(LOCK STOCK & BARREL) To remodel an existing 8,090 sq.ft. two story building with a 3,650 sq. ft. storage basement for a new (A-3) assembly occupancy restaurant/bar and a (B) occupancy dining/kitchen tenant per approved plans on file. A second floor adjacent office tenant will be done under a separate (MIS) permit for occupancy approval but attached to the same plans. Work to include upgrading first floor restrooms to meet current accessibility standards, new one-hour rated occupancy separation wall with one-hour rated doors to separate assembly drinking areas and unseparated areas into 5,000 sq. ft. or less so the whole building does not require fire sprinklers, some new interior walls and doors, some new interior windows, new handrails with extensions on existing exit stairways, new accessible entry vestibule, interior finish, plumbing work, mechanical work, and electrical work. A CERTIFICATE OF OCCUPANCY IS TO BE ISSUED WHEN COMPLETED AND APPROVED. NOTE: The basement ONLY is sprinklered in this building. NOTE: There are some ALTERNATE APPROVALS from the Building Director for this building concerning allowed occupant load on the second floor with stairways less than 44", openings in property line wall, and basement exit separation not meeting 1/2 the diagonal. See letters on file and attached to plans. (PC#0085-02) JCB
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes7/17/20037/17/20037/17/2003 DONE
(F) Reprint permit  4/23/2003  
Permanent Occupancy 9/25/20029/25/2002 DONE
Details
Permanent Occupancy 9/25/20029/25/2002 DONE
Details
BLD-Final9/24/20029/25/20029/25/2002PPASS
DetailsCarl Dependahl
Try late in the afternoon and let me know if you are successful in learning anything about the door issue. Thanks!!...doors installed, final ok 9/25/2002 4:47:41 PM
Permanent occupancy  9/25/2002 DONE
Perm. Occ. Cert. #9379 issued 9-25-02 to the Lock Stock & Barrel.
BLD-Conference9/12/20029/18/20029/18/2002PPASS
DetailsCarl Dependahl
w/ Cathy W...will call Benneton Const re final. 9/18/2002 1:35:18 PM
BLD-Conference9/10/20029/17/20029/17/2002PCANC
DetailsCarl Dependahl
BLD-Conference9/12/20029/12/20029/12/2002PPART
DetailsCarl Dependahl
w/ fire insp....need final?
BLD-Conference9/10/20029/12/20029/12/2002PNH
DetailsCarl Dependahl
BLD-Conference9/10/20029/12/20029/12/2002PNH
DetailsCarl Dependahl
BLD-Conference9/6/20029/9/20029/9/2002ANH
DetailsCarl Dependahl
unable to contact 9/12/2002 1:31:07 PM
DOC - Permit Finaled9/6/20029/6/20029/6/2002PPASS
DetailsCarl Dependahl
BLD-Conference8/29/20029/3/20029/6/2002PCANC
DetailsCarl Dependahl
BLD-Conference8/27/20028/28/20028/29/2002PNR
DetailsCarl Dependahl
For t/o review
BLD-Final8/27/20028/27/20028/27/2002PNR
DetailsCarl Dependahl
left msg. 8/27/2002 5:27:15 PM
Fee Review-notes2/12/20022/12/20026/20/2002 DONE
FIRE-Final Inspection5/10/20025/13/20025/13/2002APASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 05/10/2002 at 12:07:27. Contact: ###-####. one bulb on emergency light on second floor not working; rated door on second floor has hold open; both to be fixed for structural inspection 5/13/2002 8:49:11 AM
BLD-Final5/10/20025/13/20025/13/2002AFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 05/10/2002 at 12:08:10. Contact: ###-####.
BLD-Conference5/13/20025/13/20025/13/2002PPASS
DetailsCarl Dependahl
re exist rated door at 2nd fl. kee 5/13/2002 2:53:12 PM c/n, need latching at 2nd fl occ sep wall 5/13/2002 2:56:58 PM
Temporary occupancy  5/13/2002 DONE
Temp. Occ. Cert. #4807 issued 5-13-02 to the Lock Stock & Barrel.
BLD-Conference5/6/20025/7/20025/7/2002ADONE
DetailsTony Young
Scheduled by a contractor via Hello! on 05/06/2002 at 13:43:40. Contact: ###-####.
conf by 340 5/7/2002 2:16:18 PM
BLD-Conference5/7/20025/7/20025/7/2002PCANC
DetailsTony Young
5/7/2002 11:34:20 AM
FIRE-Conference4/9/20024/9/20024/9/2002PPART
DetailsRick Jackson
Scheduled by Inspector: 409 On 4/9/2002 9:14:14 AM met with Cheryl of Erstad and went through the plans for exit signs; emergency lights; door hardware and kitchen requirements; basement sprinklers are overspaced and several areas unprotected; called Jsson about it and he said the exiting was based on full sprinklers from the basement; called Cheryl and told her the basement will have to be fully sprinklered 4/9/2002 3:33:28 PM
BLD-Conference4/9/20024/9/20024/9/2002PPASS
DetailsCarl Dependahl
w/ Fire & arch onsite re exit doors.
