Fee Review-notes | 2/28/2002 | 2/28/2002 | 4/30/2004 | | DONE |
|
|
|
|
BLD-Final | 3/29/2004 | 3/30/2004 | 3/30/2004 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 3/29/2004 at 6:01:24 PM. Contact: ###-####. ok for perm 3/30/2004 10:51:07 AM
|
FIRE-Final Inspection | 3/30/2004 | 3/30/2004 | 3/30/2004 | A | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled
|
First Notice | | 3/30/2004 | 3/30/2004 | | DONE |
|
|
|
|
Permanent occupancy UNPAID FEE | | | 3/30/2004 | | DONE |
|
|
|
Perm. Occ. Cert. # 10062 issued 3-30-04 to Brico of Idaho.
|
Permanent Occupancy | | 3/29/2004 | 3/29/2004 | | DONE |
|
|
|
|
BLD-Final | 3/25/2004 | 3/26/2004 | 3/26/2004 | A | NR |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 3/25/2004 at 7:45:28 AM. Contact: ###-####.
|
BLD-Final | 3/26/2004 | 3/26/2004 | 3/26/2004 | P | NR |
Tom Arcoraci
|
|
|
|
FIRE-Final Inspection | 3/1/2004 | 3/2/2004 | 3/2/2004 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with dave millers permission until the monitoring of the hose system tie in has been approved. All other life safety items are ok to be signed off when the fire alarm is complete 3/2/2004 10:56:17 AM
|
BLD-Final | 3/1/2004 | 3/2/2004 | 3/2/2004 | A | PART |
Tom Arcoraci
|
|
|
ron; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok for temp 3/2/2004 10:55:47 AM
|
BLD-Final | 2/18/2004 | 2/23/2004 | 2/23/2004 | P | CANC |
Tom Arcoraci
|
|
|
ron; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
FIRE-Final Inspection | 2/23/2004 | 2/23/2004 | 2/23/2004 | P | CANC |
Troy Cobbley
|
|
|
ron ###-####
|
FIRE-Alarm Testing | 2/23/2004 | 2/23/2004 | 2/23/2004 | P | CANC |
Troy Cobbley
|
|
|
|
PubWorks Occupancy Approval | 2/10/2004 | 2/10/2004 | 2/10/2004 | | DONE |
|
|
|
Drainage project complete, signed permanent occupancy 2/10/04. R.Rokovitz
|
BLD-Final | 2/9/2004 | 2/9/2004 | 2/9/2004 | P | NR |
Tom Arcoraci
|
|
|
ron; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
Code Occupancy Approval Temp | 2/9/2004 | 2/9/2004 | 2/9/2004 | P | DONE |
Scott M.Brown
|
|
|
BOND IN PLACE TEMP SIGNED OFF 2/9/2004 1:33:05 PM
|
BLD-Wall cover | 1/26/2004 | 1/27/2004 | 1/27/2004 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 1/26/2004 at 2:03:46 PM. Contact: ###-####.
|
Code Occupancy Approval Temp | | | 1/22/2004 | | PART |
|
|
|
NEEDS TO BOND FOR LANDSCAPE PER DRH01-000222 IN AMOUNT OF $23,555 THEN CAN SIGN TEMP. OCCUPANCY
|
FIRE-Final Inspection | 1/14/2004 | 1/14/2004 | 1/14/2004 | P | PART |
Troy Cobbley
|
|
|
Ceiling in room that shares the restrooms east wall is ok to cover 1/14/2004 2:08:38 PM
|
BLD-Framing/Rough-in | 12/22/2003 | 12/23/2003 | 12/23/2003 | A | PART |
Tom Arcoraci
|
|
|
ok to cover pending ok on fire sprinklers 12/23/2003 8:50:47 AM
|
BLD-Framing/Rough-in | 12/22/2003 | 12/23/2003 | 12/23/2003 | A | PART |
Tom Arcoraci
|
|
|
ok to cover pending ok on fire sprinklers 12/23/2003 8:50:47 AM
|
BLD-Framing/Rough-in | 12/22/2003 | 12/23/2003 | 12/23/2003 | A | PART |
Tom Arcoraci
|
|
|
ok to cover pending ok on fire sprinklers 12/23/2003 8:50:47 AM
|
BLD-Wall cover | 12/22/2003 | 12/22/2003 | 12/22/2003 | P | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 12/22/2003 at 11:22:02 AM. Contact: ###-####. Out of time recalled. 12/22/2003 4:27:58 PM 12/22/2003 4:28:02 PM
|
BLD-Conference | 12/9/2003 | 12/9/2003 | 12/9/2003 | A | PASS |
Tom Arcoraci
|
|
|
wip ok 12/9/2003 9:56:29 AM
|
BLD-Conference | 12/8/2003 | 12/8/2003 | 12/8/2003 | P | DONE |
Troy Cobbley
|
|
|
I spoke to the contractor about the hollow columns at the entry way. After speaking to Bill sprinkler protection will not be required in them as long as the fire stopping is installed and the noncombustible insulation is installed against the combustible surfaces
|
