Case Summary (BLD) | | | 12/10/2007 | | DONE |
|
|
|
|
(F) Reprint permit | | | 12/10/2007 | | DONE |
|
|
|
|
Fee Review-notes | 7/17/2003 | 7/17/2003 | 7/17/2003 | | DONE |
|
|
|
|
Permanent occupancy | | | 1/15/2003 | | DONE |
|
|
|
Perm. Occ. Cert. #9529 issued 1-15-03 to the Brookside Apts.
|
Permanent Occupancy | | 1/14/2003 | 1/14/2003 | | DONE |
|
|
|
|
Temporary occupancy | | | 10/15/2002 | | DONE |
|
|
|
Temp. Occ. Cert. #4874 issued 10-15-02 to Brookside Apts.
|
BLD-Final | 10/9/2002 | 10/10/2002 | 10/10/2002 | A | PART |
Jim Storey
|
|
|
###-#### ###-#### fi nal ok pending all other sign offs. 10/10/2002 11:00:02 AM
|
FIRE-Final Inspection | 10/10/2002 | 10/10/2002 | 10/10/2002 | P | PASS |
Rick Jackson
|
|
|
|
FIRE-Sprinkler Rough-in | 10/8/2002 | 10/9/2002 | 10/9/2002 | P | FAIL |
Rick Jackson
|
|
|
###-#### outside alarm horn not working; dry sprinkler system alarm switch not working; need map at fire alarm panel 10/9/2002 3:08:41 PM
|
Code Occupancy Approval | 8/9/2002 | 8/9/2002 | 8/9/2002 | P | PASS |
Wm. Michael Meloy
|
|
|
|
BLD-Framing/Rough-in | 7/24/2002 | 7/25/2002 | 7/25/2002 | A | PASS |
Jim Storey
|
|
|
fr bruce- ###-#### late am please. 7/24/2002 4:27:09 PM
|
Inspection Record Card- Bld | | | 7/19/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/19/2002 | | DONE |
|
|
|
|
BLD-Energy code compliance | 6/27/2002 | 6/27/2002 | 6/27/2002 | P | PASS |
Jim Storey
|
|
|
BRUCE ###-#### framing made ok. 6/27/2002 2:34:18 PM
|
BLD-Energy code compliance | 6/26/2002 | 6/26/2002 | 6/26/2002 | P | PART |
Jim Storey
|
|
|
bruce ###-####--energy code ok to start gyp/washer box wall needs reinsp. 6/26/2002 2:30:07 PM
|
BLD-Framing/Rough-in | 6/24/2002 | 6/24/2002 | 6/24/2002 | P | FAIL |
Jim Storey
|
|
|
draft stop/fire chalk/bearing
|
Fee Review-notes | 5/28/2002 | 5/28/2002 | 5/28/2002 | | DONE |
|
|
|
resubmittals-changed from 2 permits to 1. additional plan check fees and admin. fees. lh
|
BLD-Framing/Rough-in | 4/26/2002 | 4/29/2002 | 4/29/2002 | A | PASS |
Jim Storey
|
|
|
sheer wall tim ###-#### nailling ok for exterior cover. 4/29/2002 10:52:16 AM
|
Plan resubmittals received | | | 4/11/2002 | | DONE |
|
|
|
Received revised certificate of value. Routed to Linda Hartwell and Mike Phillips.
|
Inspection Record Card- Bld | | | 4/3/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/3/2002 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 4/3/2002 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 4/1/2002 | | |
|
|
|
|
Routing - PLANNING Land Div | 4/1/2002 | | 4/1/2002 | | PASS |
|
|
|
Land division passed since Subdivision staff received surety to bond for completion of platting and compliance with conditions. Parcel hold removed and plans returned to Plan Review. (blc)
|
Routing - PLAN CHECK | 4/1/2002 | | 4/1/2002 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/1/2002 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 4/1/2002 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 4/1/2002 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 2/20/2002 | | 4/1/2002 | | PASS |
Mike Phillips
|
|
|
4/1/2002 16:34:32 M_P - activity updated through activity BLDA022 from case BLD02-00323.
|
Routing - FIRE | 3/28/2002 | 3/28/2002 | 3/28/2002 | | PASS |
Bill Alexander
|
|
|
|
Routing - PLAN CHECK | 3/22/2002 | | 3/28/2002 | | PEND |
|
|
|
Waiting for others to approve prior to issuing permit.
|
Plan Review Completed(1st rev) | | | 3/28/2002 | | DONE |
|
|
|
|
Plan resubmittals received | | | 3/25/2002 | | DONE |
|
|
|
Received three sets of resubmittal sheet CP-11. Routed to Mike Phillips.
|
Plan resubmittals received | | | 3/20/2002 | | DONE |
|
|
|
Received two sets of resubmittal sheets COVER SHEET, AS1, AS2, CD-1, CP-9, CP-10, CP-11, CE-5, UP2, UP3, D1, D-2, D3, D4, D5, D6, D6A, D7, EP2, EP3. Routed to Mike phillips.
|
Routing - PLAN CHECK | 3/1/2002 | | 3/7/2002 | | HOLD |
|
|
|
Architect put on hold until alternate is approved.
|
Routing Off Site - STRUCTURAL | 2/20/2002 | | 3/7/2002 | | PASS |
|
|
|
contacted PDQ to take plans to outside eng. kmm
|
Routing - PLUMBING | 2/28/2002 | | 3/1/2002 | | PASS |
|
|
|
See attached
|
Routing - PLANNING | 2/27/2002 | | 2/28/2002 | | PASS |
|
|
|
Approved as per CUP01-00151 (per Dave Abo's review). And approved per DRH01-219 (Marty Santoyo's review).
|
Routing - PUBLIC WORKS | 2/21/2002 | | 2/26/2002 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 2/20/2002 | | 2/21/2002 | | FAIL |
|
|
|
This property is currently being subdivided as Denise Place #2 / SUB01-00081. No building permits will be allowed until subdivision is recorded (except for those located in the former Lot 1, Block 7 of Denise Place Subdivision) per preliminary plat condition #25. Parcel tag placed. Routed to Public Works. (blc)
|
Plan routing begun/NEW & ADDTN | | | 2/20/2002 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/20/2002 | | DONE |
|
|
|
|
First Notice | 2/19/2002 | 2/19/2002 | 2/19/2002 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/19/2002 | | DONE |
|
|
|
|
Application received | | | 2/19/2002 | | |
|
|
|
|