First Notice | | 6/28/2004 | 8/10/2004 | | DONE |
|
|
|
|
Fee Review-notes | 2/15/2002 | 2/15/2002 | 8/10/2004 | | DONE |
|
|
|
|
BLD-Final | 6/23/2004 | 6/28/2004 | 6/28/2004 | P | PASS |
Tom Arcoraci
|
|
|
jim ; Phone #: ###-#### Internet Inspection Request from: Annette Moore ok for perm occ 6/28/2004 2:20:18 PM
|
Permanent occupancy UNPAID FEE | | | 6/28/2004 | | DONE |
|
|
|
Perm. Occ. Cert. # 10206 issued 6-28-04 to the Idaho Statesman.
|
Framing rough-in | 6/18/2004 | | 6/18/2004 | | DONE |
|
|
|
2 hrs after hour
|
FIRE-Final Inspection | 6/17/2004 | 6/17/2004 | 6/17/2004 | A | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled.
|
BLD-Aging Inspection | 5/10/2004 | 5/10/2004 | 5/10/2004 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 3/9/2004 | 3/9/2004 | 3/9/2004 | | NR |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 1/8/2004 | 1/8/2004 | 1/8/2004 | | NR |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 11/3/2003 | 11/3/2003 | 11/3/2003 | | PASS |
Tom Arcoraci
|
|
|
wip ok 11/3/2003 8:22:14 AM
|
FIRE-Conference | 8/29/2003 | 9/2/2003 | 9/2/2003 | A | DONE |
Troy Cobbley
|
|
|
jim ###-#### Went over alarm audibility issues with the engineer. They do have to meet all requirements of the code. The sprinkler contractor can use the 2002 NFPA 13 earthquaking requirements for the installations on this project 9/2/2003 9:45:25 AM
|
FIRE-Conference | 8/29/2003 | 9/2/2003 | 9/2/2003 | A | DONE |
Troy Cobbley
|
|
|
jim ###-#### Went over alarm audibility issues with the engineer. They do have to meet all requirements of the code. The sprinkler contractor can use the 2002 NFPA 13 earthquaking requirements for the installations on this project 9/2/2003 9:45:25 AM
|
BLD-Framing/Rough-in | 7/7/2003 | 7/8/2003 | 7/8/2003 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 7/7/2003 at 8:52:40 AM. Contact: ###-####. wip ok 7/8/2003 8:58:10 AM
|
FIRE-Final Inspection | 5/13/2003 | 5/20/2003 | 5/20/2003 | P | PART |
Troy Cobbley
|
|
|
See approved fire sprinkler plans for areas where occupancy is allowed 5/20/2003 4:28:27 PM
|
BLD-Framing/Rough-in | 4/15/2003 | 4/16/2003 | 4/16/2003 | A | PART |
Tom Arcoraci
|
|
|
JIM CELING GRID; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
Code Occupancy Approval | 4/14/2003 | 4/14/2003 | 4/14/2003 | P | DONE |
Scott M.Brown
|
|
|
LOOKS OK FINAL SIGNED OFF. 4/14/2003 1:11:47 PM
|
Code Occupancy Approval | 4/14/2003 | 4/14/2003 | 4/14/2003 | P | DONE |
Scott M.Brown
|
|
|
LOOKS OK FINAL SIGNED OFF. 4/14/2003 1:11:47 PM
|
PubWorks Occupancy Approval | 4/14/2003 | 4/14/2003 | 4/14/2003 | | DONE |
|
|
|
Drainage project complete, signed permanent occupancy 4/14/03. G.Fitts
|
Permanent Occupancy | | 4/14/2003 | 4/14/2003 | | DONE |
|
|
|
|
BLD-Final | 4/10/2003 | 4/11/2003 | 4/11/2003 | P | CANC |
Tom Arcoraci
|
|
|
###-####
|
FIRE-Final Inspection | 2/24/2003 | 2/25/2003 | 2/25/2003 | A | PART |
Troy Cobbley
|
|
|
JIM; Phone #: ###-#### Front lobby area and corridor area ok for perm occupancy. See approved alarm plans for exact location with todays date 2/25/2003 11:29:13 AM
|
BLD-Framing/Rough-in | 2/18/2003 | 2/19/2003 | 2/19/2003 | A | PART |
Tom Arcoraci