FIRE-Conference | 12/4/2003 | 12/4/2003 | 12/4/2003 | P | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 12/4/2003 at 9:07:36 AM. Contact: ###-####. the GC will sheetrock the electrical room, janitors closet and willsprinkler above the ceiling in the breakroom; told GC to let sprinkler contractor know 12/4/2003 5:14:19 PM
|
FIRE-Conference | 11/20/2003 | 11/21/2003 | 11/21/2003 | A | DONE |
Troy Cobbley
|
|
|
Advised contractor that outside canopy needs to be sheeted with noncombustible material or sprinkler protection will need to be provided. He agreed to provide sheet rock 11/21/2003 9:24:18 AM
|
BLD-Other | 11/19/2003 | 11/19/2003 | 11/19/2003 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/19/2003 at 7:16:12 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 11/17/2003 | 11/18/2003 | 11/18/2003 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/17/2003 at 12:32:02 PM. Contact: ###-####. front ofice ok 11/18/2003 10:53:27 AM
|
BLD-Other | 11/17/2003 | 11/18/2003 | 11/18/2003 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/17/2003 at 12:32:41 PM. Contact: ###-####. ok for grout pour 11/18/2003 10:53:00 AM
|
BLD-Foundation | 10/29/2003 | 10/29/2003 | 10/29/2003 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/29/2003 at 7:59:28 AM. Contact: ###-####.
|
BLD-Footing | 10/23/2003 | 10/24/2003 | 10/24/2003 | A | PASS |
Tom Arcoraci
|
|
|
ron; Phone #: ###-#### Internet Inspection Request from: Darla Downs wip ok 10/24/2003 9:12:18 AM
|
BLD-Footing | 10/21/2003 | 10/22/2003 | 10/22/2003 | A | PASS |
Tom Arcoraci
|
|
|
###-#### ron
|
BLD-Footing | 10/20/2003 | 10/21/2003 | 10/21/2003 | P | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 10/20/2003 at 1:26:00 PM. Contact: ###-####.
|
BLD-Footing | 10/15/2003 | 10/16/2003 | 10/16/2003 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/15/2003 at 11:57:39 AM. Contact: ###-####. north side wall 10/16/2003 10:30:10 AM
|
BLD-Footing | 10/9/2003 | 10/13/2003 | 10/13/2003 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/9/2003 at 1:09:12 PM. Contact: ###-####. rebar and ft ok. 10/13/2003 9:19:11 AM
|
BLD-Aging Inspection | 8/19/2003 | 8/19/2003 | 8/19/2003 | | PASS |
Tom Arcoraci
|
|
|
slow progress extended permit on 6-03 8/19/2003 9:34:28 AM
|
BLD-Conference | 6/11/2003 | 6/16/2003 | 6/16/2003 | A | PASS |
Tom Arcoraci
|
|
|
###-#### wip slow extend permit 6/16/2003 10:43:52 AM
|
BLD-Aging Inspection | 3/28/2003 | 3/28/2003 | 3/28/2003 | | PASS |
Tom Arcoraci
|
|
|
|
Case Summary (BLD) | | | 1/13/2003 | | |
|
|
|
|
(F) Reprint permit | | | 12/30/2002 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/27/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/27/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/27/2002 | | DONE |
|
|
|
|
Telephone call | | | 12/27/2002 | | DONE |
|
|
|
permit ready and fees due
|
Issue PAID IN FULL permit | | | 12/27/2002 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 3/1/2002 | | 12/27/2002 | | PASS |
Mike Otto
|
|
|
12/27/2002 10:24:00 MLO - activity updated through activity BLDA022 from case BLD02-00420.
|
Extend Permit 180 days | | 9/5/2002 | 9/5/2002 | | DONE |
|
|
|
Permit application has been granted an extension to 12-31-02 by Tim Hogland per request from owner.
|
Plan Reviewer's activity | | | 8/23/2002 | | DONE |
|
|
|
received letter of request for an extension of time on permit application.
|
Routing - PLANNING Land Div | | | 8/20/2002 | | PASS |
|
|
|
ROUTE TO PLN LND USE UPON RESUBMITTAL FROM ARCHITECT AS OF 5/15/2002 MLO. PLANS IN PLAN REVIEW
|
Plan resubmittals received | | | 7/30/2002 | | DONE |
|
|
|
received letter from owner about not using mezzanine above offices which has no access at this time.
|
Routing - PLAN CHECK | 7/30/2002 | | 7/30/2002 | | PASS |
|
|
|
|
Routing Off Site - STRUCTURAL | 5/2/2002 | | 5/15/2002 | | PASS |
|
|
|
Contacted pdq to take the plans received 5-2-02. for the "Butler" metal building to outside eng.
