Fee Review-notes | 7/15/2003 | 7/15/2003 | 7/15/2003 | | DONE |
|
|
|
|
Permanent occupancy | | | 3/12/2003 | | DONE |
|
|
|
Perm. Occ. Cert. #9581 issued 3-12-03 to Neurolux.
|
Permanent Occupancy | | 5/21/2002 | 5/21/2002 | | DONE |
|
|
|
|
BLD-Final | 5/21/2002 | 5/21/2002 | 5/21/2002 | P | PASS |
Tom Arcoraci
|
|
|
ALAN ###-#### ok for perm 5/21/2002 1:38:00 PM
|
FIRE-Final Inspection | 5/20/2002 | 5/20/2002 | 5/20/2002 | P | PASS |
Rick Jackson
|
|
|
###-####
|
BLD-Final | 4/16/2002 | 4/16/2002 | 4/16/2002 | P | PART |
Tom Arcoraci
|
|
|
re-insp -allen -###-#### fn ok for temp wip for bath demo 4/16/2002 4:06:48 PM
|
BLD-Final | 4/16/2002 | 4/16/2002 | 4/16/2002 | P | PART |
Tom Arcoraci
|
|
|
temp occ allen ###-#### ok for temp occ wip bath demo 4/16/2002 4:07:24 PM
|
FIRE-Final Inspection | 4/16/2002 | 4/16/2002 | 4/16/2002 | P | PART |
Rick Jackson
|
|
|
Scheduled by Inspector: 409 On 4/16/2002 10:48:42 AM temp occ approved per Dave Miller. Okay to use the new restroom area on plans; exit signs and exiting all per plans 4/16/2002 2:00:19 PM
|
BLD-Final | 4/12/2002 | 4/15/2002 | 4/15/2002 | A | NR |
Dave Hannah
|
|
|
###-#### OR ###-#### ALAN needs final for other trades and fire life saftey 4/15/2002 10:00:24 AM
|
FIRE-Final Inspection | 4/15/2002 | 4/15/2002 | 4/15/2002 | P | FAIL |
Rick Jackson
|
|
|
TEMPORARY IN 1 ROOM ###-#### ALAN exit sign not working at south exit; occupant load sign; fire extinguishers hung; told Alan that Dave Miller has to approve temp occupancy 4/15/2002 3:58:30 PM
|
BLD-Final | 4/15/2002 | 4/15/2002 | 4/15/2002 | P | NR |
Tom Arcoraci
|
|
|
###-#### ALAN 4/15/2002 3:14:02 PM needs other sigs 4/15/2002 3:14:20 PM
|
BLD-Framing/Rough-in | 4/5/2002 | 4/8/2002 | 4/8/2002 | A | PART |
Carl Dependahl
|
|
|
###-#### ALAN brace walls, ok to rock 4/8/2002 12:25:44 PM
|
Plan Reviewer's activity | | | 3/15/2002 | | PASS |
|
|
|
Approved a re-design for the expansion area. The occupant load was maintained at 47. A copy of the resubmitted sheet was given to the applicant and one was put with the file copy of the approved drawings.
|
Plan assigned to (CJW) | 2/14/2002 | | 3/13/2002 | | PASS |
Carl Westfall
|
|
|
3/13/2002 10:40:13 CJW - activity updated through activity BLDA022 from case BLD02-00272.
|
Routing - PLAN CHECK | 3/12/2002 | | 3/13/2002 | | PASS |
|
|
|
Drawings approved after resubmittal review.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/13/2002 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 3/13/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/13/2002 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 3/13/2002 | | DONE |
|
|
|
|
Plan resubmittals received | | | 3/12/2002 | | DONE |
|
|
|
Received two copies of resubmittal sheets A.1, A.2, and response. routed to Carl Westfall.
|
Routing - FIRE | 3/7/2002 | 3/11/2002 | 3/11/2002 | | PASS |
Bill Alexander
|
|
|
|
Plan Review Completed(1st rev) | | | 3/11/2002 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 2/21/2002 | | 3/7/2002 | | |
|
|
|
Failed first UBC review. UBC plan review started March 5, 2002 and finished March 7, 2002. A response was required from the architect. See the conditions list. A copy of the plan review report was sent to the architect.
|
Routing - PLUMBING | 2/15/2002 | | 2/20/2002 | | PASS |
|
|
|
no plumbing plan is required for T.I. restroom relocation. premise mprotection and thermol expantion protection may be required, all work to comply with the 2000 upc.
|
Routing - PUBLIC WORKS | 2/14/2002 | | 2/15/2002 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/12/2002 | | |
|
|
|
Diane has....
asked for plumb. and mech. plans
owners signature on Arch/Eng. record form
applicant states not serving food.
|
First Notice | 2/11/2002 | 2/11/2002 | 2/11/2002 | | DONE |
|
|
|
|
Application received | | | 2/11/2002 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/11/2002 | | DONE |
|
|
|
|