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung wip ok
2/19/2003 9:22:04 AM
|
FIRE-Final Inspection | 2/13/2003 | 2/13/2003 | 2/13/2003 | P | PART |
Troy Cobbley
|
|
|
###-#### Plate making room is OK to occupy. Battery in the emergency light will be verified on the next inspection 2/13/2003 1:17:05 PM
|
BLD-Framing/Rough-in | 2/6/2003 | 2/7/2003 | 2/7/2003 | A | PART |
Russ Owen
|
|
|
###-#### jim Grid ceiling upper floor rm 222. 2/7/2003 1:16:39 PM
|
BLD-Framing/Rough-in | 2/3/2003 | 2/4/2003 | 2/4/2003 | A | PART |
Russ Owen
|
|
|
JIM; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie front entry ok to ceiling. 2/4/2003 11:36:53 AM
|
BLD-Framing/Rough-in | 1/6/2003 | 1/7/2003 | 1/7/2003 | A | PART |
Tom Arcoraci
|
|
|
###-#### 1st floor corridor wip ok 2nd floor area e ok to occ 1/7/2003 9:43:17 AM
|
BLD-Framing/Rough-in | 12/17/2002 | 12/18/2002 | 12/18/2002 | A | PART |
Tom Arcoraci
|
|
|
ceiling grid ###-#### jim
|
FIRE-Final Inspection | 12/12/2002 | 12/13/2002 | 12/13/2002 | A | PART |
Troy Cobbley
|
|
|
see the city approved fire alarm plans for the areas that are dated with todays date that are ok to occupy for this phase of the project 12/13/2002 8:27:02 AM
|
BLD-Conference | 12/4/2002 | 12/4/2002 | 12/4/2002 | P | PASS |
Tom Arcoraci
|
|
|
###-#### bathroom door may need to be 3 0 12/4/2002 4:00:57 PM
|
BLD-Framing/Rough-in | 11/21/2002 | 11/22/2002 | 11/22/2002 | A | PART |
Russ Owen
|
|
|
###-#### ceilings in portion of structure inspection areas noted in job trailer. 11/22/2002 12:31:03 PM
|
BLD-Framing/Rough-in | 11/13/2002 | 11/13/2002 | 11/13/2002 | P | PART |
Tom Arcoraci
|
|
|
###-#### He needs Tom A. wip ok 11/13/2002 4:49:27 PM
|
BLD-Framing/Rough-in | 11/6/2002 | 11/7/2002 | 11/7/2002 | P | PART |
Jim Sly
|
|
|
###-#### jim 2nd floor frame...less restrooms...OK Need Plumb R/I approval on restrooms. OK to lid at elevator room. Need appr on deletion of walls at copy machines (center 2nd flr) and wing wall at SW stairway. 11/7/2002 3:33:28 PM 11/7/2002 3:36:01 PM
|
BLD-Framing/Rough-in | 10/24/2002 | 10/25/2002 | 10/25/2002 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/24/2002 at 08:34:05. Contact: . wip ok 10/28/2002 1:50:06 PM
|
BLD-Framing/Rough-in | 10/22/2002 | 10/22/2002 | 10/22/2002 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/22/2002 at 08:54:36. Contact: . sec a 1st floor ok 10/22/2002 2:31:48 PM
|
BLD-Conference | 9/11/2002 | 9/11/2002 | 9/11/2002 | P | PASS |
Tom Arcoraci
|
|
|
jim ; Phone #: ###-#### Internet Inspection Request from: Darla Downs will use shaft wall for corr lid 9/11/2002 1:42:50 PM
|
BLD-Framing/Rough-in | 9/5/2002 | 9/6/2002 | 9/6/2002 | A | PART |
Russ Owen
|
|
|
JIM CELING; Phone #: ###-#### Internet Inspection Request from: Darla DownsOk at single story addition. 9/6/2002 11:38:00 AM
|
FIRE-Conference | 8/29/2002 | 8/30/2002 | 8/30/2002 | A | NR |
Troy Cobbley
|
|
|
No approved plans on site and it doesn't appear the plans have even been submitted 8/30/2002 12:30:42 PM
|
BLD-Conference | 8/26/2002 | 8/26/2002 | 8/26/2002 | P | PART |
Tom Arcoraci
|
|
|
###-#### jim need resub for corridor construction 8/26/2002 2:29:51 PM
|
