(F) Reprint permit | | | 2/25/2008 | | |
|
|
|
|
Second Notice BLD | 4/26/2005 | 4/26/2005 | 4/26/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 2/3/2005 | 4/26/2005 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 4/20/2005 | | DONE |
|
|
|
|
Permanent occupancy | | | 2/3/2005 | | DONE |
|
|
|
Perm. Occ. Cert. # 10439 issued 2-3-05 to The Big Easy.
|
Permanent Occupancy | | 2/2/2005 | 2/2/2005 | | DONE |
|
|
|
|
BLD-Conference | 2/2/2005 | 2/2/2005 | 2/2/2005 | A | CANC |
Dave Hannah
|
|
|
|
BLD-Final | 2/2/2005 | 2/2/2005 | 2/2/2005 | P | PASS |
Dave Hannah
|
|
|
inspection for occ ok for perm occ dave had carles c/n we went tough all the items and I walked the project allc/n items comlpted 2/2/2005 1:39:50 PM
|
FIRE-Final Inspection | 2/2/2005 | 2/2/2005 | 2/2/2005 | A | PASS |
Rick Jackson
|
|
|
|
BLD-Final | 2/2/2005 | 2/2/2005 | 2/2/2005 | P | DONE |
Dave Hannah
|
|
|
inspection for occ
|
FIRE-Final Inspection | 2/2/2005 | 2/2/2005 | 2/2/2005 | A | PASS |
Rick Jackson
|
|
|
Final okay 2/2/2005 10:49:18 AM
|
CHANGE STATUS TO (ISS) | | | 2/2/2005 | | DONE |
|
|
|
Per George Slane///2/2/05 BAS
|
DOC - Permit Expired | 2/23/2004 | 2/23/2004 | 2/23/2004 | P | PASS |
Dave Hannah
|
|
|
Expired by inspector at 2/23/2004 11:58:10 AM
|
BLD-Aging Inspection | 2/20/2004 | 2/20/2004 | 2/20/2004 | | DONE |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 8/6/2003 | 8/6/2003 | 8/6/2003 | | PASS |
Carl Dependahl
|
|
|
WIP... 8/6/2003 11:28:09 AM WIP... statde work complete?? need engs ok for mezz welds8/6/2003 11:28:09 AM 8/6/2003 11:30:19 AM
|
BLD-Final | 5/15/2003 | 5/16/2003 | 5/16/2003 | A | NR |
Carl Dependahl
|
|
|
david; Phone #: ###-#### Internet Inspection Request from: Darla Downs...keep c/n. 5/16/2003 10:40:41 AM
|
FIRE-Final Inspection | 5/15/2003 | 5/16/2003 | 5/16/2003 | A | PART |
Rick Jackson
|
|
|
david; Phone #: ###-#### Internet Inspection Request from: Darla Downs balance report for new hood needed 5/16/2003 4:20:29 PM
|
BLD-Framing/Rough-in | 5/13/2003 | 5/14/2003 | 5/14/2003 | A | PART |
Carl Dependahl
|
|
|
dave, shaft ok...need other insps for final. 5/14/2003 11:21:59 AM
|
BLD-Final | 5/14/2003 | 5/14/2003 | 5/14/2003 | P | PART |
Carl Dependahl
|
|
|
Dave...###-#### c/n, occ load signs, door listings, misc finish, obtain other finals; ok for t/o except kitchen. 5/14/2003 6:31:24 PM obtain complete mech finals 5/14/2003 6:32:58 PM
|
BLD-Final | 5/12/2003 | 5/13/2003 | 5/13/2003 | P | NR |
Carl Dependahl
|
|
|
DAVID; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Framing/Rough-in | 5/12/2003 | 5/13/2003 | 5/13/2003 | P | PART |
Carl Dependahl
|
|
|
dave ; Phone #: ###-#### Internet Inspection Request from: Annette Moore...wip, shaft. 5/14/2003 9:58:35 AM
|
BLD-Framing/Rough-in | 5/12/2003 | 5/12/2003 | 5/12/2003 | P | PART |
Carl Dependahl
|
|
|
shaft over hood ok...duct by 350 5/12/2003 4:05:12 PM
|
BLD-Final | 5/9/2003 | 5/12/2003 | 5/12/2003 | A | CANC |
Carl Dependahl
|
|
|
david; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Framing/Rough-in | 4/15/2003 | 4/16/2003 | 4/16/2003 | A | PART |
Carl Dependahl
|
|
|
###-#### walls ok, door moved for 18" clr (ADA). 4/16/2003 12:20:02 PM
|
BLD-Conference | 4/16/2003 | 4/16/2003 | 4/16/2003 | P | PART |
Carl Dependahl
|
|
|
Shaft...wip, ok to "3 side" shaft for duct insp by Mechanical insp 4/16/2003 2:03:35 PM
|
BLD-Conference | 4/11/2003 | 4/14/2003 | 4/14/2003 | A | PASS |
Carl Dependahl
|
|
|
