BLD-Conference | 12/17/2002 | 12/18/2002 | 12/18/2002 | A | PASS |
Tom Arcoraci
|
|
|
SCOTT ###-####
|
BLD-Final | 12/18/2002 | 12/18/2002 | 12/18/2002 | A | PASS |
Tom Arcoraci
|
|
|
ok for perm occ
|
Permanent Occupancy | | 12/18/2002 | 12/18/2002 | | DONE |
|
|
|
|
Permanent occupancy UNPAID FEE | | | 12/18/2002 | | DONE |
|
|
|
Perm. Occ. Cert. #9480 issued 12-18-02 to Dennis Dillon.
|
BLD-Final | 11/12/2002 | 11/13/2002 | 11/13/2002 | A | FAIL |
Russ Owen
|
|
|
left over from yesterday. 11/12/2002 5:40:00 PMc/n posted. ok temp oc only. 11/13/2002 10:35:38 AM
|
FIRE-Final Inspection | 11/11/2002 | 11/12/2002 | 11/12/2002 | A | PASS |
Troy Cobbley
|
|
|
fire life/safety finaled 11/12/2002 9:58:49 AM
|
BLD-Final | 11/11/2002 | 11/12/2002 | 11/12/2002 | P | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 11/11/2002 at 10:57:55. Contact: (208) 41-2407.unable to do to many others set up for am.. 11/12/2002 5:38:44 PM
|
DOC - Permit Finaled | 11/12/2002 | 11/12/2002 | 11/12/2002 | P | PASS |
Russ Owen
|
|
|
Finaled by inspector at 11/12/2002 4:54:11 PM
|
Case Summary (BLD) | | | 11/7/2002 | | DONE |
|
|
|
|
FIRE-Final Inspection | 8/29/2002 | 8/29/2002 | 8/29/2002 | P | FAIL |
Troy Cobbley
|
|
|
provide approved hardware on restroom door and dutch door 8/29/2002 1:43:37 PM
|
FIRE-Final Inspection | 8/26/2002 | 8/27/2002 | 8/27/2002 | A | FAIL |
Troy Cobbley
|
|
|
provide building address, provide fire extinguisher, provide approved door hardware and remove thumbturns 8/27/2002 1:06:01 PM
|
BLD-Final | 8/26/2002 | 8/27/2002 | 8/27/2002 | A | NR |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 08/26/2002 at 11:58:51. Contact: ###-####.
|
(F) Reprint permit | | | 7/16/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/16/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/16/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/16/2002 | | DONE |
|
|
|
|
BLD-Final | 5/10/2002 | 5/10/2002 | 5/10/2002 | P | NR |
Tom Arcoraci
|
|
|
fn -marv-###-#### needs all sigs on card 5/10/2002 4:14:15 PM
|
BLD-Framing/Rough-in | 3/28/2002 | 3/28/2002 | 3/28/2002 | P | PASS |
Tom Arcoraci
|
|
|
###-#### MARV
|
BLD-Framing/Rough-in | 3/25/2002 | 3/25/2002 | 3/25/2002 | P | FAIL |
Russ Owen
|
|
|
###-#### ERNIE c/n posted. 3/25/2002 3:37:03 PM
|
Issue PAID IN FULL permit | | | 3/12/2002 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 2/12/2002 | | 3/11/2002 | | PASS |
Carl Westfall
|
|
|
3/11/2002 15:31:14 CJW - activity updated through activity BLDA022 from case BLD02-00257.
|
Routing - PLAN CHECK | 3/7/2002 | | 3/11/2002 | | PASS |
|
|
|
Drawings approved after resubmittal review.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/11/2002 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 3/11/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/11/2002 | | DONE |
|
|
|
|
Routing - FIRE | 3/8/2002 | 3/8/2002 | 3/8/2002 | | PASS |
Bill Alexander
|
|
|
Dave Miller approved not hydrant required for this property/structure (reference FIR99-00552 and email document attached.
|
Plan resubmittals received | | | 3/8/2002 | | DONE |
|
|
|
Received two sets of resubmittal sheet A3 and (1) copy of structural calculations. Routed to Carl Westfall.
|
Routing - FIRE | 3/1/2002 | 3/7/2002 | 3/7/2002 | | |
Bill Alexander
|
|
|
Lack hydrant location/fire flows, (requires fire protections system verification).
|
Plan Review Completed(1st rev) | | | 3/7/2002 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 2/25/2002 | | 3/1/2002 | | |
|
|
|
Failed first UBC review. UBC plan review started February 28, 2002 and finished the next day. Response from the architect was required. See the conditions list. A copy of the plan review report was sent to the architect.
|
Routing - PLANNING | 2/13/2002 | | 2/25/2002 | | PASS |
|
|
|
Approved.
|
Routing - PUBLIC WORKS | 2/12/2002 | | 2/13/2002 | | PASS |
|
|
|
|
Additional plans submitted | | | 2/11/2002 | | DONE |
|
|
|
Received "Involved Parties" sheet by fax. Attached to the permit application.
|
First Notice | 2/8/2002 | 2/8/2002 | 2/8/2002 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/8/2002 | | DONE |
|
|
|
1. Missing "Involved Parties" sheet. Faxed to applicant.
2. No mechanical/plumbing plans submitted. Applicant was informed that these plans might be required.
3. Plans not fully dimensioned.
|
Application received | | | 2/8/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/8/2002 | | |
|
|
|
|