Fee Review-notes | 7/15/2003 | 7/15/2003 | 7/15/2003 | | DONE |
|
|
|
Additional value from subcontractors.
|
Permanent Occupancy | | 8/23/2002 | 8/23/2002 | | DONE |
|
|
|
|
BLD-Final | 8/22/2002 | 8/23/2002 | 8/23/2002 | A | CANC |
Tom Arcoraci
|
|
|
###-#### TIM
|
FIRE-Final Inspection | 8/23/2002 | 8/23/2002 | 8/23/2002 | A | PASS |
Rick Jackson
|
|
|
|
BLD-Final | 8/23/2002 | 8/23/2002 | 8/23/2002 | P | PASS |
Tom Arcoraci
|
|
|
###-#### tim 8/23/2002 10:49:07 AM
|
Permanent occupancy | | | 8/23/2002 | | DONE |
|
|
|
Perm. Occ. Cert. #9312 issued 8-23-02 to KPMG on the 6th floor of the Empire Bldg.
|
BLD-Framing/Rough-in | 8/16/2002 | 8/16/2002 | 8/16/2002 | P | CANC |
Jim Storey
|
|
|
###-#### carl did insp. 8/16/2002 3:48:43 PM
|
BLD-Framing/Rough-in | 8/16/2002 | 8/16/2002 | 8/16/2002 | P | FAIL |
Carl Dependahl
|
|
|
###-####, c/n, verify damper operation, pach lid, add wires & pods at grid....ok to tile except where noted. 8/16/2002 3:31:39 PM
|
BLD-Framing/Rough-in | 7/18/2002 | 7/18/2002 | 7/18/2002 | P | PART |
Carl Dependahl
|
|
|
TIM; Phone #: ###-#### FIREPROOFING REPAIRED, OK. SEAL PENETRATIONS AT STAIR WALLS 7/18/2002 5:40:06 PM
|
BLD-Framing/Rough-in | 7/12/2002 | 7/15/2002 | 7/15/2002 | A | PART |
Carl Dependahl
|
|
|
TIM- ###-####- WALL COVER; c/n...fireproofing, patch lid membrane... walls ok except as noted7/15/2002 4:53:10 PM 7/15/2002 4:55:45 PM
|
Routing - PLAN CHECK | 6/21/2002 | | 6/25/2002 | | PASS |
|
|
|
PLAN MODIFICATION
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/25/2002 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 6/25/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/25/2002 | | DONE |
|
|
|
|
Telephone call | | | 6/25/2002 | | DONE |
|
|
|
PERMIT READY AND FEES DUE
|
Plan assigned to (CJW) | 6/18/2002 | | 6/25/2002 | | PASS |
Carl Westfall
|
|
|
6/25/2002 10:12:10 CJW - activity updated through activity BLDA022 from case BLD02-00259.
|
Routing - PUBLIC WORKS | 6/20/2002 | | 6/21/2002 | | PASS |
|
|
|
PLAN MODIFICATION
|
Routing - FIRE | 6/21/2002 | | 6/21/2002 | | PASS |
|
|
|
PLAN MODIFICATION approved without additional comments
|
Routing - PLAN CHECK | 6/18/2002 | | 6/20/2002 | | PASS |
|
|
|
Review of plan modification from "Anderson" to "KPMG" started June 18, 2002 and was finished June 20, 2002. The drawings were approved with conditions. See the conditions list.
|
Plan routing begun/TENANTS | | | 6/18/2002 | | DONE |
|
|
|
PLAN MODIFCATION
|
Plans ACCEPTED BY PLAN TECH | | | 6/18/2002 | | DONE |
|
|
|
PLAN MODIFICATION
|
First Notice | 6/17/2002 | 6/17/2002 | 6/17/2002 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/17/2002 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 4/8/2002 | | |
|
|
|
|
CHANGE ISSUED DATE | | | 4/8/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/26/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/26/2002 | | DONE |
|
|
|
|
Telephone call | | | 3/26/2002 | | DONE |
|
|
|
CALLED BRIAN PLANS READY
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/25/2002 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 3/5/2002 | | 3/25/2002 | | PASS |
|
|
|
(3-13-02) Completed resubmittal review. Failed 2nd UBC plan review. Sent a copy of the failed items to the architect. See the conditions list. (3-25-02) Letter dated March 21, 2002 from John Maulin, architect, stated that the reception counter had been deleted from this project. All details on the drawings relating to the reception counter were crossed out.
|
Plan assigned to (CJW) | 2/12/2002 | | 3/25/2002 | | PASS |
Carl Westfall
|
|
|
3/25/2002 14:54:54 CJW - activity updated through activity BLDA022 from case BLD02-00259.
|
Plan resubmittals received | | | 3/22/2002 | | DONE |
|
|
|
Received a letter from John Maulin, architect, stating that the reception counter had been deleted from this project.
|
Plan resubmittals received | | | 3/12/2002 | | DONE |
|
|
|
Received two copies of revised sheets A2.1, A2.2, A10.1, A10.3, E0.1, E1.1. One response to building department commetns and one response to fire department comments. Routed to Carl W. kmm
|
Plan Review Completed(1st rev) | | | 3/4/2002 | | FAIL |
|
|
|
|
Routing - FIRE | 2/27/2002 | | 3/4/2002 | | PASS |
|
|
|
|
Plan resubmittals received | | | 3/1/2002 | | DONE |
|
|
|
Received one copy of addendum two and sheet A10.3 systems furniture coordination plan. Routed to Carl W. kmm
|
Routing - PLAN CHECK | 2/13/2002 | | 2/27/2002 | | |
|
|
|
Failed first UBC review. UBC plan review started February 26, 2002 and finished the next day. A response from the architect was required. See the conditions list. A copy of the plan review report was sent to the architect.
|
Plan resubmittals received | | | 2/19/2002 | | DONE |
|
|
|
Received one copy of Addendum one. routed to Carl W. No plans submitted. KMM
|
Plan resubmittals received | | | 2/19/2002 | | DONE |
|
|
|
Received two sets of resubmittal sheets E0.1 with transmittal. Routed to Carl Westfall.
|
Routing - PUBLIC WORKS | 2/12/2002 | | 2/13/2002 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/11/2002 | | PASS |
|
|
|
|
Application received | | | 2/8/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/8/2002 | | DONE |
|
|
|
|