BLD-Framing/Rough-in | 8/21/2002 | 8/22/2002 | 8/22/2002 | P | PART |
Tom Arcoraci
|
|
|
Phone #: ###-#### wip 8/22/2002 11:11:41 AM
|
FIRE-Conference | 8/20/2002 | 8/21/2002 | 8/21/2002 | P | DONE |
Troy Cobbley
|
|
|
I spoke with the contractor about phasing of the project will need the approval of the fire dept 8/21/2002 3:09:12 PM
|
BLD-Framing/Rough-in | 8/6/2002 | 8/7/2002 | 8/7/2002 | A | PART |
Tom Arcoraci
|
|
|
###-#### JIM wip ok 8/7/2002 10:55:01 AM
|
BLD-Framing/Rough-in | 7/31/2002 | 8/1/2002 | 8/1/2002 | A | PART |
Tom Arcoraci
|
|
|
###-#### JIM ok to cover ext walls of new southern addition 8/1/2002 9:41:46 AM
|
BLD-Framing/Rough-in | 7/24/2002 | 7/25/2002 | 7/25/2002 | A | PART |
Tom Arcoraci
|
|
|
###-#### ok to cover ext of new bld 7/25/2002 9:31:55 AM
|
BLD-Conference | 6/25/2002 | 6/25/2002 | 6/25/2002 | P | PASS |
Tom Arcoraci
|
|
|
###-#### 2 HR WALLS AT WINDOWS IN CORNER 6/25/2002 2:23:20 PM
|
BLD-Foundation | 6/20/2002 | 6/21/2002 | 6/21/2002 | A | PASS |
Tom Arcoraci
|
|
|
###-####
|
BLD-Foundation | 6/18/2002 | 6/18/2002 | 6/18/2002 | P | DONE |
Tom Arcoraci
|
|
|
###-#### jim
|
BLD-Foundation | 6/13/2002 | 6/14/2002 | 6/14/2002 | A | PART |
Tom Arcoraci
|
|
|
rebar jim ###-#### footing ok 6/14/2002 9:44:24 AM
|
Plan resubmittals received | | | 6/14/2002 | | DONE |
|
|
|
Received (1) copy of resubmittal Sheets A2.04 and A2.10 with cover letter. Routed to Tom Arcoraci.
|
BLD-Footing | 6/11/2002 | 6/12/2002 | 6/12/2002 | A | PART |
Tom Arcoraci
|
|
|
JIM ###-#### 6/12/2002 11:34:08 AM ft north south and int fts 6/12/2002 11:35:05 AM
|
BLD-Footing | 6/11/2002 | 6/12/2002 | 6/12/2002 | P | CANC |
Tom Arcoraci
|
|
|
JIM ###-####
|
BLD-Conference | 6/4/2002 | 6/6/2002 | 6/6/2002 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by Inspector: 408 On 6/4/2002 10:55:29 AM 1 pm meeting with jason from hummel arch at site job shack waiting for resubmittal 6/6/2002 2:04:25 PM
|
BLD-Conference | 6/3/2002 | 6/5/2002 | 6/5/2002 | A | CANC |
Tom Arcoraci
|
|
|
Scheduled by Inspector: 408 On 6/3/2002 4:23:40 PM
|
BLD-Conference | 5/28/2002 | 5/28/2002 | 5/28/2002 | P | FAIL |
Russ Owen
|
|
|
###-####. needs plumbing and , c/n for sink. 5/28/2002 2:23:41 PM
|
Plan resubmittals received | | | 4/25/2002 | | DONE |
|
|
|
Received by fax (1) copy of comments addressing the plumbing review. Routed to Mike Otto.
|
Issue PAID IN FULL permit | | | 4/24/2002 | | DONE |
|
|
|
|
Routing - PLUMBING | 4/22/2002 | | 4/23/2002 | | PASS |
|
|
|
drainage will be required for full discharge of R.P.- note 3 page M2.24. note 4 page M2.24- potable water upstream of R.P., note should read CPVC.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/23/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/23/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/23/2002 | | DONE |
|
|
|
|
Telephone call | | | 4/23/2002 | | DONE |
|
|
|
permit ready
|
Routing Off Site - STRUCTURAL | 4/9/2002 | | 4/23/2002 | | PASS |
|
|
|
Contacted PDQ to take resubmitted plans of 4/9/02 to outside eng. kmm
|
Plan assigned to (MLO) | 2/19/2002 | | 4/23/2002 | | PASS |
Mike Otto
|
|
|
4/23/2002 14:43:52 MLO - activity updated through activity BLDA022 from case BLD02-00311.
