Permit Information
Permit NumberBLD02-00389
StatusFinaled
Name QUINTANA CONSTRUCTION
Site Address 1714 W HOWE
Project Name 
Customer Number 
ePlanReviewNo
Description
To build a new 1224s.f. 2-story single family dwelling with 786s.f. on the main level and 438s.f. on the upper level. The front wall interior main bearing wall and the tall walls at the stair area are fully engineered. r-1c setbacks approved per CVA01-00033 Mark Pecchinino P/Z All per the approved plans as marked. PC# 090 pep
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/17/20028/19/20028/19/2002ANH
DetailsSteven Webb
Scheduled by a contractor via Hello! on 08/17/2002 at 16:05:44. Contact: ###-####. C/N--No access 8/19/2002 10:53:21 AM
BLD-Final8/19/20028/19/20028/19/2002PPASS
DetailsJim Storey
###-#### larry garage code 2200
DOC - Permit Finaled8/19/20028/19/20028/19/2002PPASS
DetailsJim Storey
Finaled by inspector at 8/19/2002 2:02:24 PM
BLD-Final8/16/20028/16/20028/16/2002PFAIL
DetailsJim Storey
LARRY ###-#### saftey glazing within 24 of door/ fire stop garage/ handrails must return to wall. 8/16/2002 2:59:15 PM
BLD-Final8/15/20028/15/20028/15/2002PCANC
DetailsJim Storey
###-#### nr mech failed and called to say do not go. 8/15/2002 2:22:50 PM
BLD-Energy code compliance6/10/20026/11/20026/11/2002APASS
DetailsJim Storey
###-####
BLD-Framing/Rough-in6/7/20026/7/20026/7/2002PPASS
DetailsJim Storey
###-#### LARRY c/n made ok ok to insulate. 6/7/2002 4:15:16 PM
BLD-Framing/Rough-in6/5/20026/5/20026/5/2002PFAIL
DetailsJim Storey
1. need all sealants applied to top plates and sole plates be for framing insp.

2. holddowns for interior wall at back of kitchen for engineered sheer pannel need info.

3. need hanger at garage water heater header.
BLD-Framing/Rough-in5/29/20025/31/20025/31/2002ANR
DetailsJim Storey
Scheduled by a contractor via Hello! on 05/29/2002 at 09:47:17. Contact: ###-####.
BLD-Footing4/4/20024/5/20024/5/2002APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/04/2002 at 17:29:04. Contact: ###-####.
Issue PAID IN FULL permit  3/27/2002  
Plan assigned to (PEP)3/5/2002 3/6/2002 PASS
DetailsPerry Paine
3/6/2002 08:17:36 PEP - activity updated through activity BLDA022 from case BLD02-00389.
Inspection Record Card- Bld  3/6/2002 DONE
PLANS/APPL TAKEN TO FRONT DESK  3/6/2002 DONE
Inspector's copy Bld permit  3/5/2002 DONE
Plan Review Report  3/5/2002 DONE
Pending Assignment by DJO2/25/2002 3/5/2002 DONE
DetailsDan Overy
3/5/2002 10:03:20 PEP - activity updated through activity BLDA176 from case BLD02-00389.
Routing - PLANNING2/25/2002 2/26/2002 PASS
Routing - PUBLIC WORKS2/26/2002 2/26/2002 PASS
Application received  2/25/2002  
Routing - PLAN CHECK2/26/2002