BLD-Framing/Rough-in | 8/1/2002 | 8/2/2002 | 8/2/2002 | A | FAIL |
Steven Webb
|
|
|
STEVEN ; Phone #: ###-#### C/N--Final not framing--Provide prior c/notice--recall. 8/2/2002 8:54:30 AM
|
BLD-Final | 8/2/2002 | 8/2/2002 | 8/2/2002 | P | PASS |
Steven Webb
|
|
|
TROY ###-#### C. of C. #23296 issued. 8/2/2002 2:30:10 PM
|
DOC - Permit Finaled | 8/2/2002 | 8/2/2002 | 8/2/2002 | P | PASS |
Steven Webb
|
|
|
Finaled by inspector at 8/2/2002 2:30:18 PM
|
BLD-Final | 7/31/2002 | 7/31/2002 | 7/31/2002 | P | FAIL |
Dave Hannah
|
|
|
###-#### STEVE c/n on site 7/31/2002 2:42:16 PM
|
BLD-Framing/Rough-in | 5/10/2002 | 5/10/2002 | 5/10/2002 | P | PASS |
Steven Webb
|
|
|
###-####- troy ok to cover Energy--ok to cover 5/10/2002 2:11:12 PM
|
BLD-Framing/Rough-in | 5/9/2002 | 5/9/2002 | 5/9/2002 | P | PASS |
Steven Webb
|
|
|
###-#### bruce Prior c/n items completed--ok to insulate. 5/9/2002 4:14:14 PM
|
BLD-Framing/Rough-in | 5/7/2002 | 5/8/2002 | 5/8/2002 | A | PART |
Jim Storey
|
|
|
1. provide engineering to justify truss repair on 3 ply over grage and truss kot1 exstention of top chord west of stairway. bo4at trusses above grage require latral bracing at both ends of compretion web.
2. fire blk fire place at ceilling line 2 nd floor above garage.
3. c/n all other idems made ok ok to insulate.
|
BLD-Framing/Rough-in | 5/6/2002 | 5/6/2002 | 5/6/2002 | P | FAIL |
Steven Webb
|
|
|
###-#### steven C/n posted--Do not insulate 5/6/2002 3:36:48 PM
|
BLD-Framing/Rough-in | 4/16/2002 | 4/16/2002 | 4/16/2002 | P | PART |
Steven Webb
|
|
|
shear steve ###-#### SHEAR--Ext. ok to side. 4/16/2002 1:58:20 PM
|
BLD-Foundation | 3/22/2002 | 3/25/2002 | 3/25/2002 | A | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 03/22/2002 at 16:21:45. Contact: ###-####. wip 3/25/2002 9:28:39 AM
|
BLD-Footing | 3/21/2002 | 3/21/2002 | 3/21/2002 | P | PART |
Steven Webb
|
|
|
Scheduled by Inspector: 420 On 3/21/2002 2:07:57 PM wip--80% ready at time of inspection 3/21/2002 2:42:02 PM
|
Plan assigned to (DJO) | 3/7/2002 | 3/7/2002 | 3/21/2002 | | PASS |
Dan Overy
|
|
|
3/21/2002 11:50:30 DJO - activity updated through activity BLDA022 from case BLD02-00442.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/21/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/21/2002 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 3/21/2002 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 3/7/2002 | | |
|
|
|
|
Case Summary (BLD) | | | 3/7/2002 | | PEND |
|
|
|
|
Plan Review Report | | | 3/7/2002 | | PEND |
|
|
|
|
Plan Reviewer's activity | | | 3/7/2002 | | PEND |
|
|
|
permit will be issued when engineered roof framing plans are received.
|
Routing - PLANNING | 3/5/2002 | | 3/6/2002 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 3/6/2002 | | 3/6/2002 | | PASS |
|
|
|
|
Application received | | | 3/5/2002 | | |
|
|
|
|
Pending Assignment by DJO | 3/5/2002 | | | | |
Dan Overy
|
|
|
|
Routing - PLAN CHECK | 3/6/2002 | | | | |
|
|
|
|