Case Summary (BLD) | | | 7/22/2011 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 7/22/2011 | | DONE |
|
|
|
|
Second Notice BLD | 5/25/2006 | 5/25/2006 | 5/26/2006 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | 4/17/2006 | 4/17/2006 | 5/25/2006 | | DONE |
Jim Sly
|
|
|
|
BLD-Aging Inspection | 4/17/2006 | 4/17/2006 | 4/17/2006 | | PASS |
Jim Sly
|
|
|
I verified fire extiguisher and door hardware per previous fire corr..... OK for Perm Occ.
|
DOC - Permit Finaled | 4/17/2006 | 4/17/2006 | 4/17/2006 | P | PASS |
Jim Sly
|
|
|
|
FIRE-Final Inspection | 6/26/2003 | 6/26/2003 | 6/26/2003 | A | FAIL |
Troy Cobbley
|
|
|
Provide fire extinguisher mounted at 48" above the finish floor and provide approved doorhardware on the storage room door
|
BLD-Final | 6/20/2003 | 6/23/2003 | 6/23/2003 | A | PASS |
Jim Sly
|
|
|
ROGER; Phone #: ###-#### Internet Inspection Request from: Darla Downs Phone #: ###-#### Internet Inspection Request from: Darla Downs 6/23/2003 12:11:37 PM OK for Perm Occ. 6/23/2003 12:11:54 PM
|
FIRE-Final Inspection | 4/2/2003 | 4/3/2003 | 4/3/2003 | A | NR |
Rick Jackson
|
|
|
###-#### called and talked to Jim and they will need alarm plans 4/3/2003 4:54:23 PM
|
BLD-Final | 4/2/2003 | 4/3/2003 | 4/3/2003 | P | PART |
Jim Sly
|
|
|
###-#### Verified 1hr Occ. separation wall to roof deck....OK. 4/3/2003 2:51:11 PM
|
FIRE-Final Inspection | 4/1/2003 | 4/2/2003 | 4/2/2003 | A | FAIL |
Troy Cobbley
|
|
|
jim; Phone #: ###-#### No approved plans on site 4/2/2003 3:01:26 PM
|
BLD-Framing/Rough-in | 2/21/2003 | 2/24/2003 | 2/24/2003 | A | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 2/21/2003 at 2:53:04 PM. Contact: ###-####. by a contractor via Hello! on 2/21/2003 at 2:53:04 PM. Contact: ###-####. 2/24/2003 12:30:56 PM ADA bath for frame OK....C/N Arch. to provide detail to complete 1hr rated Occ sepatation to roof deck.....provide UL assemb......verify rated plastic in attic. 2/24/2003 12:37:18 PM
|
Print Occupancy Form | | | 2/24/2003 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/12/2003 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/12/2003 | | DONE |
|
|
|
|
Telephone call | | | 2/12/2003 | | DONE |
|
|
|
CALLED 2-12-03
|
Issue PAID IN FULL permit | | | 2/12/2003 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/11/2003 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 2/11/2003 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 2/11/2003 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 2/6/2002 | | 2/11/2003 | | PASS |
Mike Phillips
|
|
|
2/11/2003 16:44:04 M_P - activity updated through activity BLDA022 from case BLD02-00242.
|
Routing - PLAN CHECK | 2/27/2002 | | 2/11/2003 | | PASS |
|
|
|
11/21/02 * Second review failed. Called Jim Schadduck about problems with submittal. Need another restroom for the office area and the restroom must meet accessible requirements. Need a letter from thim to change permit from 15 bed facility to 10 bed facility and remodel garage to office pace.
|
Plan resubmittals received | | | 1/28/2003 | | DONE |
|
|
|
Received two sets of resubmittal sheets 3.30 and sheet "2 of 3" with email comments, details, (2) Addendum 1. Routed to Mike Phillips.
|
Plan resubmittals received | | | 1/2/2003 | | DONE |
|
|
|
Addendum 01, floor plan Sheet 3.30 and Detail Section 1 resubmittals received and passed on to Mike Phillips.
|
Plan resubmittals received | | | 11/12/2002 | | DONE |
|
|
|
Received two sets of resubmittal sheets 2.20, 3.10, 3.30. Routed to Mike Phillips.
|
Plan resubmittals received | | | 8/13/2002 | | DONE |
|
|
|
Received two sets of resubmittal sheets2.20, 3.30, with revised application with new certificate of values. routed to Mike Phillips.
|
Routing - PLANNING Land Div | 2/21/2002 | | 2/26/2002 | | N/A |
|
|
|
Land division not ok, but we do not need to sign off as they are not expanding building. If they do add square footage later, they will need to go through subdivision process and include this parcel and the parcel to the north. (blc)
|
Routing - PLAN CHECK | 2/20/2002 | | 2/21/2002 | | |
|
|
|
Routing to Land Division
|
Routing - PLANNING | 2/19/2002 | | 2/20/2002 | | PASS |
|
|
|
|
Plan Review Completed(1st rev) | | | 2/18/2002 | | FAIL |
|
|
|
|
Routing - FIRE | 2/14/2002 | | 2/18/2002 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 2/8/2002 | | 2/14/2002 | | FAIL |
|
|
|
Plan review completed sent correction report requesting additional information for a follow up review.
|
Routing - PLANNING | 2/7/2002 | | 2/8/2002 | | FAIL |
|
|
|
Needs conditional use permit. Called and left message for applicant. ajb
|
Routing - PUBLIC WORKS | 2/6/2002 | | 2/7/2002 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 2/6/2002 | | 2/6/2002 | | FAIL |
|
|
|
Need chain of deeds back to prior to 10/30/65 since this is not an original platted lot. Routed to Public Works. (blc)
|
Application received | | | 2/6/2002 | | |
|
|
|
|