Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD02-00494
StatusFinaled
Name AMERICAN EAGLE AIRLINES
Site Address 3201 W AIRPORT WAY
Project NameAIRPORT
Customer Number 
ePlanReviewNo
Description
(AMERICAN EAGLE AIRLINES - BOISE AIRPORT - TICKET COUNTER) This building is fire sprinklered for building area increase. To remodel a 360 square foot area within the Boise City Airport Terminal for a new airline ticket counter. The new tenant will be located in the far West end of the Ticket Lobby. An exterior door vestibule is being modified to accommodate the new tenant. Work is to include a 1-hr occupancy separation, a new exterior exit door, exterior concrete slab, and millwork all per approved drawings and plan review conditions on file. Fire sprinkler heads shall be located in the area of work to comply with NFPA 13-1999 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent occupancy UNPAID FEE  8/15/2002 DONE
Perm. Occ. Cert. #9296 issued 8-15-02 to American Eagle Airlines.
Print Occupancy Form  8/14/2002 DONE
BLD-Final7/31/20027/31/20027/31/2002PPASS
DetailsJim Storey
duane marler ###-#### please call thought it had been finaled but activity show it as not. Duane would like to know is left. lhfina 7/31/2002 3:13:24 PM l ok. 7/31/2002 3:13:32 PM
FIRE-Final Inspection7/31/20027/31/20027/31/2002PPASS
DetailsRick Jackson
Permanent Occupancy 7/31/20027/31/2002 DONE
Details
Fee Review-notes3/11/20023/11/20027/31/2002 DONE
done
BLD-Final6/13/20026/14/20026/14/2002PNR
DetailsJim Storey
DUANE MARLER ###-#### CALL 1ST PLEASE
FIRE-Final Inspection6/13/20026/13/20026/13/2002PFAIL
DetailsRick Jackson
DUANE MARLER ###-#### CALL 1ST PLEASE fusible link near ceiling; penetrations; shutter not closing 6/13/2002 2:27:29 PM
   6/13/2002 DONE
DetailsAnnett Moore
Parcel Tag Notes: OKAY TO SEND OUT INSPECTIONS FOR ALL TRADES ON BLD00-03428. The following note pertains to plan modifications in process involving future work.
CCD 008 Plan Modification includes:
1. Space added:
a. 3,215 S.F. first floor
b. 4,161 S.F. second floor
c. 1,533 S.F. third floor
d. basement
2. Security checkpoint has been rearranged to increase number of check points.
3. Relocation of restrooms
4. Meeter/greeter lobby was added at the second floor adjacent to security checkpoint as a holding area for people waiting for passengers.
5. Rental car lobby at the first floor was expanded in the area
below the meeter/greeter lobby on the second floor.
6. A third floor mech. room was added to support the additional building area.
CCD 011 Plan Modification includes:
1. Modifications to current basement layout (under to accomodate airport storage needs & additional space needs for airport police force.
(any questions contact John Menard at ###-####)

(5-20-02) Please override this tag for all activities associated with permit BLD02-01037. CJW Reason for OverRide:
   6/13/2002 DONE
DetailsAnnett Moore
Parcel Tag Notes: OKAY TO SEND OUT INSPECTIONS FOR ALL TRADES ON BLD00-03428. The following note pertains to plan modifications in process involving future work.
CCD 008 Plan Modification includes:
1. Space added:
a. 3,215 S.F. first floor
b. 4,161 S.F. second floor
c. 1,533 S.F. third floor
d. basement
2. Security checkpoint has been rearranged to increase number of check points.
3. Relocation of restrooms
4. Meeter/greeter lobby was added at the second floor adjacent to security checkpoint as a holding area for people waiting for passengers.
5. Rental car lobby at the first floor was expanded in the area
below the meeter/greeter lobby on the second floor.
6. A third floor mech. room was added to support the additional building area.
CCD 011 Plan Modification includes:
1. Modifications to current basement layout (under to accomodate airport storage needs & additional space needs for airport police force.
(any questions contact John Menard at ###-####)

