Permit NumberBLD02-00431
StatusFinaled
Name NOEL FLINT
Site Address 6176 N EAGLE RD
Project NameTARGET COMMERCIAL
Customer Number 
ePlanReviewNo
Description
ZIONS BANK BUILDING - TO CONSTRUCT A NEW 6675 SQUARE FOOT, ONE STORY, WOOD FRAMED BANK BUILDING WITH A 1415 SQUARE FOOT BASEMENT AND RELATED SITE IMPROVEMENTS (MAIN BANK BUILDING 5590 SQUARE FEET, DRIVE-THRU CANOPY 1085 SQUARE FEET). ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED COMMENT LIST. DRH02-00007/CUP01-00156/PC#127-02/JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Code Occupancy Approval11/7/200211/6/200211/6/2002APASS
DetailsCarol Montgomery
Signed final
Permanent occupancy UNPAID FEE  10/18/2002 DONE
Perm. Occ. Cert. #9411 issued 10-18-02 to Zions Bank in the Target Commerical complex.
Permanent Occupancy 10/17/200210/17/2002 DONE
Details
FIRE-Final Inspection10/16/200210/17/200210/17/2002APASS
DetailsTroy Cobbley
the requirement for the knox box is no longer a requirement. Life/safety finaled 10/17/2002 10:48:16 AM
BLD-Final10/16/200210/17/200210/17/2002PPASS
DetailsJim Sly
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung OK for Perm. Occ. 10/17/2002 3:47:59 PM
BLD-Framing/Rough-in10/11/200210/11/200210/11/2002PPASS
DetailsJim Sly
CALL DAVID FIRST ; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung should be final....Temp OK. 10/11/2002 11:52:59 AM
BLD-Final10/11/200210/11/200210/11/2002APART
DetailsJim Sly
OK for Temp Occ.
BLD-Final10/10/200210/10/200210/10/2002PFAIL
DetailsJim Sly
###-#### C/N...Firecaulk and damper at 1hr ceiling Bsmnt Mech rm. 10/10/2002 3:48:53 PM
BLD-Final10/8/200210/9/200210/9/2002ANR
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 10/08/2002 at 12:38:47. Contact: ###-####. needs code enf to sign 10/9/2002 8:44:53 AM
PubWorks Occupancy Approval10/7/200210/7/200210/7/2002 DONE
Drainage project complete, signed permanent occupancy 10/7/02. R.Rokovitz
FIRE-Final Inspection10/3/200210/4/200210/4/2002PPART
DetailsTroy Cobbley
temporary occupancy given with dave millers permission until the knox box gets installed and the extinguishers get tagged 10/4/2002 2:03:05 PM
BLD-Final10/3/200210/4/200210/4/2002PNR
DetailsJim Sly
###-#### tim
BLD-Framing/Rough-in9/27/20029/30/20029/30/2002APART
DetailsJim Sly
TIM ###-#### 9/30/2002 10:24:07 AM
Override - Parcel Holds  9/27/2002  
BLD-Framing/Rough-in9/23/20029/23/20029/23/2002PPART
DetailsJim Sly
###-#### Conf on 1hr ceiling Bsmnt. 9/23/2002 2:51:03 PM
Override - Parcel Holds  9/23/2002  
BLD-Framing/Rough-in9/19/20029/20/20029/20/2002APART
DetailsJim Sly
###-#### Ceiling grid main room OK. 9/20/2002 10:52:06 AM
Override - Parcel Holds  9/19/2002  
BLD-Other9/12/20029/13/20029/13/2002APART
DetailsJim Sly
partial ceiling --tim ###-#### Perimeter offices OK for ceiling tile. 9/13/2002 12:02:06 PM
Override - Parcel Holds  9/12/2002  
BLD-Framing/Rough-in8/16/20028/19/20028/19/2002APASS
DetailsJim Storey
TIM ###-#### TIM ###-####framing ok. 8/19/2002 11:11:16 AM
Override - Parcel Holds  8/16/2002  
BLD-Framing/Rough-in8/13/20028/13/20028/13/2002PPART
DetailsJim Sly
tim ###-#### shear Roof nailing....OK. 8/13/2002 1:57:19 PM
Override - Parcel Holds  8/13/2002  
BLD-Framing/Rough-in8/12/20028/12/20028/12/2002PCANC
DetailsJim Sly
early pm ###-#### Canc by contr. 8/12/2002 1:54:45 PM
Override - Parcel Holds  8/12/2002  
BLD-Framing/Rough-in8/6/20028/7/20028/7/2002APART
DetailsRuss Owen
TIM ###-#### PARTIAL R/I AND A SHEAR NAIL roof area went over corrections with tim will recall. 8/7/2002 11:27:50 AM
Override - Parcel Holds  8/6/2002  
BLD-Framing/Rough-in7/26/20027/26/20027/26/2002PPART
DetailsJim Sly
fn insp tim- ###-#### -roof nailing Roof diaphram nailing and straps. OK 7/26/2002 2:42:32 PM
Override - Parcel Holds  7/26/2002  
BLD-Framing/Rough-in7/23/20027/24/20027/24/2002ANR
DetailsJim Sly
###-####\\partial
BLD-Framing/Rough-in7/23/20027/23/20027/23/2002PPART
DetailsDave Hannah
nailing \\###-#### shear nailing everything ok but for the back of the vault wall and two hold downs on the sw corners 7/23/2002 1:36:41 PM
Override - Parcel Holds  7/23/2002  
Override - Parcel Holds  7/23/2002  
BLD-Foundation6/17/20026/18/20026/18/2002APART
DetailsJim Sly
