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 8/6/2004 at 2:09:30 PM. Contact: ###-####.
BLD-Final8/6/20048/9/20048/9/2004ANR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 8/6/2004 at 2:09:30 PM. Contact: ###-####.
FIRE-Final Inspection8/6/20048/6/20048/6/2004PPASS
DetailsRick Jackson
Basement fire/life safety okay; alarm and sprinkler permits finalled 8/6/2004 2:19:05 PM
FIRE-Final Inspection8/2/20048/2/20048/2/2004AFAIL
DetailsRick Jackson
Need knox box; address number on Broadway to have Front street added 8/2/2004 10:51:10 AM
Plan resubmittals received  7/20/2004 DONE
Received Transmittal Letter, & 1 Set of A0.03,A2.00, A2.01,A2.11,A2.12,A7.01,A7.02,A7.03,A7.04,A9.30,M1.2,M1.3,M2.11,M2.12,M2.13,M2.14,M3.02,M3.03,M3.11,M4.1,M5.1,M5.2,M6.1,M6.2,M6.3,M6.4,M6.6,M6.7,M6.9,M7.1,E1.01,E2.01W,E2.02W,E2.03W,E2.04W,E2.01E,E2.02E,E2.03E,E3.01W,E3.02W,E3.03W,E3.04W,E3.01E,E3.02E,E3.03E,E6.01,E6.03,E7.01,E7.03,E7.04,E8.01 Taken to John Menard
Plan Reviewer's activity  6/10/2004 PASS
Reviewed and approved plan sheets A0.03 and M4.1 showing modification approved by an alternate requested by NBBJ and approved by Jenifer Gilliland in a letter to Gary Olsen of NBBJ, dated March 20, 2004. The alternate request and modification is for the use of the 2000 International Building Code, Section 302.3.2, nonseparated uses. This for the elimination of the occupancy separation wall, required by the 1997 UBC, between the generator room and the parking garage areas. The alternate request letter and approval letter are attached to the approved revised plan sheets. JCM
Plan resubmittals received  6/9/2004 DONE
Received Transmittal Letter, 1 NBBJ Letter,1 Letter from Jenifer Gilliland, 1 Letter from Gary Olsen 1 Set of A0.03 1 Set M4.1 Taken to John Menard..
BLD-Aging Inspection6/7/20046/7/20046/7/2004 DONE
DetailsDave Hannah
wip 6/7/2004 8:14:24 AM
Plan resubmittals received  6/4/2004 DONE
Received Transmittal Letter, Letter from NBBJ to John Menard, 1 81/2 x 11 sheet A0.03, ,M4.1 , 1 Letter from Jenifer Gilliland, 1 Letter back to Jenifer Gililand & 1 8 1/2 x11 plan sheet. Taken to John Menard..
BLD-Aging Inspection3/31/20043/31/20043/31/2004 PASS
DetailsDave Hannah
wip 3/31/2004 8:12:56 AM
BLD-Framing/Rough-in1/30/20041/30/20041/30/2004PDONE
DetailsDave Hannah
dennis; Phone #: ###-#### Internet Inspection Request from: Annette Moore
Override - Parcel Holds  1/12/2004  
Temporary occupancy  1/12/2004 DONE
Temp. Occ. Cert. #5059 issued 1-12-04 to the Idaho Water Center garage Phase I PA 2 Parking.
