Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD02-00449
StatusFinaled
Name WINKLER MARK
Site Address 5199 N QUAIL SUMMIT WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 4009 sq. ft. one story single family dwelling with a 944 sq. ft. attached three car garage, a 80 sq. ft. covered entry porch and a 198 sq. ft. covered concrete patio at rear of structure per approved plans, all engineering and attached requirement lists. Note: This lot is within a hillside area and is subject to the hillside ordinances. Class "A" roof system and defensible area will be maintained. PC #119 DJO
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/13/200211/14/200211/14/2002APASS
DetailsTony Young
mark- ###-####
DOC - Permit Finaled11/14/200211/14/200211/14/2002PPASS
DetailsTony Young
Finaled by inspector at 11/14/2002 11:49:27 AM
BLD-Grading Inspection11/13/200211/13/200211/13/2002 PASS
DetailsRita DeYoung
Final grading and drainage complete and approved
BLD-Framing/Rough-in7/5/20027/8/20027/8/2002APASS
DetailsTony Young
MARK ###-#### SHEER NAIL
BLD-Conference7/8/20027/8/20027/8/2002PPART
DetailsTony Young
changes in permit
new contractor ok 7/10/2002 12:52:19 PM
BLD-Framing/Rough-in7/5/20027/5/20027/5/2002PCANC
DetailsTony Young
Scheduled by a contractor via Hello! on 07/05/2002 at 07:32:35. Contact: ###-####.--cancel per doug
BLD-Energy code compliance6/26/20026/27/20026/27/2002PPASS
DetailsTony Young
Scheduled by a contractor via Hello! on 06/26/2002 at 16:56:09. Contact: ###-####.
BLD-Framing/Rough-in6/26/20026/27/20026/27/2002PPASS
DetailsTony Young
Scheduled by a contractor via Hello! on 06/26/2002 at 16:57:59. Contact: ###-####.
BLD-Framing/Rough-in6/24/20026/25/20026/25/2002PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 06/24/2002 at 13:01:00. Contact: ###-####.
c/n posted,, ok to insulate 6/25/2002 4:00:20 PM
BLD-Foundation3/26/20023/27/20023/27/2002PPART
DetailsTony Young
###-####
BLD-Footing3/25/20023/26/20023/26/2002APASS
DetailsCarl Dependahl
###-#### MANA
verify soil report says ok 3/25/2002 2:30:26 PM; ftgs ok, verified stamped site/soils approval letter as ok. 3/26/2002 10:10:28 AM
Plan assigned to (DJO)3/22/20023/22/20023/22/2002 PASS
DetailsDan Overy
3/22/2002 11:24:46 DJO - activity updated through activity BLDA022 from case BLD02-00449.
Case Summary (BLD)  3/22/2002 PEND
Plan Reviewer's activity  3/22/2002 PEND
have called designer for truss verification. overheight wall engineering and additional site plan to be received before issuance of permit.
Plan Review Report  3/22/2002 DONE
PLANS/APPL TAKEN TO FRONT DESK  3/22/2002 DONE
Inspection Record Card- Bld  3/22/2002 DONE
Telephone call  3/22/2002 DONE
MARK CALLED PLANS READY
Issue PAID IN FULL permit  3/22/2002 DONE
Plans ACCEPTED BY PLAN CHECK  3/22/2002  
Routing - PLANNING3/18/20023/18/20023/18/2002 PASS
Routing - PLAN CHECK3/11/2002 3/18/2002  
Routing - PLANNING3/7/2002 3/12/2002 FAIL
Called Dewitt homes. Patio in setback.
Routing - FIRE3/8/2002 3/11/2002 PASS
No fire sprinklers required.
Routing - PUBLIC WORKS3/7/2002 3/7/2002 PASS
Routing - PUBLIC WORKS GRADING3/6/2002 3/6/2002 PASS
DetailsRita DeYoung
Approved as category 3 with conditions of approval in letter attached to plans
Application received  3/6/2002  
Pending Assignment by DJO3/6/2002    
DetailsDan Overy
Routing - PLAN CHECK3/18/2002