|
Plan resubmittals received | | | 4/19/2002 | | DONE |
|
|
|
Received two sets of resubmittal sheets M2.24. Routed to Mike Otto.
|
Routing - PLUMBING | 4/11/2002 | | 4/17/2002 | | FAIL |
|
|
|
The responce I recieved from Engineerig Inc. was reviewed and all comments were acceptable with the exception of #4 with reference to a page M2.24. The plans submitted for rewiew are missing that page, please submit page M2.24 for review.
|
Routing - PLAN CHECK | 4/9/2002 | | 4/11/2002 | | PASS |
|
|
|
|
Plan resubmittals received | | | 4/9/2002 | | DONE |
|
|
|
Received two copies of revised sheets, cover sheet A2.03, A2.08, A2.09, A2.13, A2.14, A2.18, A5.03, A6.01, A7.07, A7.11, A8.01, A8.03, S2.2, S2.4, S3.1, S3.2, S3.3, M2.23, M2.26, M3.23, M3.31, M3.32, E2.09L, E2.10L, E2.11L, E2.13L, E2.14L. One copy of response letter, one copy of letter from allied Security and two copies of supplemental structural calculations. Routed to Mike O. kmm
|
Plan resubmittals received | | | 4/9/2002 | | DONE |
|
|
|
Received one copy of
|
Routing - PUBLIC WORKS | 4/2/2002 | | 4/9/2002 | | PASS |
|
|
|
route back to pw after first review complete. MLO
|
Routing - FIRE | 3/26/2002 | | 4/1/2002 | | PASS |
|
|
|
|
Routing Off Site - STRUCTURAL | 2/19/2002 | | 3/26/2002 | | FAIL |
|
|
|
contacted PDQ to take to outside eng. kmm
|
Routing - PLAN CHECK | 3/12/2001 | | 3/26/2002 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 3/26/2002 | | FAIL |
|
|
|
structural and non-structural UBC corrections sent to architect. MLO
|
Plan resubmittals received | | | 3/19/2002 | | DONE |
|
|
|
Received comments in response to plumbing plan review dated 3/12/02. routed to Mike O. kmm
|
Routing - PLUMBING | 3/1/2002 | | 3/12/2002 | | FAIL |
|
|
|
provide cross connection protection for all water supplied equipment, min. horizontal roof drain pipe size is 3", provide enlarged mech. room detail refered to on page M2.12, provide a plan showing the waste piping to fixtures on page M.2.26, plate making area, do not overload existing 2" water main with additional fixtures.
|
Plan resubmittals received | | | 3/12/2002 | | DONE |
|
|
|
Received five copies of revised sheets C1.01 and C2.01. Routed to Mike Otto to put two copies with plans and three copies to put with plans for Brian M. KMM
|
Routing - PLANNING | 2/28/2002 | | 3/1/2002 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 2/25/2002 | | 2/28/2002 | | FAIL |
|
|
|
|
Additional plans submitted | | | 2/27/2002 | | DONE |
|
|
|
Received two copies of supplemental structural investigation report. Routed to Mike O. KMM
|
Routing Off Site - STRUCTURAL | 2/27/2002 | | 2/27/2002 | | DONE |
|
|
|
Contacted PDQ to take supplemental structural investigation report. kmm
|
Routing - PLANNING Land Div | 2/19/2002 | | 2/25/2002 | | PASS |
|
|
|
Parcel is > 5 acres. Land division ok. Routed to Public Works. (blc)
|
Plans ACCEPTED BY PLAN TECH | | | 2/21/2002 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/19/2002 | | PEND |
|
|
|
Requires
1. Three extra civil sets
2. Drainage calcs.
3. O & M manuel
|
Plan routing begun/NEW & ADDTN | | | 2/19/2002 | | PEND |
|
|
|
Waiting for three extra civil, drainage calcs, and O & M plan
|
Application received | | | 2/15/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/15/2002 | | DONE |
|
|
|
|