BLD-Final1/8/20041/9/20041/9/2004PPART
DetailsDave Hannah
pete- ###-#### ok for temp occ 1/9/2004 5:18:08 PM
FIRE-Final Inspection1/8/20041/9/20041/9/2004APART
DetailsRick Jackson
###-####- pete Phase I (west parking under PA2) is okay to use pending all strcutural sign-off 1/9/2004 10:56:34 AM
Override - Parcel Holds  1/8/2004  
Override - Parcel Holds  1/8/2004  
FIRE-Final Inspection1/5/20041/6/20041/6/2004AFAIL
DetailsRick Jackson
pete-- ###-#### need stair two exit door hardware and completion of handrails - remove all construction materials and add gate at ground level; extinguishers need tags and signs above extinguishers; need heat in FACP room to maintain above 32 degrees; replace sprinkler head painted by stair two door; need signs on FDC's and locks on PIV's; sign on riser room door; 1/6/2004 4:19:21 PM
FIRE-Final Inspection1/5/20041/5/20041/5/2004PCANC
DetailsRick Jackson
###-#### pete
Override - Parcel Holds  1/5/2004  
Override - Parcel Holds  1/5/2004  
Override - Parcel Holds  1/5/2004  
Code Occupancy Approval Temp1/2/20041/2/20041/2/2004PDONE
DetailsWm. Michael Meloy
Staffed issue with Tempra Wilson, OK to grant Temp Occupancy for garage only. 1/2/2004 2:19:07 PM
Print Occupancy Form  12/31/2003 DONE
Override - Parcel Holds  12/24/2003  
Inspection Record Card- Bld  12/24/2003 DONE
BLD-Conference12/17/200312/18/200312/18/2003ADONE
DetailsDave Hannah
set up profit meeting 12/18/2003 8:59:03 AM
BLD-Conference12/17/200312/17/200312/17/2003PPART
DetailsDave Hannah
Pete; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
FIRE-Conference12/17/200312/17/200312/17/2003PPART
DetailsRick Jackson
Pete; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes met with JP and Dave Hannah about temp occupancy for the garage; will have to confer with Sam and Dave Miller about this and let JP know of any requirements 12/17/2003 4:24:38 PM
FIRE-Conference12/16/200312/16/200312/16/2003PPART
DetailsRick Jackson
pete-- ###-#### location of knox box at remote annunciator - main entrance 12/16/2003 4:09:06 PM
BLD-Framing/Rough-in12/16/200312/16/200312/16/2003PDONE
DetailsDave Hannah
pete ###-####
Override - Parcel Holds  12/16/2003  
Override - Parcel Holds  12/16/2003  
FIRE-Conference11/4/200311/5/200311/5/2003APART
DetailsRick Jackson
Pete
; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes for occupying the basement parking per Dave Miller the sprinkler system must be operational for the entire parking garage and access, alarms working, etc. 11/5/2003 3:37:04 PM
BLD-Footing10/2/200310/3/200310/3/2003APART
DetailsJim Storey
###-#### mike ###-#### mike placed day before with special insp. 10/3/2003 8:58:03 AM
BLD-Foundation8/4/20038/7/20038/7/2003PPART
DetailsCarl Dependahl
###-#### mike pend special insp reports 8/7/2003 4:16:52 PM
BLD-Footing8/4/20038/5/20038/5/2003PPART
DetailsCarl Dependahl
###-#### mike
BLD-Conference7/28/20037/28/20037/28/2003PPASS
DetailsCarl Dependahl
Randy ###-####...need plbg penetrations ok'd for 3hr deck...pvc/cast?? w pro set sleeves 7/28/2003 4:27:26 PM
BLD-Foundation7/15/20037/17/20037/17/2003PPART
DetailsCarl Dependahl
at 2ish???###-#### mike ..ok, pend reports 7/17/2003 5:08:37 PM
BLD-Conference7/2/20037/3/20037/3/2003ANR
DetailsCarl Dependahl
RE generator....need listing, etc 7/3/2003 5:59:43 PM
BLD-Conference7/1/20037/1/20037/1/2003PPASS
DetailsCarl Dependahl
w/Rick J. re generator exhaust
BLD-Conference6/25/20036/26/20036/26/2003PPASS
DetailsCarl Dependahl
w/ Margie & Randy J. re shaft req's thru deck 6/26/2003 5:22:10 PM
BLD-Foundation6/16/20036/19/20036/19/2003PPART
DetailsCarl Dependahl
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ...deck, mti onsite, receiving reports. 6/19/2003 5:26:16 PM
BLD-Foundation6/16/20036/18/20036/18/2003PPART
DetailsCarl Dependahl
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...preparing to place deck, mti onsite. 6/18/2003 3:51:26 PM
