Information based on query as of Saturday, August 17, 2024.
Permit Information
Permit NumberBLD02-00298
StatusFinaled
Name STATEWIDE CONSTRUCTION
Site Address 3601 S SHORTLEAF AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 1424 sq. ft. one story single family dwelling with a 502 sq. ft. attached two car garage and concrete patio per approved plans, all red-lining and attached requirement lists. PC #069 DJO
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/24/20027/25/20027/25/2002APASS
DetailsSteven Webb
brian ; Phone #: ###-#### C. of C. #23291 issued. 7/25/2002 9:33:57 AM
DOC - Permit Finaled7/25/20027/25/20027/25/2002APASS
DetailsSteven Webb
Finaled by inspector at 7/25/2002 9:34:06 AM
BLD-Final7/23/20027/24/20027/24/2002AFAIL
DetailsSteven Webb
###-#### brian C/N posted 7/24/2002 12:25:08 PM
BLD-Energy code compliance5/8/20025/9/20025/9/2002PPASS
DetailsSteven Webb
###-#### Ok to cover 5/9/2002 12:26:14 PM
BLD-Framing/Rough-in5/8/20025/8/20025/8/2002PPART
DetailsSteven Webb
Scheduled by Inspector: 420 On 5/8/2002 12:02:55 PM Ok to insulate--Gas fireplace needs inspection prior to cover is given. 5/8/2002 2:45:54 PM
BLD-Framing/Rough-in4/19/20024/22/20024/22/2002APART
DetailsDave Hannah
shear nail\\###-#### ok to cover ext 4/22/2002 9:13:39 AM
BLD-Foundation3/10/20023/11/20023/11/2002ACANC
DetailsSteven Webb
Scheduled by a contractor via Hello! on 03/10/2002 at 16:40:08. Contact: ###-####. Cancelled by contractor 3/11/2002 11:22:03 AM
BLD-Foundation3/11/20023/11/20023/11/2002PPART
DetailsSteven Webb
found ###-#### james wip--95% ready at time of inspection. 3/11/2002 2:08:31 PM
BLD-Footing3/8/20023/8/20023/8/2002PPART
DetailsSteven Webb
james- ###-#### -ft wip--30% ready at time of inspection-- 3/8/2002 1:52:37 PM
Inspection Record Card- Bld  3/5/2002 DONE
Telephone call  3/5/2002 DONE
Issue PAID IN FULL permit  3/5/2002 DONE
Plan assigned to (DJO)3/4/20023/4/20023/4/2002 PASS
DetailsDan Overy
3/4/2002 14:14:56 DJO - activity updated through activity BLDA022 from case BLD02-00298.
PLANS/APPL TAKEN TO FRONT DESK  3/4/2002 DONE
Case Summary (BLD)  3/4/2002 DONE
Plan Review Report  3/4/2002 DONE
Plans ACCEPTED BY PLAN CHECK  3/4/2002  
Routing - PUBLIC WORKS2/14/2002 2/19/2002 PASS
Routing - PLANNING2/14/2002 2/14/2002 PASS
Application received  2/14/2002  
Pending Assignment by DJO2/14/2002    
DetailsDan Overy
Routing - PLAN CHECK2/19/2002