dave @ devcon...shaft & framing; ###-####; add 18" clr at pull side door at lower level, verify 18" clr to combustibles for hood add drywall as needed...ok to continue, obtain all trade & fire insps prior to frame insp. 4/14/2003 11:40:17 AM
|
BLD-Aging Inspection | 3/18/2003 | 3/18/2003 | 3/18/2003 | | PASS |
Carl Dependahl
|
|
|
met workmen onsite advised to call for insps as req'd 3/18/2003 9:19:56 AM
|
Issue PAID IN FULL permit | | | 12/17/2002 | | DONE |
|
|
|
|
Telephone call | | | 12/13/2002 | | DONE |
|
|
|
TALKED TO SYLVESTER RAMIREZ ON 12/13/02/STATED THAT HE MAY TAKE OVER THE JOB FROM MARK BOWEN. TOLD HIM IT WILL EXPIRE ON DEC 31ST 2002/MLS
|
Telephone call | | | 9/18/2002 | | DONE |
|
|
|
received letter for tim hogland regarding an extension for the permit until december 31, 2002/mls received letter sept 12, 2002/mls
|
Telephone call | | | 7/25/2002 | | DONE |
|
|
|
left mess for mark that permit is ready//called on 08/07/02 said they will be in 1st of following week//aim
|
Telephone call | | | 4/23/2002 | | DONE |
|
|
|
CALLEC MARK PLANS READY 4-23-02 ///DLD
|
Inspection Record Card- Bld | | | 4/23/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/23/2002 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 2/12/2002 | | 4/22/2002 | | PASS |
Carl Westfall
|
|
|
4/22/2002 16:06:29 CJW - activity updated through activity BLDA022 from case BLD02-00266.
|
Routing - PLAN CHECK | 3/12/2002 | | 4/22/2002 | | PASS |
|
|
|
Approved with conditions after resubmittal review.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/22/2002 | | PASS |
|
|
|
|
Plan resubmittals received | | | 4/19/2002 | | DONE |
|
|
|
Received two copies of A3.1, supplemental structural calculationas & sketches and one copy of response letter. Routed to Carl W. kmm
|
Telephone call | | | 4/15/2002 | | DONE |
|
|
|
Called the architect's representative (Tarrie Wagner). Told her I needed the following information: (1) new elevations showing actual location of new wall openings relative to existing openings, (2) new engineering addressing that loading condition, and (3) engineering addressing the uplift condition by the brace frame on the existing footing.
|
Plan resubmittals received | | | 4/11/2002 | | DONE |
|
|
|
Received two sets of resubmittal sheets A2.0, A3.1, structural calculations, letter from Engineering Incorporated, and cover letter. routed to Carl Westfall.
|
Routing - PLAN CHECK | 3/6/2002 | | 3/12/2002 | | |
|
|
|
On hold waiting for Fire to review.
|
Routing - FIRE | 3/12/2002 | | 3/12/2002 | | PASS |
Bill Alexander
|
|
|
|
Routing - FIRE | 3/5/2002 | | 3/6/2002 | | |
Bill Alexander
|
|
|
Failed first UFC review. Direction from Fire Department that no permitting allowed (specifically Assembly Increase) prior to aggreement on assembly occupancy control/s. Requires owner meeting with owner and Dave Miller and/or Steve Minnis.
|
Plan Review Completed(1st rev) | | | 3/6/2002 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 2/21/2002 | | 3/5/2002 | | |
|
|
|
Failed first UBC review. UBC plan review started March 4, 2002 and finished the next day. A response from the architect was required. See the conditions list. A copy of the plan review report was sent to the architect.
|
Routing - PLUMBING | 2/19/2002 | | 2/21/2002 | | PASS |
|
|
|
per plans and 2000 upc
|
Routing - PUBLIC WORKS | 2/13/2002 | | 2/19/2002 | | PASS |
|
|
|
|
Application received | | | 2/11/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/11/2002 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/11/2002 | | DONE |
|
|
|
1. Plans not fully dimensioned.
|
Fee Review-notes | 2/11/2002 | 2/11/2002 | | | |
|
|
|
|