BLD-Foundation6/16/20036/16/20036/16/2003PPART
DetailsDave Hannah
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore allready poured inspected by mike spiker with MTI 6/16/2003 4:20:48 PM
BLD-Foundation6/6/20036/13/20036/13/2003APART
DetailsDave Hannah
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore covered by MTI spec inspector 6/13/2003 12:32:09 PM
BLD-Foundation6/6/20036/12/20036/12/2003PDONE
DetailsDave Hannah
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Foundation6/6/20036/11/20036/11/2003PPART
DetailsDave Hannah
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore mti on site 6/11/2003 4:50:34 PM
BLD-Footing6/6/20036/10/20036/10/2003PDONE
DetailsDave Hannah
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Foundation6/6/20036/10/20036/10/2003APART
DetailsDave Hannah
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Footing6/6/20036/9/20036/9/2003PDONE
DetailsDave Hannah
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore done by spec inspection no time to check on project 6/9/2003 10:09:13 PM
BLD-Foundation5/27/20036/3/20036/3/2003PPART
DetailsCarl Dependahl
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Foundation5/27/20036/2/20036/2/2003PPART
DetailsCarl Dependahl
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore, misc core areas, MTI onsite 6/2/2003 4:01:12 PM
BLD-Footing5/27/20036/2/20036/2/2003PPART
DetailsCarl Dependahl
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Foundation5/27/20035/30/20035/30/2003PPART
DetailsCarl Dependahl
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...wip, MtI onsite 5/30/2003 4:49:21 PM
BLD-Foundation5/27/20035/29/20035/29/2003PPART
DetailsCarl Dependahl
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...mti onsite 5/29/2003 2:02:37 PM
BLD-Footing5/27/20035/28/20035/28/2003PPART
DetailsCarl Dependahl
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore mti onsite 5/28/2003 3:10:23 PM
BLD-Foundation5/27/20035/28/20035/28/2003PPART
DetailsCarl Dependahl
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...south wall, mti onsite...pend reports 5/28/2003 3:10:01 PM
BLD-Footing5/14/20035/21/20035/21/2003PPART
DetailsCarl Dependahl
mike; Phone #: ###-#### Internet Inspection Request from: Annette Moore; wip, mti onsite 5/21/2003 4:10:58 PM
BLD-Footing5/14/20035/20/20035/20/2003PPART
DetailsCarl Dependahl
mike; Phone #: ###-#### Internet Inspection Request from: Annette Moore...mti onsite 5/20/2003 4:59:24 PM
BLD-Footing5/14/20035/19/20035/19/2003APART
DetailsCarl Dependahl
mike; Phone #: ###-#### Internet Inspection Request from: Annette Moore MT 5/19/2003 11:47:16 AM I onsite...pend insp report 5/19/2003 11:47:29 AM
BLD-Footing5/14/20035/19/20035/19/2003PPART
DetailsCarl Dependahl
mike; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Footing5/14/20035/16/20035/16/2003PPART
DetailsCarl Dependahl
mike; Phone #: ###-#### Internet Inspection Request from: Annette Moore..east walls/ftgs...MTI onsite. 5/19/2003 2:26:07 PM
BLD-Footing5/14/20035/15/20035/15/2003PPART
DetailsCarl Dependahl
mike; Phone #: ###-#### Internet Inspection Request from: Annette Moore...east portion walls, MTI onsite, pending report. 5/15/2003 1:53:07 PM
BLD-Footing5/7/20035/14/20035/14/2003PPART
DetailsCarl Dependahl
mike; Phone #: ###-#### Internet Inspection Request from: Annette Moore...east wall portion, mti onsite. 5/14/2003 2:58:06 PM
BLD-Footing5/7/20035/13/20035/13/2003PPART
DetailsCarl Dependahl
mike; Phone #: ###-#### Internet Inspection Request from: Annette Moore, mti onsite...east section 5/13/2003 1:49:09 PM
BLD-Footing5/7/20035/12/20035/12/2003PPART
DetailsCarl Dependahl
mike; Phone #: ###-#### Internet Inspection Request from: Annette Moore.. MTI onsite
5/13/2003 1:27:46 PM
BLD-Foundation5/7/20035/9/20035/9/2003PPART
DetailsCarl Dependahl
