BLD-Final | 5/7/2002 | 5/8/2002 | 5/8/2002 | A | PASS |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 5/8/2002 | 5/8/2002 | 5/8/2002 | A | PASS |
Jim Storey
|
|
|
Finaled by inspector at 5/8/2002 8:30:19 AM
|
BLD-Final | 5/6/2002 | 5/7/2002 | 5/7/2002 | A | FAIL |
Jim Storey
|
|
|
1. FIRE BLOCKING - In combustible construction fire blocking shall be provided (1) In concealed spaces of stud walls and partitions, including furred spaces, at the ceiling and floor levels and at 10-foot intervals both vertical and horizontal, (2) At all interconnections between concealed vertical and horizontal spaces such as occur at soffits, drop ceilings and cove ceilings, (3) In concealed spaces between stair stringers at the top and bottom of the run and between studs along and in line with the run of stairs if the walls under the stairs are unfinished, (4) In openings around vents, pipes, ducts, chimneys, fireplaces and similar openings which afford a passage for fire at ceiling and floor levels, with noncombustible materials, and (5) at openings between attic spaces and chimney chases for factory-built chimneys. (1997 UBC 708.2.1) Where fire blocks are allowed to be of combustible materials, fireblocking shall consist of 2 inches nominal lumber or two thicknesses of 1-inch nominal lumber with broken lap joints or one thickness of 23/32-inch wood structural panel with joints backed by 23/32-inch wood structural panel. Fire blocks may also be gypsum board, cement fiber board, batts or blankets of mineral or glass fiber, or other approved materials installed in such a manner as to be securely retained in place. (1997 UBC 708.2.2) fur down on living room ceilling provide fire blk. max 10 x 10 spacing.
|
BLD-Final | 5/7/2002 | 5/7/2002 | 5/7/2002 | P | FAIL |
Jim Storey
|
|
|
###-#### early pmout of time 5/7/2002 5:10:47 PM
|
BLD-Framing/Rough-in | 4/17/2002 | 4/18/2002 | 4/18/2002 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 04/17/2002 at 13:23:38. Contact: ###-####. Scheduled by a need to check draft stop at final.contractor via Hello! on 04/17/2002 at 13:23:38. Contact: ###-####. 4/18/2002 11:54:26 AM
|
BLD-Framing/Rough-in | 4/11/2002 | 4/11/2002 | 4/11/2002 | P | NR |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 04/11/2002 at 10:33:09. Contact: ###-####.
|
Issue PAID IN FULL permit | | | 4/2/2002 | | |
|
|
|
|
Inspection Record Card- Bld | | | 4/1/2002 | | |
|
|
|
|
Telephone call | | | 4/1/2002 | | DONE |
|
|
|
talked to robert to verify plans are ready
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/29/2002 | | PASS |
|
|
|
|
Plan assigned to (JCB) | 3/1/2002 | | 3/29/2002 | | PASS |
Jason Blais
|
|
|
3/29/2002 15:41:09 JCB - activity updated through activity BLDA022 from case BLD02-00427.
|
Routing - PLAN CHECK | 3/28/2002 | | 3/29/2002 | | PASS |
|
|
|
Plans and permit approved and taken to front desk.
|
Routing - PUBLIC WORKS | 3/28/2002 | | 3/28/2002 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 3/4/2002 | | 3/27/2002 | | PASS |
|
|
|
Okay by Brandi per Wayne's direction.
|
Routing - PLANNING | 3/1/2002 | | 3/4/2002 | | PASS |
|
|
|
|
Application received | | | 3/1/2002 | | |
|
|
|
|