Permit NumberBLD02-00453
StatusFinaled
Name ROBERT R COOPER CONSTRUCTION
Site Address 159 W THORNBERRY CT
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 4549 sq. ft. two story single family dwelling with a 1110 sq. ft. attached three car garage, a 140 sq. ft. covered entry portico, a 430 sq. ft. concrete covered wood deck and a 262 sq. ft. partially covered concrete patio at rear of structure and a 96 sq. ft. 2nd level deck at office per approved plans, all engineering and attached requirement lists. (1st floor 3077 sq. ft.)(2nd floor 1472 sq. ft.) This lot is within a hillside area and is subject to the hillside ordinances. Class "A" roof system and 30 ft. defensible space will be maintained. Structure shall be fully fire sprinklered with a system meeting the requirements of NFPA Standard 13D. System to be modified to protect all closets, bathrooms and attached garage. PC #176 DJO
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Code Occupancy Approval9/24/20039/24/20039/24/2003ACANC
DetailsWm. Michael Meloy
No Zoning Signature Required on this Permit. 9/24/2003 1:12:50 PM
DOC - Permit Finaled2/20/20032/20/20032/20/2003PPASS
DetailsTony Young
Finaled by inspector at 2/20/2003 2:34:19 PM
BLD-Energy code compliance2/18/20032/19/20032/19/2003PPASS
DetailsTony Young
Scheduled by a contractor via Hello! on 2/18/2003 at 1:33:13 PM. Contact: ###-####.
BLD-Final2/18/20032/19/20032/19/2003PPASS
DetailsTony Young
Scheduled by a contractor via Hello! on 2/18/2003 at 1:33:56 PM. Contact: ###-####.
l of c issued 2/20/2003 2:34:36 PM
BLD-Grading Inspection2/18/20032/18/20032/18/2003 BON
DetailsRita DeYoung
Final grading is complete. Revegetation is not. For this incomplete work the engineer has recommended a $400.00 bond. When this is submitted the grading and drainage are conditionally approved.
BLD-Conference2/14/20032/14/20032/14/2003AFAIL
DetailsCarl Dependahl
c/n: BEC F.P. doors, landings, air seal, courtesy insp. 2/14/2003 11:00:13 AM
FIRE-Final Inspection2/14/20032/14/20032/14/2003PPASS
DetailsRick Jackson
Print Occupancy Form  1/23/2003 DONE
Inspection Record Card- Bld  1/23/2003 DONE
BLD-Energy code compliance10/7/200210/8/200210/8/2002APASS
DetailsTony Young
Scheduled by a contractor via Hello! on 10/07/2002 at 16:03:02. Contact: ###-####.
BLD-Framing/Rough-in10/3/200210/4/200210/4/2002AFAIL
DetailsTony Young
Scheduled by a contractor via Hello! on 10/03/2002 at 12:23:16. Contact: ###-####.
c/n posted, ok to insulate 10/4/2002 12:12:22 PM
FIRE-Sprinkler Rough-in10/4/200210/4/200210/4/2002APASS
DetailsRick Jackson
okay to cover
BLD-Wall cover9/30/20029/30/20029/30/2002PFAIL
DetailsTony Young
Scheduled by a contractor via Hello! on 09/30/2002 at 09:32:36. Contact: ###-####.c/n posted,, no inspection 9/30/2002 4:53:50 PM
BLD-Other8/19/20028/20/20028/20/2002APART
DetailsTony Young
Scheduled by a contractor via Hello! on 08/19/2002 at 15:35:34. Contact: ###-####.ext. shear ok 8/20/2002 11:07:08 AM
BLD-Other8/15/20028/15/20028/15/2002PFAIL
DetailsDave Hannah
Scheduled by a contractor via Hello! on 08/15/2002 at 07:44:56. Contact: ###-####.need engineer on site to inspect and evaluate hold downs problems will need their retro design fix shear will need tobe completly reinspected 8/15/2002 1:58:32 PM
BLD-Framing/Rough-in5/30/20025/30/20025/30/2002PPART
DetailsDave Hannah
wall rebar insp vern ###-#### 90% complete still need to install hold downs allrebar is in and per plan 5/30/2002 3:35:18 PM
BLD-Footing5/17/20025/20/20025/20/2002APART
DetailsTony Young
BLD-Footing5/16/20025/17/20025/17/2002PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 05/16/2002 at 14:06:25. Contact: ###-####.wip 5/17/2002 3:54:36 PM
BLD-Grading Inspection5/16/20025/16/20025/16/2002 PASS
DetailsRita DeYoung
FOUNDATION SUBGRADE HAS BEEN APPROVED BY THE ENGINEER
Plan assigned to (DJO)4/11/20024/11/20024/17/2002 PASS
DetailsDan Overy
4/17/2002 13:28:18 DJO - activity updated through activity BLDA022 from case BLD02-00453.
Plan Reviewer's activity  4/17/2002 DONE
received change sheet and new engineering. ok to issue.
PLANS/APPL TAKEN TO FRONT DESK  4/17/2002 DONE
Case Summary (BLD)  4/17/2002 DONE
Plan Review Report  4/17/2002 DONE
Inspection Record Card- Bld  4/17/2002 DONE
Issue PAID IN FULL permit  4/17/2002 DONE
Plan Reviewer's activity  4/10/2002 PEND
have contacted designer for revisions, beam/header/footing pad information and engineering for overheight walls
Plans ACCEPTED BY PLAN CHECK  4/10/2002  
Routing - FIRE4/2/2002 4/3/2002 DONE
This home requires fire sprinklers.
Routing - PLANNING3/29/2002 4/2/2002 PASS
Routing - PUBLIC WORKS GRADING3/29/20023/29/20023/29/2002 PASS
DetailsRita DeYoung
APPROVED AS CATEGORY 3 WITH CONDITIONS OF APPROVAL IN LETTER ATTACHED TO PLANS
Routing - PUBLIC WORKS3/29/2002 3/29/2002 PASS
Routing - PUBLIC WORKS GRADING3/6/2002 3/12/2002 FAIL
DetailsRita DeYoung
Plans show deck in setback. Retaining wall geogrid extends across property line. Talked to Trey Hoff.
Application received  3/6/2002  
Pending Assignment by DJO3/6/2002    
DetailsDan Overy
Routing - PLAN CHECK4/3/2002