mike; Phone #: ###-#### Internet Inspection Request from: Annette Moore; mti onsite, pend report. 5/9/2003 1:39:06 PM
BLD-Footing5/7/20035/8/20035/8/2003PPART
DetailsCarl Dependahl
mike; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Foundation4/30/20035/7/20035/7/2003PPART
DetailsCarl Dependahl
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore wip, mti onsite
5/7/2003 3:09:33 PM
BLD-Footing4/30/20035/7/20035/7/2003PPART
DetailsCarl Dependahl
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore; wip 5/7/2003 3:08:43 PM
BLD-Footing4/30/20035/6/20035/6/2003PPART
DetailsCarl Dependahl
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...MTI onsite 5/6/2003 3:23:16 PM
BLD-Foundation4/30/20035/6/20035/6/2003PPART
DetailsCarl Dependahl
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore MTI onsite 5/6/2003 3:23:25 PM
BLD-Foundation4/30/20035/5/20035/5/2003PPART
DetailsCarl Dependahl
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore; pend MTI's report 5/5/2003 4:32:14 PM
BLD-Footing4/30/20035/5/20035/5/2003PPART
DetailsCarl Dependahl
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore; pend report 5/5/2003 4:31:49 PM
BLD-Foundation4/30/20035/2/20035/2/2003PPART
DetailsCarl Dependahl
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore....walls & "core", pend MTI report 5/2/2003 5:09:26 PM
BLD-Footing4/30/20035/1/20035/1/2003PPART
DetailsCarl Dependahl
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...walls at S.E. corner, pend report 5/1/2003 5:08:29 PM
BLD-Foundation4/23/20034/30/20034/30/2003PPART
DetailsCarl Dependahl
MIKE; Phone #: ###-#### Internet Inspection Request from: Darla Downs...pend MTI report 4/30/2003 2:11:25 PM
BLD-Foundation4/23/20034/29/20034/29/2003PPART
DetailsCarl Dependahl
MIKE; Phone #: ###-#### Internet Inspection Request from: Darla Downs wall(s) at S.E. portion water ctr, pend MTI report 4/29/2003 4:32:55 PM
BLD-Foundation4/23/20034/28/20034/28/2003PPART
DetailsCarl Dependahl
MIKE; Phone #: ###-#### Internet Inspection Request from: Darla Downs rec'd add'l scope of work from MTI...change from Strata 4/28/2003 5:19:26 PM
BLD-Footing4/23/20034/28/20034/28/2003PPART
DetailsCarl Dependahl
MIKE; Phone #: ###-#### Internet Inspection Request from: Darla Downs, MTI onsite 4/28/2003 5:18:43 PM
BLD-Foundation4/23/20034/25/20034/25/2003PDONE
DetailsDave Hannah
MIKE; Phone #: ###-#### Internet Inspection Request from: Darla Downs don by spec inspection 4/25/2003 3:39:28 PM
BLD-Foundation4/23/20034/24/20034/24/2003PPART
DetailsCarl Dependahl
MIKE; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Concrete4/18/20034/21/20034/21/2003APART
DetailsCarl Dependahl
Mike W....MTI onsite 4/21/2003 3:22:19 PM
BLD-Conference4/21/20034/21/20034/21/2003PPASS
DetailsCarl Dependahl
deck, wip...pend reports 4/21/2003 5:01:17 PM
BLD-Conference4/17/20034/18/20034/18/2003PPASS
DetailsCarl Dependahl
permit status...still valid for garage per Jenn. G. 4/18/2003 12:09:02 PM
BLD-Concrete4/15/20034/16/20034/16/2003PPART
DetailsCarl Dependahl
struct masonry 2nd lift ok, pend report by Strata. 4/16/2003 2:35:03 PM
BLD-Footing4/14/20034/16/20034/16/2003PPART
DetailsCarl Dependahl
###-#### mike ...East portion "ID. Water Center"...MTI onsite, not strata 4/16/2003 4:37:14 PM
BLD-Conference4/15/20034/15/20034/15/2003PPART
DetailsCarl Dependahl
WIP...pend spec insp; State to assume permit? 4/15/2003 5:29:07 PM
BLD-Footing4/14/20034/15/20034/15/2003PPART
DetailsCarl Dependahl
###-#### mike...south wall line ftgs, pend SI report 4/16/2003 2:10:51 PM
Override - Parcel Holds  4/14/2003  
Override - Parcel Holds  4/14/2003  
BLD-Foundation4/10/20034/11/20034/11/2003APART
DetailsCarl Dependahl
###-####...deck 4/11/2003 4:03:11 PM...pending strata's report. 4/11/2003 4:05:08 PM
Override - Parcel Holds  4/10/2003  
Routing - PLAN CHECK3/10/2003 3/10/2003 PASS
Plan modification.