|
Routing - PLANNING | 5/14/2002 | | 5/15/2002 | | PASS |
|
|
|
Approved per DRH01-222.
|
Routing - PLANNING Land Div | 5/13/2002 | | 5/14/2002 | | FAIL |
|
|
|
Still waiting for alley vacation/phoned engineer on 5-1-02
|
Routing - FIRE | 5/9/2002 | | 5/13/2002 | | PASS |
|
|
|
|
Routing Off Site - STRUCTURAL | 5/9/2002 | | 5/9/2002 | | DONE |
|
|
|
contacted pdq to take response letter out to outside eng. kmm
|
Routing - PLAN CHECK | 5/1/2002 | | 5/9/2002 | | PEND |
|
|
|
waiting for letter from owner regarding not having occupancy of mezzanine. Architects office contacted (Kyle) and message left. MLO
|
Plan resubmittals received | | | 5/2/2002 | | DONE |
|
|
|
Received three copies of Butler metal building drawings, two copies of revised stamped and signed drawings A-5.2 and A-6, one copy of response to fire dept. comments and response to bldg. dept. plan review comments and one copy of response to structural eng. comments. Routed to Mike O. KMM
|
Routing - PUBLIC WORKS | 4/26/2002 | | 5/1/2002 | | PASS |
|
|
|
After fire route to P.W.
|
Plan Review Completed(1st rev) | | | 4/26/2002 | | FAIL |
|
|
|
|
Routing - FIRE | 4/22/2002 | | 4/26/2002 | | FAIL |
|
|
|
HYDRANT, dispensing island, canopy, storage details, above ground and underground tank permits
|
Routing Off Site - STRUCTURAL | 3/25/2002 | | 4/22/2002 | | FAIL |
|
|
|
corrections sent to architect. MLO
|
Plan resubmittals requested | | | 4/22/2002 | | FAIL |
|
|
|
UBC non-structural and structural corrections. Plans for metal building must be provided for review.
|
Routing - PLAN CHECK | 4/16/2002 | | 4/22/2002 | | FAIL |
|
|
|
corrections mailed and faxed to architect
|
Routing - PLUMBING | 4/8/2002 | | 4/16/2002 | | PASS |
|
|
|
floor drains, though not listed on the fixture schecule, will be required in the restrooms.
|
Routing - PLANNING | 4/3/2002 | | 4/8/2002 | | FAIL |
|
|
|
PENDING DESIGN REVIEW REVIEW(PEND per SAR.) Design review has failed the plans because the cross access agreement has not been provided. Architect has been notified. (SMS)
|
Routing - PUBLIC WORKS | 3/7/2002 | | 4/2/2002 | | FAIL |
|
|
|
Requires drainage plan revisions per Brian M. kmm
|
Application received | | | 3/25/2002 | | DONE |
|
|
|
Plans resubmitted today under original BLD Number Bld02-00420, because it was not voided out on 3/6/02 per Rita DeYoung. I sent email to Linda Hartwell NOT to void the permit and refund fees as requested in previous email sent on 3/6/02.
|
Plans ACCEPTED BY PLAN TECH | | | 3/25/2002 | | DONE |
|
|
|
1. Called Trent with BRS on structural drawings for the pre-engineered building. He stated that he incorporated them into their drawings for the rest of the building.
|
Routing - PLANNING Land Div | 3/25/2002 | | 3/25/2002 | | FAIL |
|
|
|
Waiting for Record of Survey to be completed.
|
Telephone call | | | 3/6/2002 | | DONE |
|
|
|
Called Trent Koci regarding the missing documents that are required. Trent told me that he only has the (3) civil plans but is waiting for the drainage calculations and O&M from his civil engineer. He has called Butler for the structural design and calculations, but won't receive them until the end of the week or next week. I explained to Trent that it is policy that the pre-engineered structural design and calculations must be submitted with the plans at the time of permit application or the permit will be voided. After speaking to Dan Stuart, Dan stated that the permit needs to be voided. I also informed Trent that the check for the plan check fees will be refunded in approximately six weeks. I faxed Trent a letter to confirm this information with a copy of the "Pre-engineered Buildings and the Application Process" form. I sent Linda an email to void the permit.
|
Telephone call | | | 3/1/2002 | | DONE |
|
|
|
2/28/02 - Informed runner for applicant that (3) more sets of civil drawings were required with the drainage calculations and O&M. Marlene also gave her the "H Occupancy" form for requirements to be submitted.
3/1/02- Called Trent Koci with BRS Architects to follow-up on missing documents (3 sets of civil drawings, O&M, drainage calculations, and "H Occupancy"). I also informed Trent that I need (1) more set of structural calculations and the Butler engineering calculations and shop drawings. I told Trent that these would be required before I could start the routing process, by this afternoon.
|
Application received | | | 2/28/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/28/2002 | | |
|
|
|
|