Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD02-00397
StatusFinaled
Name FRED MEYER
Site Address 10751 W OVERLAND RD
Project NameFRED MEYER
Customer Number 
ePlanReviewNo
Description
(FRED MEYER-CLOTHING/SHOE DEPARTMENT) To remodel a 7,480 sq. ft. area for the Clothing and Shoe Department in an existing Fred Meyer retail store per approved plans on file. This store was origninally built in Ada County and later annexed into Boise City. Work to include miscellaneous interior demolition work, new accessible dressing room, new interior walls, new interior modular wall system, some suspended ceiling work, interior finish, fire sprinkler work, mechanical work, and electrical work. This is a Scope of Work Permit. LETTER OF COMPLETION TO BE ISSUED WHEN DONE. NOTE: This building is fully fire sprinklered and has 60' setbacks on all sides for unlimited area. (PC#0118-02) JCB
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes2/26/20022/26/20024/21/2004 DONE
DOC - Permit Finaled  8/18/2003 DONE
BLD-Final4/22/20024/22/20024/22/2002APASS
DetailsRuss Owen
Scheduled by a contractor via Hello! on 04/22/2002 at 06:51:00. Contact: ###-####.Ok done issued letter of compliance. 4/22/2002 12:14:00 PM
BLD-Final4/16/20024/17/20024/17/2002PFAIL
DetailsRuss Owen
Scheduled by a contractor via Hello! on 04/16/2002 at 17:13:44. Contact: ###-####. 4/17/2002 4:59:26 PM. Need to see the approve plans, to check wall and cabinet support. Called contractor. 4/17/2002 5:01:38 PM
BLD-Other4/3/20024/4/20024/4/2002PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 04/03/2002 at 15:41:05. Contact: ###-####.added top of wall wire supports to new framed walls. 4/5/2002 1:13:58 PM 4/5/2002 1:14:14 PM
BLD-Framing/Rough-in3/26/20023/27/20023/27/2002APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 03/26/2002 at 17:51:44. Contact: ###-####. Top of walls will need the support wires , talked with cont, said will be done soon and re-inspection called for. 3/27/2002 11:30:28 AM
Issue PAID IN FULL permit  3/26/2002 DONE
Inspection Record Card- Bld  3/25/2002 DONE
Telephone call  3/25/2002 DONE
will be in later today to get this permit
Routing - FIRE3/19/20023/22/20023/22/2002 PASS
DetailsBill Alexander
Plan Review Completed(1st rev)  3/22/2002 DONE
Routing - PLAN CHECK3/22/2002 3/22/2002 PASS
Plans and permit approved and taken to front desk.
PLANS/APPL TAKEN TO FRONT DESK  3/22/2002 PASS
Plan assigned to (JCB)2/26/2002 3/22/2002 PASS
DetailsJason Blais
3/22/2002 14:40:49 JCB - activity updated through activity BLDA022 from case BLD02-00397.
Routing - PLAN CHECK2/27/2002 3/19/2002 FAIL
Plan review report sent and faxed. Response to one item needed. (Info. on modular wall system.) Plans routed to Fire Dept. for review.
Routing - PUBLIC WORKS2/26/2002 2/27/2002 PASS
Plans ACCEPTED BY PLAN TECH  2/26/2002 DONE
1. Permit application states that "new fixtures" is apart of the scope of work. No detail provided for height of fixtures.
Application received  2/26/2002  
Recd Pcfee & Taken To Pln CK  2/26/2002 DONE