PLANS/APPL TAKEN TO FRONT DESK  3/10/2003 PASS
Plan Modification to split this project into two phases of occupancy. JCM
Telephone call  3/10/2003 DONE
CALLED LEFT MESSAGE FOR MIKE
Routing - PUBLIC WORKS3/5/2003 3/10/2003 PASS
Plan Modification.
Plan assigned to (JCM)2/11/2003 3/10/2003 PASS
DetailsJohn Menard
3/10/2003 13:50:57 JCM - activity updated through activity BLDA022 from case BLD02-00199.
BLD-Concrete3/4/20033/5/20033/5/2003APART
DetailsCarl Dependahl
wip, pend insp reports...deck. 3/5/2003 5:40:22 PM
BLD-Concrete3/5/20033/5/20033/5/2003PNR
DetailsCarl Dependahl
need conf re apts 3/5/2003 6:03:20 PM
Routing - PLAN CHECK3/5/2003 3/5/2003  
Plan mod
BLD-Conference3/4/20033/4/20033/4/2003ACANC
DetailsDave Hannah
BLD-Conference3/4/20033/4/20033/4/2003PPASS
DetailsCarl Dependahl
apt plans issued? 3/4/2003 5:25:46 PM
BLD-Concrete2/28/20033/3/20033/3/2003APART
DetailsCarl Dependahl
Brian; deck, pend report by Strata 3/4/2003 1:59:30 PM
BLD-Concrete2/27/20032/28/20032/28/2003APART
DetailsCarl Dependahl
Brian..wip. 2/28/2003 4:55:56 PM
Plan Reviewer's activity  2/28/2003 DONE
2/28/03-made on site visit to evaluate FD access issues. Temporary FD vehicle access roadway has not been provided along the north side, as required per plan approval comments 1, 11 and 12. This is a code violation which needs to be rectified immediately. Discussed this with Brian, McAlvain Construction supt, during on my on-site visit; he will discuss with Brian Murphy. Also, phoned Mike Simmonds, architect, and advised him of my on-site visit this morning. Mike will get the responsible parties together to work out plans to get a temporary roadway installed and contact me on Monday to discuss their plans.
Routing - FIRE2/26/2003 2/28/2003 PASS
2/28/03 - Received resubmittal of sheet A1.00 from Mike Simmonds, showing FD access roadway on east side of property.
2/28/03-made on site visit to evaluate FD access issues. Temporary FD vehicle access roadway has not been provided along the north side, as required per plan approval comments 1, 11 and 12. This is a code violation which needs to be rectified immediately. Discussed this with Brian, McAlvain Construction supt, during on my on-site visit; he will discuss with Brian Murphy. Also, phoned Mike Simmonds, architect, and advised him of my on-site visit this morning. Mike will get the responsible parties together to work out plans to get a temporary roadway installed and contact me on Monday to discuss their plans.
