Permanent occupancy UNPAID FEE | | | 8/15/2002 | | DONE |
|
|
|
Perm. Occ. Cert. #9296 issued 8-15-02 to American Eagle Airlines.
|
Print Occupancy Form | | | 8/14/2002 | | DONE |
|
|
|
|
BLD-Final | 7/31/2002 | 7/31/2002 | 7/31/2002 | P | PASS |
Jim Storey
|
|
|
duane marler ###-#### please call thought it had been finaled but activity show it as not. Duane would like to know is left. lhfina 7/31/2002 3:13:24 PM l ok. 7/31/2002 3:13:32 PM
|
FIRE-Final Inspection | 7/31/2002 | 7/31/2002 | 7/31/2002 | P | PASS |
Rick Jackson
|
|
|
|
Permanent Occupancy | | 7/31/2002 | 7/31/2002 | | DONE |
|
|
|
|
Fee Review-notes | 3/11/2002 | 3/11/2002 | 7/31/2002 | | DONE |
|
|
|
done
|
BLD-Final | 6/13/2002 | 6/14/2002 | 6/14/2002 | P | NR |
Jim Storey
|
|
|
DUANE MARLER ###-#### CALL 1ST PLEASE
|
FIRE-Final Inspection | 6/13/2002 | 6/13/2002 | 6/13/2002 | P | FAIL |
Rick Jackson
|
|
|
DUANE MARLER ###-#### CALL 1ST PLEASE fusible link near ceiling; penetrations; shutter not closing 6/13/2002 2:27:29 PM
|
| | | 6/13/2002 | | DONE |
Annett Moore
|
|
|
Parcel Tag Notes: OKAY TO SEND OUT INSPECTIONS FOR ALL TRADES ON BLD00-03428. The following note pertains to plan modifications in process involving future work.
CCD 008 Plan Modification includes:
1. Space added:
a. 3,215 S.F. first floor
b. 4,161 S.F. second floor
c. 1,533 S.F. third floor
d. basement
2. Security checkpoint has been rearranged to increase number of check points.
3. Relocation of restrooms
4. Meeter/greeter lobby was added at the second floor adjacent to security checkpoint as a holding area for people waiting for passengers.
5. Rental car lobby at the first floor was expanded in the area
below the meeter/greeter lobby on the second floor.
6. A third floor mech. room was added to support the additional building area.
CCD 011 Plan Modification includes:
1. Modifications to current basement layout (under to accomodate airport storage needs & additional space needs for airport police force.
(any questions contact John Menard at ###-####)
(5-20-02) Please override this tag for all activities associated with permit BLD02-01037. CJW Reason for OverRide:
|
| | | 6/13/2002 | | DONE |
Annett Moore
|
|
|
Parcel Tag Notes: OKAY TO SEND OUT INSPECTIONS FOR ALL TRADES ON BLD00-03428. The following note pertains to plan modifications in process involving future work.
CCD 008 Plan Modification includes:
1. Space added:
a. 3,215 S.F. first floor
b. 4,161 S.F. second floor
c. 1,533 S.F. third floor
d. basement
2. Security checkpoint has been rearranged to increase number of check points.
3. Relocation of restrooms
4. Meeter/greeter lobby was added at the second floor adjacent to security checkpoint as a holding area for people waiting for passengers.
5. Rental car lobby at the first floor was expanded in the area
below the meeter/greeter lobby on the second floor.
6. A third floor mech. room was added to support the additional building area.
CCD 011 Plan Modification includes:
1. Modifications to current basement layout (under to accomodate airport storage needs & additional space needs for airport police force.
(any questions contact John Menard at ###-####)
(5-20-02) Please override this tag for all activities associated with permit BLD02-01037. CJW Reason for OverRide:
|
BLD-Final | 6/3/2002 | 6/4/2002 | 6/4/2002 | A | NR |
Jim Storey
|
|
|
DUANE ###-#### pending other insp. for final before bld final can be performed. 6/7/2002 5:26:03 PM
|
| | | 6/3/2002 | | DONE |
Annett Moore
|
|
|
Parcel Tag Notes: OKAY TO SEND OUT INSPECTIONS FOR ALL TRADES ON BLD00-03428. The following note pertains to plan modifications in process involving future work.
