BLD-Final | 6/27/2002 | 6/27/2002 | 6/27/2002 | P | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 06/27/2002 at 09:57:02. Contact: ###-####. C. of C. #22482 6/27/2002 3:29:34 PM
|
DOC - Permit Finaled | 6/27/2002 | 6/27/2002 | 6/27/2002 | P | PASS |
Steven Webb
|
|
|
Finaled by inspector at 6/27/2002 3:29:39 PM
|
BLD-Framing/Rough-in | 5/1/2002 | 5/2/2002 | 5/2/2002 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 05/01/2002 at 15:41:30. Contact: ###-####.
|
BLD-Energy code compliance | 5/1/2002 | 5/2/2002 | 5/2/2002 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 05/01/2002 at 15:42:08. Contact: ###-####.
|
BLD-Framing/Rough-in | 4/30/2002 | 4/30/2002 | 4/30/2002 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 04/30/2002 at 08:43:16. Contact: ###-####.c/n on site ok to insulate 4/30/2002 3:37:54 PM
|
BLD-Framing/Rough-in | 4/15/2002 | 4/16/2002 | 4/16/2002 | A | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 04/15/2002 at 14:52:31. Contact: ###-####. SHEAR--ok to side 4/16/2002 8:25:11 AM
|
BLD-Foundation | 3/20/2002 | 3/20/2002 | 3/20/2002 | A | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 03/20/2002 at 07:20:35. Contact: ###-####. wip--90% ready at time of inspection 3/20/2002 2:39:52 PM
|
BLD-Footing | 3/18/2002 | 3/18/2002 | 3/18/2002 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 03/18/2002 at 08:30:22. Contact: ###-####. work in progress checked setbacks all ok 3/18/2002 4:49:10 PM
|
Inspection Record Card- Bld | | | 3/18/2002 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/15/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/15/2002 | | DONE |
|
|
|
|
Telephone call | | | 3/15/2002 | | DONE |
|
|
|
###-####
|
Issue PAID IN FULL permit | | | 3/15/2002 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/8/2002 | | 3/15/2002 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 3/13/2002 | | 3/15/2002 | | PASS |
Steve Munroe
|
|
|
3/15/2002 11:30:02 SAM - activity updated through activity BLDA022 from case BLD02-00460.
|
Plan Review Report | | | 3/14/2002 | | |
|
|
|
|
Case Summary (BLD) | | | 3/14/2002 | | |
|
|
|
|
Plan Reviewer's activity | | | 3/13/2002 | | PEND |
|
|
|
3/13/02 I called and left a message for the engineer to call me. I have questions about the beam loading (B2 and B3).
3/16/02 I returned the engineers call, Darrin Peterson. I let him know that I didn't see his loads from the girder truss on the second floor and roof load on the second floor.
|
Pending Assignment by DJO | 3/6/2002 | | 3/13/2002 | | DONE |
Dan Overy
|
|
|
3/13/2002 09:18:05 SAM - activity updated through activity BLDA183 from case BLD02-00460.
|
Routing - PUBLIC WORKS | 3/8/2002 | | 3/8/2002 | | PASS |
|
|
|
|
Routing - PLANNING | 3/6/2002 | | 3/7/2002 | | PASS |
|
|
|
|
Application received | | | 3/6/2002 | | |
|
|
|
|