BLD-Footing2/25/20032/26/20032/26/2003APART
DetailsCarl Dependahl
brian ###-####...wip, pend reports. 2/28/2003 10:30:29 AM
Plan Reviewer's activity  2/26/2003 PASS
This approval is for the modification of this permit to phase the garage in two phases as detailed in the body of the building permit. The modification is approved per the submitted modification plans, the attached modification description letter, written by Michael G. Simmonds, ZGA Architects, dated 2/10/03; the attached electrical modification letter, written by John J. Parry, P.E., Sparling Electrical Engineering, dated 1/27/03; and the attached fire protection, HVAC systems and plumbing systems modification letter, written by Matt Younger, P.E., Keen Engineering, dated 1/28/03.
Routing - PLAN CHECK2/25/2003 2/26/2003 PASS
Plan modification.
Override - Parcel Holds  2/25/2003  
Routing - PLANNING2/20/2003 2/25/2003 PASS
Approved per letter dated 2/25/03 from Planning Division to Michael Simmonds regarding conditions of approval. Attached to this file in "Documents".
BLD-Concrete2/21/20032/24/20032/24/2003APART
DetailsCarl Dependahl
walked deck, WIP, ok pend Spec insp reports 2/28/2003 10:30:00 AM
BLD-Concrete2/20/20032/21/20032/21/2003APART
DetailsCarl Dependahl
Brian...WIP, strata onsite. 2/24/2003 1:25:21 PM
BLD-Foundation2/19/20032/20/20032/20/2003PPART
DetailsCarl Dependahl
brian ###-####, wip, Strata onsite. 2/20/2003 5:41:00 PM
Routing - PLUMBING2/19/2003 2/20/2003 PASS
Plan modification of 2/10/03 use boise city approved flammable liquids interceptor detail attached, move FD-1 trap, at grid lines wj-1 , inside building if it is less than 24" below grade, label all IW water piping and outlets per upc, vents from flammable liquids interceptor must terminate 10' above grade or offset to building and VTR.
Routing - PUBLIC WORKS2/14/2003 2/19/2003 FAIL
Plan modification of 2/10/03 Route to Plumb. when plans are out of PW per Marlene. kmm
2/19/03 Requires Drainage Plan Revision on Parks Aggrement per Brian M. kmm
Override - Parcel Holds  2/19/2003  
Plan Modification Accepted  2/14/2003 DONE
Mike S. came and put signed sheets with plans..
Routing - PLANNING Land Div2/14/2003 2/14/2003 PASS
Plan modification of 2/10/03. Approved, parcel is larger than 5 acres.
Plan routing begun/NEW & ADDTN  2/14/2003 DONE
Plan modification of 2/11/03
BLD-Foundation2/11/20032/12/20032/12/2003APART
DetailsCarl Dependahl
BRIAN ###-####
BLD-Concrete2/12/20032/12/20032/12/2003PCANC
DetailsCarl Dependahl
Jim i'm not sure if this has anything to do with the plan mod!!!! Brian ###-####
BLD-Foundation2/12/20032/12/20032/12/2003PPART
DetailsCarl Dependahl
north portion deck; bar being placed....wip pend spec insp reprts 2/12/2003 4:55:14 PM
Override - Parcel Holds  2/12/2003  
Override - Parcel Holds  2/11/2003  
Override - Parcel Holds  2/11/2003  
Plan Modification Accepted  2/10/2003 FAIL
Structural sheets not signed. Contacted Mike Simmonds. Will hold plans until signed sheets arrive. kmm (2/12/03-Called Mike Simmonds to check on when the signed and stamped structural sheets were to arrive. He stated to the best of his knowledge he would have them by 2/13/03 and bring them in.--Marlene)
BLD-Conference1/27/20031/27/20031/27/2003PPASS
DetailsCarl Dependahl
work on east portion excavation not complete, decision expected soon. 1/27/2003 2:47:14 PM
BLD-Concrete1/27/20031/27/20031/27/2003PPART
DetailsCarl Dependahl
cols, WIP, pend special insp report.
