BLD-Final | 5/29/2002 | 5/30/2002 | 5/30/2002 | A | PASS |
Dave Hannah
|
|
|
tony ###-#### cell c.c # 20998 issued 5/30/2002 9:50:06 AM
|
DOC - Permit Finaled | 5/30/2002 | 5/30/2002 | 5/30/2002 | A | PASS |
Dave Hannah
|
|
|
Finaled by inspector at 5/30/2002 9:51:07 AM
|
BLD-Final | 5/28/2002 | 5/29/2002 | 5/29/2002 | A | NR |
Steven Webb
|
|
|
for occp. ###-#### tony
|
BLD-Final | 5/24/2002 | 5/28/2002 | 5/28/2002 | A | NR |
Russ Owen
|
|
|
TONY ###-####. Needs all other trades need to be signed off first. no inspections done. 5/28/2002 12:19:29 PM
|
(F) Reprint permit | | | 5/28/2002 | | |
|
|
|
|
BLD-Final | 5/17/2002 | 5/20/2002 | 5/20/2002 | P | CANC |
Steven Webb
|
|
|
###-####--cancel per jennifer
|
BLD-Energy code compliance | 4/18/2002 | 4/19/2002 | 4/19/2002 | A | FAIL |
Steven Webb
|
|
|
TONY ###-#### insulation not complete-and batt insulation not installed per manu. requirements. Correct and call for re-inspection. 4/19/2002 9:18:58 AM
|
BLD-Energy code compliance | 4/19/2002 | 4/19/2002 | 4/19/2002 | P | PASS |
Steven Webb
|
|
|
insulation- tony ###-####
|
BLD-Framing/Rough-in | 4/15/2002 | 4/15/2002 | 4/15/2002 | A | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 04/15/2002 at 06:42:48. Contact: ###-####. Partial compliance to prior c/n--ok to insulate. 4/15/2002 11:05:21 AM
|
BLD-Framing/Rough-in | 4/11/2002 | 4/12/2002 | 4/12/2002 | A | FAIL |
Steven Webb
|
|
|
###-#### c/n posted--do not insulate-seal package not done. 4/12/2002 9:22:51 AM
|
BLD-Framing/Rough-in | 4/2/2002 | 4/3/2002 | 4/3/2002 | A | PART |
Dave Hannah
|
|
|
SHEER NAIL ###-#### TONY ok to cover ext walls 4/3/2002 11:50:01 AM
|
BLD-Framing/Rough-in | 4/1/2002 | 4/1/2002 | 4/1/2002 | P | FAIL |
Steven Webb
|
|
|
SHEER NAILING ###-#### TONY --spacing not acceptable--staples fracturing surface excessively. 4/1/2002 2:03:18 PM
|
BLD-Foundation | 3/18/2002 | 3/19/2002 | 3/19/2002 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 03/18/2002 at 13:47:45. Contact: ###-####.
|
BLD-Footing | 3/14/2002 | 3/15/2002 | 3/15/2002 | A | CANC |
Steven Webb
|
|
|
Scheduled by Inspector: 420 On 3/14/2002 8:41:57 AM Cancelled by contractor 3/15/2002 8:44:03 AM
|
BLD-Footing | 3/15/2002 | 3/15/2002 | 3/15/2002 | P | PART |
Steven Webb
|
|
|
Scheduled by Inspector: 420 On 3/15/2002 3:00:24 PM wip--90% ready 3/15/2002 3:02:03 PM
|
BLD-Footing | 3/14/2002 | 3/14/2002 | 3/14/2002 | P | CANC |
Steven Webb
|
|
|
ft tony- ###-#### Cancelled by contractor 3/14/2002 8:42:17 AM
|
Plan assigned to (SAM) | 3/7/2002 | | 3/8/2002 | | PASS |
Steve Munroe
|
|
|
3/8/2002 14:07:23 SAM - activity updated through activity BLDA022 from case BLD02-00446.
|
Routing - PLAN CHECK | 3/6/2002 | | 3/8/2002 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 3/8/2002 | | PEND |
|
|
|
3/8/02 8:35 I called and talked to Paula, the engineer. I asked her about shear walls 4 and 5 and some of the beams and floor joist spacing.
|
Case Summary (BLD) | | | 3/8/2002 | | |
|
|
|
|
Plan Review Report | | | 3/8/2002 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/8/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/8/2002 | | DONE |
|
|
|
|
Telephone call | | | 3/8/2002 | | DONE |
|
|
|
SPOKE WITH NORTH BUILDERS PLANS READY
|
Issue PAID IN FULL permit | | | 3/8/2002 | | DONE |
|
|
|
|
Pending Assignment by DJO | 3/5/2002 | | 3/7/2002 | | DONE |
Dan Overy
|
|
|
3/7/2002 09:52:34 SAM - activity updated through activity BLDA183 from case BLD02-00446.
|
Plan Reviewer's activity | | | 3/7/2002 | | PEND |
|
|
|
Only one set of plans are being approved due to excessive red-lining.
|
Routing - PLANNING | 3/5/2002 | | 3/6/2002 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 3/6/2002 | | 3/6/2002 | | PASS |
|
|
|
|
Application received | | | 3/5/2002 | | |
|
|
|
|