Fee Review-notes | 3/5/2002 | 3/5/2002 | 4/30/2004 | | DONE |
|
|
|
|
BLD-Aging Inspection | 3/28/2003 | 3/28/2003 | 3/28/2003 | | PASS |
Jim Storey
|
|
|
106.4.4 ubc expired. 3/28/2003 11:34:53 AM
|
DOC - Permit Expired | 3/28/2003 | 3/28/2003 | 3/28/2003 | P | PASS |
Jim Storey
|
|
|
Expired by inspector at 3/28/2003 11:34:56 AM
|
BLD-Final | 8/22/2002 | 8/23/2002 | 8/23/2002 | A | PART |
Jim Storey
|
|
|
###-#### ###-####final ok pending all sign offs are complet card not on site. 8/23/2002 1:37:33 PM
|
FIRE-Final Inspection | 7/29/2002 | 7/29/2002 | 7/29/2002 | P | PASS |
Rick Jackson
|
|
|
|
BLD-Framing/Rough-in | 6/27/2002 | 6/28/2002 | 6/28/2002 | A | PART |
Jim Storey
|
|
|
###-#### DOC fire stop at loby tennet sie south end of wall. 6/28/2002 10:19:06 AM
|
BLD-Framing/Rough-in | 5/17/2002 | 5/20/2002 | 5/20/2002 | A | PART |
Jim Storey
|
|
|
###-#### doc ceiling grid wip 5/20/2002 2:28:12 PM
|
Issue PAID IN FULL permit | | | 4/16/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/8/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/8/2002 | | DONE |
|
|
|
|
Telephone call | | | 4/8/2002 | | DONE |
|
|
|
CALLED MATT PLANS READY
|
Routing - PLAN CHECK | 4/3/2002 | | 4/5/2002 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/5/2002 | | PASS |
|
|
|
|
Plan assigned to (R_H) | 3/8/2002 | | 4/5/2002 | | PASS |
|
|
|
4/5/2002 08:32:01 RMH - activity updated through activity BLDA022 from case BLD02-00443.
|
Routing - FIRE | 3/28/2002 | | 4/3/2002 | | PASS |
|
|
|
|
Case Summary (BLD) | | | 3/28/2002 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/8/2002 | | 3/28/2002 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/6/2002 | | DONE |
|
|
|
1. Faxed Architect/Engineer of Record Declaration Form to be completed and faxed back.
2. Plans not fully dimensioned.
3. The General Notes on sheet A2.0 state that " all plumbing, HVAC, and electrical is design build by the contractor".
|
Application received | | | 3/5/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/5/2002 | | DONE |
|
|
|
|