BLD-Conference1/23/20031/23/20031/23/2003APASS
DetailsCarl Dependahl
see BLD02-00163 history, too. 1/23/2003 10:50:04 AM
BLD-Conference1/6/20031/7/20031/7/2003APASS
DetailsCarl Dependahl
###-#### ... WIP, resubmittals req'd if project is halved. 1/7/2003 11:47:36 AM
BLD-Conference1/6/20031/6/20031/6/2003PPASS
DetailsCarl Dependahl
W/ Brian Murphy, Mc Alvaine...excavation at east portion is delayed, should commence by 1-28-03; checked work vs. plans...walls ok up to north-south "bulkheads". (may give impression that only 1/2 of work being done?)
BLD-Foundation1/6/20031/6/20031/6/2003PPART
DetailsCarl Dependahl
brian; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie, WIP, pend special insp reports 1/6/2003 5:02:08 PM
BLD-Foundation12/13/200212/13/200212/13/2002PPART
DetailsJim Storey
Phone #: ###-#### Internet Inspection Request from: Rita DeYoungplaced with special insp. pending report. 12/13/2002 3:25:31 PM
BLD-Conference12/13/200212/13/200212/13/2002PDONE
DetailsDave Hannah
on site to walk project and check spec inspection reports
BLD-Footing12/11/200212/11/200212/11/2002PPART
DetailsCarl Dependahl
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung..WIP, need clarify de-watering systen spec.insps...who? 12/11/2002 4:00:29 PM
BLD-Footing12/3/200212/3/200212/3/2002PPART
DetailsCarl Dependahl
###-####...wip, strata onsite...North wall ftgs. 12/3/2002 1:57:51 PM
BLD-Foundation12/2/200212/2/200212/2/2002PPART
DetailsCarl Dependahl
found wall- brian ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie...strata onsite....walls at north side 12/2/2002 3:58:14 PM
BLD-Footing11/26/200211/27/200211/27/2002APART
DetailsDave Hannah
done by spec inspection mti 11/27/2002 12:42:36 PM
BLD-Foundation11/26/200211/26/200211/26/2002ACANC
DetailsJim Storey
###-#### ###-#### out of time 11/26/2002 4:51:01 PM
BLD-Footing11/22/200211/22/200211/22/2002PPART
DetailsCarl Dependahl
BRIAN; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie...North ramp wall ftgs, WIP, Strata (Max) ; May further info re dewatering system special insp program 11/22/02 3:06:26 PM
(F) Reprint permit  11/21/2002  
BLD-Footing11/20/200211/20/200211/20/2002PPART
DetailsDave Hannah
###-#### strata on site to do spec insp 11/20/2002 4:30:42 PM
Issue PAID IN FULL permit  11/20/2002 DONE
Inspection Record Card- Bld  11/20/2002  
Plan assigned to (JCM)2/5/2002 11/19/2002 PASS
DetailsJohn Menard
11/19/2002 09:13:05 MYS - activity updated through activity BLDA022 from case BLD02-00199.
Routing - PUBLIC WORKS11/18/2002 11/19/2002 PASS
Routing - PLAN CHECK11/19/2002 11/19/2002 PASS
Routed to Marlene S. kmm
PLANS/APPL TAKEN TO FRONT DESK  11/19/2002  
Inspection Record Card- Bld  11/19/2002 DONE
Telephone call  11/19/2002 DONE
permit ready
Routing - PLAN CHECK5/17/2002 11/18/2002 DONE
Route back to PW.
Routing - PUBLIC WORKS5/15/2002 5/17/2002 FAIL
NEEDS PW DEWATER AGREEMENT AND DRAINAGE PLAN
Routing - FIRE5/13/2002 5/15/2002 PASS
Plan Reviewer's activity  5/13/2002 PASS
Reviewed and approved resubmitted plans and information with attached plan review comment list. JCM
Routing - PLAN CHECK4/12/2002 5/13/2002 PASS
Plan resubmittals received  4/22/2002 DONE
1. Received three sets of resubmittal sheets A2.00, A2.11, with cover letter and responses addressed to Sam Rogers. Routed to John Menard.