(5-20-02) Please override this tag for all activities associated with permit BLD02-01037. CJW Reason for OverRide:
BLD-Final6/3/20026/4/20026/4/2002ANR
DetailsJim Storey
DUANE ###-#### pending other insp. for final before bld final can be performed. 6/7/2002 5:26:03 PM
   6/3/2002 DONE
DetailsAnnett Moore
Parcel Tag Notes: OKAY TO SEND OUT INSPECTIONS FOR ALL TRADES ON BLD00-03428. The following note pertains to plan modifications in process involving future work.
CCD 008 Plan Modification includes:
1. Space added:
a. 3,215 S.F. first floor
b. 4,161 S.F. second floor
c. 1,533 S.F. third floor
d. basement
2. Security checkpoint has been rearranged to increase number of check points.
3. Relocation of restrooms
4. Meeter/greeter lobby was added at the second floor adjacent to security checkpoint as a holding area for people waiting for passengers.
5. Rental car lobby at the first floor was expanded in the area
below the meeter/greeter lobby on the second floor.
6. A third floor mech. room was added to support the additional building area.
CCD 011 Plan Modification includes:
1. Modifications to current basement layout (under to accomodate airport storage needs & additional space needs for airport police force.
(any questions contact John Menard at ###-####)

(5-20-02) Please override this tag for all activities associated with permit BLD02-01037. CJW Reason for OverRide:
BLD-Framing/Rough-in5/1/20025/1/20025/1/2002PPASS
DetailsJim Storey
1. (Listed electrical boxes in walls) Membrane penetrations for electrical outlet boxes of any material are permitted, provided that such boxes are tested for use in fire-resistive assemblies and installed in accordance with the tested assembly. (1997 UBC 709.7 Exception #1)putty pad one box/ ok to cover and vervy at final.
Override - Parcel Holds  5/1/2002 DONE
DetailsAnnett Moore
Parcel Tag Notes: OKAY TO SEND OUT INSPECTIONS FOR ALL TRADES ON BLD00-03428. The following note pertains to plan modifications in process involving future work.
CCD 008 Plan Modification includes:
1. Space added:
a. 3,215 S.F. first floor
b. 4,161 S.F. second floor
c. 1,533 S.F. third floor
d. basement
2. Security checkpoint has been rearranged to increase number of check points.
3. Relocation of restrooms
4. Meeter/greeter lobby was added at the second floor adjacent to security checkpoint as a holding area for people waiting for passengers.
5. Rental car lobby at the first floor was expanded in the area
below the meeter/greeter lobby on the second floor.
6. A third floor mech. room was added to support the additional building area.
CCD 011 Plan Modification includes:
1. Modifications to current basement layout (under to accomodate airport storage needs & additional space needs for airport police force.
(any questions contact John Menard at ###-####)
Reason for OverRide:
Telephone call  4/8/2002 DONE
CALLED LEFT V-MESSAGE PLANS READY 4-8-02 ///DLD
Override - Parcel Holds  4/8/2002  
Inspection Record Card- Bld  4/8/2002 DONE
Override - Parcel Holds  4/8/2002  
Issue & PRINT to be Invoiced  4/8/2002 DONE
Plan assigned to (CJW)3/15/2002 4/4/2002 PASS
DetailsCarl Westfall
4/4/2002 09:04:37 CJW - activity updated through activity BLDA022 from case BLD02-00494.
Routing - PLAN CHECK4/3/2002 4/4/2002 PASS
PLANS/APPL TAKEN TO FRONT DESK  4/4/2002 PASS
Routing - FIRE3/28/2002 4/3/2002 PASS
Routing - PLAN CHECK3/15/2002 3/28/2002 PASS
UBC plan review started March 28, 2002 and finished the same day. The drawings were approved with conditions. See the conditions list.
Plans ACCEPTED BY PLAN TECH  3/11/2002 DONE
Revised plans submitted 3/13/02, changed out with plans originally submitted.
1. Building code data not on front of plans.
Application received  3/11/2002  
Recd Pcfee & Taken To Pln CK  3/11/2002 DONE
JV entry will email Linda