Fee Review-notes | 7/17/2003 | 7/17/2003 | 7/17/2003 | | DONE |
|
|
|
Additional value from subcontractors.
|
Permanent occupancy | | | 7/23/2002 | | DONE |
|
|
|
Perm. Occ. Cert. #9268 issued 7-23-02 to the West Wing Deli in the Ada County Bldg.
|
Permanent Occupancy | | 7/12/2002 | 7/12/2002 | | DONE |
|
|
|
|
BLD-Final | 7/12/2002 | 7/12/2002 | 7/12/2002 | P | PASS |
Carl Dependahl
|
|
|
###-####...struct. ok for c/o 7/12/2002 3:08:11 PM
|
BLD-Final | 6/25/2002 | 6/27/2002 | 6/27/2002 | A | NR |
Carl Dependahl
|
|
|
###-#### ADRIAN verify htg final 6/27/2002 3:37:12 PM
|
FIRE-Final Inspection | 6/26/2002 | 6/27/2002 | 6/27/2002 | A | PASS |
Rick Jackson
|
|
|
Scheduled by Inspector: 409 On 6/26/2002 2:26:11 PM
|
BLD-Final | 6/27/2002 | 6/27/2002 | 6/27/2002 | P | PART |
Carl Dependahl
|
|
|
ok, pend perm plbg & cdhd 6/27/2002 4:10:30 PM
|
FIRE-Final Inspection | 6/25/2002 | 6/26/2002 | 6/26/2002 | P | NR |
Rick Jackson
|
|
|
###-#### ADRIAN couldn't test duct detectors 6/26/2002 2:27:06 PM
|
FIRE-Final Inspection | 6/21/2002 | 6/21/2002 | 6/21/2002 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by Inspector: 409 On 6/21/2002 8:45:54 AM occupant load sign; south exit door not installed; sprinkler heads painted; couldn't complete alarm test - no power to AHU's 6/21/2002 8:49:07 AM
|
FIRE-Hydro test above ground | 6/17/2002 | 6/18/2002 | 6/18/2002 | A | NR |
Rick Jackson
|
|
|
###-#### adrian
|
BLD-Final | 6/17/2002 | 6/18/2002 | 6/18/2002 | A | CANC |
Dave Hannah
|
|
|
###-#### adrian
|
Print Occupancy Form | | | 6/17/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/28/2002 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 5/15/2002 | 5/16/2002 | 5/16/2002 | P | PART |
Carl Dependahl
|
|
|
###-####
|
BLD-Framing/Rough-in | 5/15/2002 | 5/15/2002 | 5/15/2002 | P | PART |
Carl Dependahl
|
|
|
###-#### adrian walls ok 5/15/2002 5:20:32 PM
|
BLD-Framing/Rough-in | 5/10/2002 | 5/13/2002 | 5/13/2002 | A | NR |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 05/10/2002 at 15:52:50. Contact: ###-####....need elec r/i for int walls 5/13/2002 2:27:31 PM
|
BLD-Framing/Rough-in | 5/3/2002 | 5/3/2002 | 5/3/2002 | P | PART |
Carl Dependahl
|
|
|
###-#### ADRIAN ok to cover ext wall at window areas pending other trades. no plbg or elec noted 5/3/2002 3:46:14 PM
|
Issue PAID IN FULL permit | | | 4/11/2002 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 3/11/2002 | | 4/5/2002 | | PASS |
Carl Westfall
|
|
|
4/5/2002 07:58:07 CJW - activity updated through activity BLDA022 from case BLD02-00477.
|
Inspection Record Card- Bld | | | 4/5/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/5/2002 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 4/3/2002 | | 4/4/2002 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/4/2002 | | PASS |
|
|
|
|
Routing - FIRE | 3/28/2002 | 4/2/2002 | 4/3/2002 | | PASS |
Bill Alexander
|
|
|
|
Plan Review Completed(1st rev) | | | 4/3/2002 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/20/2002 | | 3/28/2002 | | PASS |
|
|
|
UBC plan review started March 26, 2002 and finished March 28, 2002. The drawings were approved with conditions. See the conditions list.
|
Routing - PLUMBING | 3/19/2002 | | 3/20/2002 | | PASS |
|
|
|
1" min. cw branch to the restroom required, if it is determined that the grease trap isn't functioning properly the dishwasher will be required to be removed.
|
Routing - PUBLIC WORKS | 3/11/2002 | | 3/19/2002 | | PASS |
|
|
|
|
Plan resubmittals received | | | 3/18/2002 | | DONE |
|
|
|
Received two copies of revised M1.0, M2.0 & M3.0. Put with plans. KMM
|
Plan resubmittals received | | | 3/12/2002 | | DONE |
|
|
|
Received two copies of revised sheets M1.0, M2.0, M4.0, routed to Carl W. kmm
|
First Notice | 3/7/2002 | 3/7/2002 | 3/7/2002 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/7/2002 | | DONE |
|
|
|
|
Application received | | | 3/7/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/7/2002 | | DONE |
|
|
|
|