2. Received three sets of resubmittal sheets A0.02, A1.00, A2.00, A2.11, A7.01, A7.02, A7.03, A7.04, A9.30, with cover letter and responses addressed to John Menard.
Plan resubmittals received  4/22/2002 DONE
Received one copy of resubmittal sheet C-5.00 with transmittal addressed to Louise Waldorf. Routed to John Menard. Called Pat Walsh requesting one more copy.
Routing - PUBLIC WORKS4/12/2002 4/12/2002 FAIL
Routing - PLUMBING3/27/2002 4/12/2002 PASS
see attached
Routing Off Site - STRUCTURAL3/28/2002 4/9/2002 PASS
contactced pdq to take plans to outside eng. kmm Received an e-mail from the consulting structural engineer approving the resubmittals. JCM
Plan resubmittals received  3/28/2002 DONE
Received three copies of revised shees S1.02, S2.13W, S2.14W, S2.13E, S2.13WR, S2.14WR and S2.13ER. One copy of response letter from SWMB structural engineers, stamped & signed cover for structural calculations, Vol. 1-4 and three copies of supplemental calculations. Routed to John M. kmm
Routing - PLAN CHECK3/11/2002 3/27/2002  
Plan resubmittals received  3/26/2002 DONE
Received three copies of revised sheets C-5.00 M1.2 and M1.3. One copy of memo from Keen Engineering. Routed to John M. kmm
Plan resubmittals received  3/13/2002 DONE
Received 3 sets of resubmittal sheets A2.00, A2.11, A2.12, A9.01, A9.30, M4.1, with transmittal. Routed to John Menard.
Routing - PLAN CHECK3/8/2002 3/11/2002  
Routing - PUBLIC WORKS3/11/2002 3/11/2002 FAIL
Routing - FIRE3/4/2002 3/8/2002 FAIL
Review comments faxed to architect.
Routing - PLAN CHECK2/28/2002 3/4/2002 FAIL
Plan resubmittals requested  3/4/2002 FAIL
Mailed the architect of record a copy of the plan review comment list requesting revisions. JCM
Routing - PLANNING2/22/2002 2/27/2002 PASS
Approve by DR per DRH01-161 & CU per CUP01-167
Routing Off Site - STRUCTURAL2/4/2002 2/22/2002 FAIL
Called PDQ to take plans to outside engineering. Received comment list from the consulting structural engineer requesting revisions. JCM
Plan resubmittals requested  2/22/2002  
Faxed the architect of record a copy of the comment list from the consulting structural engineer requesting revisions. JCM
Routing - PLUMBING2/13/2002 2/21/2002 FAIL
DetailsLee Rice
Failed for incomplete plans on floor drains and questions on depth of de-watering system. Had meetings with civil engineers (Matt and Jason) from Hubble on Friday 2/22/02 about dewatering system and garage floor drainage system. They indicated that both were being redesigned and would be resubmitted. I called Pat Walsh with ZGA this morning 2/25/02 and found out that part of this( a new dewatering plan) has already been resubmitted. It appears they were not done or conclusive with their design when they submitted. Hopefully we will get the correct plans for both systems from them to look at the next time they come back to us.
Routing - PUBLIC WORKS2/4/2002 2/13/2002 FAIL
needs to re-evaluate fees.
Plan resubmittals received  2/13/2002 DONE
Recieved three copies of revised cifil sheets C-4.00 and C-4.20. One copy of specification sections 02207, 02223, 02225, 02712 and 0715. Routed to John M. kmm
Routing - PLANNING Land Div2/4/2002 2/4/2002 PASS
Land division ok - parcel is >5 acres. Routed to Public Works. (blc)
Application received  2/1/2002  
Recd Pcfee & Taken To Pln CK  2/1/2002 DONE
Fee Review-notes12/15/200412/15/2004   
Fee Review-notes2/1/20022/1/2002   
Routing - PLAN CHECK12/6/2004