Permit Information
Permit NumberBLD02-00345
StatusExpired
Name MATTER ARCHITECTURE (SEISMIC UPGRADE)
Site Address 1702 W FAIRVIEW AVE
Project NameKING BLDG
Customer Number 
ePlanReviewNo
Description
(MATTER ARCHITECTURE) This building is NOT fire sprinklered. To perform a seismic upgrade (Phase II) to an existing 3,380 square foot building (1,980 square foot 1st floor and 1,400 square foot 2nd floor). Phase I (BLD02-00057) included an accessible restroom, interior columns and beams, and stairway modifications. That permit was intended to establish a Certificate of Occupancy for the first floor. The 1994 Uniform Code for Building Conservation (UCBC) shall be used to define code compliance. Work is to include tying the exterior walls to the floor and roof. This permit is a shell permit and does NOT establish a Certificate of Occupancy for any tenant. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  5/13/2005 DONE
BLD-Conference2/22/20052/22/20052/22/2005ACANC
DetailsDave Hannah
BLD-Aging Inspection2/20/20042/20/20042/20/2004 DONE
DetailsDave Hannah
DOC - Permit Expired2/20/20042/20/20042/20/2004PPASS
DetailsDave Hannah
Expired by inspector at 2/20/2004 11:32:17 AM
BLD-Aging Inspection8/7/20038/7/20038/7/2003 PASS
DetailsCarl Dependahl
Wip...sloooww... 8/7/2003 8:31:00 AM
BLD-Conference5/15/20035/16/20035/16/2003PPASS
DetailsCarl Dependahl
seismic upgrade WIP 5/16/2003 2:10:09 PM
BLD-Conference1/23/20031/23/20031/23/2003PPASS
DetailsCarl Dependahl
rec'd eng's ok re spec insp items 1/23/2003 2:25:40 PM
BLD-Conference1/13/20031/13/20031/13/2003PPASS
DetailsCarl Dependahl
update permit work moving slowly ###-#### bill matter ...need eng's report, WIP ok. 1/13/2003 1:08:03 PM
BLD-Framing/Rough-in9/4/20029/5/20029/5/2002PPART
DetailsCarl Dependahl
call bill first, pre frame, elec not in; wants to relocate 1st fl rest room, ok w/ ADA dimensions. 9/5/2002 3:53:25 PM
Issue PAID IN FULL permit  3/20/2002 DONE
Plan assigned to (CJW)2/26/2002 3/15/2002 PASS
DetailsCarl Westfall
3/15/2002 14:23:46 CJW - activity updated through activity BLDA022 from case BLD02-00345.
Routing - PLAN CHECK2/26/2002 3/15/2002 PASS
UBC plan review started March 14, 2002 and finished March 15, 2002. The drawings were approved with conditions. See the conditions list.
Routing Off Site - STRUCTURAL2/28/2002 3/15/2002 PASS
called pdq to send to outside engineering. (3-15-02) Received a letter from consultant approving the seismic upgrade.
PLANS/APPL TAKEN TO FRONT DESK  3/15/2002 PASS
Inspection Record Card- Bld  3/15/2002 DONE
Telephone call  3/15/2002 DONE
###-#### bill
Additional plans submitted  2/28/2002 DONE
Received (one) set of sheets A1, A2, and A3 with original calculations. Routed to Carl Westfall.
Plan resubmittals received  2/28/2002 DONE
Received three sets of new structural calculations. Routed to Carl Westfall.
Plans ACCEPTED BY PLAN TECH  2/21/2002 DONE
1. Missing construction type on plans.
Application received  2/21/2002  
Recd Pcfee & Taken To Pln CK  2/21/2002 DONE
Fee Review-notes2/21/20022/21/2002