Agreement of Future work | 7/16/2004 | 7/16/2005 | 11/4/2004 | | PASS |
Jason Blais
|
|
|
A portion of an existing 2-hour area separation wall (fire wall) to be upgraded. 11/4/04 Work completed and finaled under BLD04-02417.
|
Fee Review-notes | 2/19/2002 | 2/19/2002 | 4/21/2004 | | DONE |
|
|
|
|
BLD-Aging Inspection | 8/18/2003 | 8/18/2003 | 8/18/2003 | | DONE |
Jim Storey
|
|
|
pendind others sign offs. 8/18/2003 8:33:35 AM
|
DOC - Permit Finaled | | | 8/18/2003 | | DONE |
|
|
|
|
FIRE-Final Inspection | 6/18/2002 | 6/19/2002 | 6/19/2002 | A | PASS |
Rick Jackson
|
|
|
fire fn dennis- ###-####
|
FIRE-Final Inspection | 6/17/2002 | 6/18/2002 | 6/18/2002 | A | NR |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 06/17/2002 at 17:31:43. Contact: ###-####. GC called and said they aren't ready 6/18/2002 1:22:07 PM
|
BLD-Final | 6/17/2002 | 6/18/2002 | 6/18/2002 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 06/17/2002 at 17:33:41. Contact: ###-####.perm. occ ok pending plm mec and achd. 6/18/2002 3:59:50 PM
|
BLD-Final | 6/17/2002 | 6/18/2002 | 6/17/2002 | A | CANC |
Jim Storey
|
|
|
DENNIS ###-#### Disp set to [CANC] by a contractor via Hello! on 06/17/2002 at 17:35:47.
|
FIRE-Final Inspection | 6/14/2002 | 6/17/2002 | 6/17/2002 | A | FAIL |
Rick Jackson
|
|
|
cooking area insp- don- ###-####-fn rated door needs to meet 90 min; occupant load sign; extinguishing systems need MAU shutdown; duct detectors installed outside without protection (UL listing? for outside) 6/17/2002 5:10:15 PM
|
BLD-Framing/Rough-in | 6/7/2002 | 6/10/2002 | 6/10/2002 | A | PART |
Jim Storey
|
|
|
fr dennis ###-#### epoxi bolting special insp from previous c/n still out standing ok to cover cooler exterior walls pending ele and plm approvals. 6/10/2002 10:20:06 AM
|
BLD-Other | 6/2/2002 | 6/3/2002 | 6/3/2002 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 06/02/2002 at 22:14:38. Contact: ###-####....grid ok, combustible framing near hood is "gypped"...awaiting spec insp report(s) for Hilti epoxy anchors.. 6/3/2002 4:23:51 PM
|
BLD-Framing/Rough-in | 5/30/2002 | 5/30/2002 | 5/30/2002 | P | FAIL |
Carl Dependahl
|
|
|
###-####- dennis C/N, VERIFY SHAFTS, PROTECT WOOD W/I 18" OF TYPE 1 HOOD, ADD SEISMIC BRACE AT KITCHEN LID...SPEC INSP FOR HITI ANCHORS & STEEL AT ROOFTOP HVAC. 5/30/2002 4:36:38 PM
|
BLD-Framing/Rough-in | 4/22/2002 | 4/23/2002 | 4/23/2002 | A | PART |
Jim Storey
|
|
|
dennis ###-#### interior walls only ok for cover. 4/23/2002 11:24:59 AM
|
Plan assigned to (JCB) | 2/21/2002 | | 4/2/2002 | | PASS |
Jason Blais
|
|
|
4/2/2002 09:53:20 JCB - activity updated through activity BLDA022 from case BLD02-00314.
|
Routing - PLAN CHECK | 3/20/2002 | | 4/2/2002 | | PASS |
|
|
|
Permit and plans approved and taken to front desk.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/2/2002 | | PASS |
|
|
|
|
Print Occupancy Form | | | 4/2/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/2/2002 | | DONE |
|
|
|
|
Telephone call | | | 4/2/2002 | | DONE |
|
|
|
permit ready
|
Issue PAID IN FULL permit | | | 4/2/2002 | | DONE |
|
|
|
|
Plan resubmittals received | | | 3/29/2002 | | DONE |
|
|
|
Received two copies of revised sheet T1.0, A1.0, A2.0, A3.0, E2.5, M2, P2, P3. One copy of cover letter, one copy of Kolpak information and one copy of hood ul listing. Two copies of calculations. Routed to Jason B. kmm
|
Routing - FIRE | 3/15/2002 | | 3/20/2002 | | PASS |
|
|
|
|
Meeting | | | 3/15/2002 | | |
|
|
|
Met with architect Pat McKeegan and went over some issues needing to be addressed in this project. Resubmittal plans, engineering, and written response will be coming from architect.
|
Plan resubmittals requested | | | 3/15/2002 | | |
|
|
|
Plan resubmittals and response required for further review.
|
Routing - PLAN CHECK | 2/26/2002 | | 3/15/2002 | | FAIL |
|
|
|
Plan review report sent and faxed to architect. Plan resubmittals and response required for further review. Plans routed to Fire Dept. for review.
|
Routing - PLUMBING | 2/25/2002 | | 2/26/2002 | | PASS |
|
|
|
install 3" vent on the interceptor as the plan shows instead of the 2" vent the detail shows, additional cross connection protection may be required, if an automatic soap dispensor is to be installed at the mop sink provide a water supply for it.
|
Routing - PUBLIC WORKS | 2/21/2002 | | 2/25/2002 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/19/2002 | | DONE |
|
|
|
1. Plans not fully dimensioned. 2. CDH signed by Robert Mayer on 2/14/02.
|
Application received | | | 2/19/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/19/2002 | | DONE |
|
|
|
|