BLD-Framing/Rough-in4/8/20024/9/20024/9/2002APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 04/08/2002 at 12:35:23. Contact: ###-####. ok to cover, c/n ok...install rails & doors as needed per plan 4/9/2002 1:25:32 PM
BLD-Conference4/8/20024/8/20024/8/2002PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 4/8/2002 4:17:51 PM w/ arch re c/n...consult fire insp re door hdwe.
BLD-Framing/Rough-in4/4/20024/8/20024/8/2002AFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 04/04/2002 at 15:50:12. Contact: ###-####.complete fireblocks, remove face paper & un-backed 1/4" panelling 4/8/2002 11:28:11 AM
Issue PAID IN FULL permit  4/3/2002 DONE
Routing - FIRE3/28/20024/2/20024/2/2002 PASS
DetailsBill Alexander
Review attached waiver by Tim Hoagland.
Routing - PLAN CHECK4/2/2002 4/2/2002 PASS
Permit and plans approved and taken to front desk.
PLANS/APPL TAKEN TO FRONT DESK  4/2/2002 PASS
Inspection Record Card- Bld  4/2/2002 DONE
Print Occupancy Form  4/2/2002 DONE
Print Occupancy Form  4/2/2002 DONE
Telephone call  4/2/2002 DONE
Plan assigned to (JCB)2/14/2002 4/2/2002 PASS
DetailsJason Blais
4/2/2002 13:44:40 JCB - activity updated through activity BLDA022 from case BLD02-00276.
Routing - PLAN CHECK3/19/2002 3/28/2002 FAIL
MIS permit application still needs to be provided for the 2nd floor office tenant. Plans routed to the Fire Dept. for 2nd review.
Additional plans submitted  3/27/2002 DONE
Received letter from Andy Erstad/Cheryl Pearse to Jason and Tim Hogland, requesting the exception to half of the diagional to the basement stairs. Routed to Jason B. kmm
Plan resubmittals received  3/27/2002 DONE
RECEIVED TWO COPIES OF RESUBMITTAL SHEET a2.12 WITH TRANSMITTAL. ROUTED TO JASON BLAIS.
Telephone call  3/26/2002 DONE
Called architect's representative to discuss resubmittal drawings received. Basement floor plan to be addressed and another sheet will be provided.
Plan resubmittals received  3/25/2002 DONE
Received two copies of revised sheets a0.01, a1.00, a1.11, a2.10, a2.11, a2.12, a2.21, a6.11. One copy of plan check response letter, one copy of fire response letter, one copy of Unitied Water letter and one copy of Tenant Improvement Permit Application for Sandpiper Offices. Routed to Jason B. kmm
Routing - FIRE3/13/20023/19/20023/19/2002 FAIL
DetailsBill Alexander
Construction type is vague/conflicting which affect fire protection and required fire resistive issues, including exteriror walls and property lines. Verify hydrants and fire flows. Require info on cooking hood/s. Show egress ilumination, egress exit identification. Door hardware info is vague or lacking, etc.
Plan Review Completed(1st rev)  3/19/2002 DONE
Plan resubmittals received  3/18/2002 DONE
Received eight copies of a letter requesting exception for the occupant load. Routed to Jason Blais
Routing - PLANNING3/12/2002 3/12/2002 PASS
Route to Sarah Schafer. Approved per CZC02-24.
Plan resubmittals requested  3/12/2002  
Plan resubmittals and response required for further review.
Routing - PLAN CHECK2/20/2002 3/12/2002 FAIL
Plan review report sent and faxed to architect. Plan resubmittals and response required for further review. Plans routed to Planning and Fire Dept. for review.
Meeting  3/11/2002  
Met with architect's representative and went over deficient or missing items from submitted plans.
Routing - PLUMBING2/15/2002 2/20/2002 PASS
if any equipmenis relocated or installed a plumbing permit and inspection will be required
Routing - PUBLIC WORKS2/14/2002 2/15/2002 PASS
Additional plans submitted  2/15/2002 DONE
Received request for demo permit as soon as possible. Had applicant fill out revised certificate of value. Routed to Jason Blais.
Plans ACCEPTED BY PLAN TECH  2/12/2002 DONE
1. Plans not fully dimensioned.
Application received  2/12/2002  