CCD 008 Plan Modification includes:
1. Space added:
a. 3,215 S.F. first floor
b. 4,161 S.F. second floor
c. 1,533 S.F. third floor
d. basement
2. Security checkpoint has been rearranged to increase number of check points.
3. Relocation of restrooms
4. Meeter/greeter lobby was added at the second floor adjacent to security checkpoint as a holding area for people waiting for passengers.
5. Rental car lobby at the first floor was expanded in the area
below the meeter/greeter lobby on the second floor.
6. A third floor mech. room was added to support the additional building area.
CCD 011 Plan Modification includes:
1. Modifications to current basement layout (under to accomodate airport storage needs & additional space needs for airport police force.
(any questions contact John Menard at ###-####)
(5-20-02) Please override this tag for all activities associated with permit BLD02-01037. CJW Reason for OverRide:
|
BLD-Framing/Rough-in | 5/1/2002 | 5/1/2002 | 5/1/2002 | P | PASS |
Jim Storey
|
|
|
1. (Listed electrical boxes in walls) Membrane penetrations for electrical outlet boxes of any material are permitted, provided that such boxes are tested for use in fire-resistive assemblies and installed in accordance with the tested assembly. (1997 UBC 709.7 Exception #1)putty pad one box/ ok to cover and vervy at final.
|
Override - Parcel Holds | | | 5/1/2002 | | DONE |
Annett Moore
|
|
|
Parcel Tag Notes: OKAY TO SEND OUT INSPECTIONS FOR ALL TRADES ON BLD00-03428. The following note pertains to plan modifications in process involving future work.
CCD 008 Plan Modification includes:
1. Space added:
a. 3,215 S.F. first floor
b. 4,161 S.F. second floor
c. 1,533 S.F. third floor
d. basement
2. Security checkpoint has been rearranged to increase number of check points.
3. Relocation of restrooms
4. Meeter/greeter lobby was added at the second floor adjacent to security checkpoint as a holding area for people waiting for passengers.
5. Rental car lobby at the first floor was expanded in the area
below the meeter/greeter lobby on the second floor.
6. A third floor mech. room was added to support the additional building area.
CCD 011 Plan Modification includes:
1. Modifications to current basement layout (under to accomodate airport storage needs & additional space needs for airport police force.
(any questions contact John Menard at ###-####)
Reason for OverRide:
|
Telephone call | | | 4/8/2002 | | DONE |
|
|
|
CALLED LEFT V-MESSAGE PLANS READY 4-8-02 ///DLD
|
Override - Parcel Holds | | | 4/8/2002 | | |
|
|
|
|
Inspection Record Card- Bld | | | 4/8/2002 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 4/8/2002 | | |
|
|
|
|
Issue & PRINT to be Invoiced | | | 4/8/2002 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 3/15/2002 | | 4/4/2002 | | PASS |
Carl Westfall
|
|
|
4/4/2002 09:04:37 CJW - activity updated through activity BLDA022 from case BLD02-00494.
|
Routing - PLAN CHECK | 4/3/2002 | | 4/4/2002 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/4/2002 | | PASS |
|
|
|
|
Routing - FIRE | 3/28/2002 | | 4/3/2002 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 3/15/2002 | | 3/28/2002 | | PASS |
|
|
|
UBC plan review started March 28, 2002 and finished the same day. The drawings were approved with conditions. See the conditions list.
|
Plans ACCEPTED BY PLAN TECH | | | 3/11/2002 | | DONE |
|
|
|
Revised plans submitted 3/13/02, changed out with plans originally submitted.
1. Building code data not on front of plans.
|
Application received | | | 3/11/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/11/2002 | | DONE |
|
|
|
JV entry will email Linda
|