stem wall ###-#### kim East 1/2 of Bldg ( 2' stem wall).....Pending MTI insp, reports, and approvals. 6/18/2002 11:16:21 AM
   6/17/2002 DONE
DetailsAnnett Moore
Parcel Tag Notes: Ok to issue building permit, but DO NOT release Certificate of occupancy until Target Subdivision is recorded. Verify with Subdivisions staff before removal of this tag. (blc) Reason for OverRide:
BLD-Foundation6/12/20026/13/20026/13/2002APART
DetailsJim Sly
found wall -tim-###-#### 6/13/2002 10:42:51 AM Bsmnt walls ....Pending MTI insp and approvals. 6/13/2002 11:33:38 AM
Override - Parcel Holds  6/12/2002  
Override - Parcel Holds  6/12/2002  
BLD-Footing6/10/20026/11/20026/11/2002APART
DetailsJim Sly
kim ###-#### ft Footing for E wall E 1/2 of S wall and E 1/2 of N wall ....Pending MTI insp and approvals. 6/11/2002 12:11:09 PM 6/11/2002 12:19:46 PM
Override - Parcel Holds  6/10/2002  
BLD-Footing6/4/20026/5/20026/5/2002PPART
DetailsJim Sly
###-#### Bsmnt Footing Pending special insp. and approval. Special insp Gary (MTI) appears to be qualified to do the job. 6/5/2002 3:36:54 PM
Override - Parcel Holds  6/4/2002  
Override - Parcel Holds  6/4/2002  
Inspection Record Card- Bld  6/4/2002  
Print Occupancy Form  6/4/2002  
Override - Parcel Holds  6/4/2002  
Override - Parcel Holds  6/4/2002  
(F) Reprint permit  5/29/2002  
Override - Parcel Holds  5/28/2002  
Override - Parcel Holds  5/28/2002  
Override - Parcel Holds  5/28/2002  
Issue PAID IN FULL permit  5/28/2002 DONE
Routing - FIRE4/15/20024/15/20024/15/2002 PASS
DetailsBill Alexander
Routing - FIRE4/5/20024/9/20024/15/2002 FAIL
DetailsBill Alexander
Lack hydrant location (flows provided but not shown where)?
Plan assigned to (JCM)3/5/2002 4/15/2002 PASS
DetailsJohn Menard
4/15/2002 11:20:27 JCM - activity updated through activity BLDA022 from case BLD02-00431.
Routing - PLAN CHECK4/15/2002 4/15/2002 PASS
PLANS/APPL TAKEN TO FRONT DESK  4/15/2002 PASS
Override - Parcel Holds  4/15/2002  
Inspection Record Card- Bld  4/15/2002 DONE
Print Occupancy Form  4/15/2002 DONE
Plan Review Completed(1st rev)  4/15/2002 DONE
Routing - PLAN CHECK4/15/2002 4/15/2002  
Plan Reviewer's activity  4/15/2002 PASS
Reviewed and approved resubmitted plan revisions. JCM
Plan resubmittals received  4/11/2002 DONE
Received two sets of resubmittal sheets E2.1, A-2, and cover letter. Routed to John Menard.
Routing - PLAN CHECK3/29/2002 4/5/2002 FAIL
Plan resubmittals requested  4/5/2002 FAIL
Mailed the architect of record a copy of the plan review comment list requesting revisions. JCM
Routing Off Site - STRUCTURAL3/29/2002 4/3/2002 PASS
called pdq to send resubmittal sheets s0.1, s1.2, s2.1, s7.1, s7.2. dkl Recieved a fax from the consulting structural engineer approving the resubmitted plan sheets. JCM
Plan resubmittals received  3/28/2002 DONE
Received three copies of revised sheets S0.1, S1.2, S2.1, S7.1, S7.2 and struct. specs. Routed to John M. kmm
Routing - PLUMBING3/27/2002 3/28/2002 PASS
min. horizontal roof drainage piping is 3".
Routing - PLANNING3/22/2002 3/27/2002 PASS
Approved for cup, Mark Pecchenino CUP01-00156 Still requires DR review by Sarah Schafer . kmm Approved per drh02-7 and as noted on sheets A-5 and A-14. Memo written to file regarding these items and copied to architect.
Routing - PUBLIC WORKS3/20/2002 3/22/2002 PASS
Routing - PLANNING Land Div3/5/2002 3/19/2002 PASS
Land division will be ok when Target Subdivision is recorded. We will pass for permit release, but a parcel tag is being placed to restrict for Certificate of Occupancy until sub is recorded. Routed to Public Works. (blc)
Plan resubmittals requested  3/19/2002  
Faxed the architect of record a copy of the comment list from the consulting structural engineer requesting revisions. JCM
Routing Off Site - STRUCTURAL3/5/2002 3/18/2002 FAIL
contacted PDQ to take plans to outside eng. kmm Received comment list from consulting structural engineer requesting revisions. JCM
Plans ACCEPTED BY PLAN TECH  3/5/2002 PASS
Plan routing begun/NEW & ADDTN  3/5/2002 DONE
First Notice3/4/20023/4/20023/4/2002 DONE
project value 599,304 ele 58,500 p 23,300 m 29,140
Application received  3/4/2002  
Recd Pcfee & Taken To Pln CK  3/4/2002 DONE