Second Notice BLD | 4/14/2006 | 4/14/2006 | 4/17/2006 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | 3/29/2006 | 3/29/2006 | 4/14/2006 | | DONE |
Jim Sly
|
|
|
|
BLD-Final | 3/29/2006 | 3/29/2006 | 3/29/2006 | A | PASS |
Jim Sly
|
|
|
|
DOC - Permit Finaled | 3/29/2006 | 3/29/2006 | 3/29/2006 | P | PASS |
Jim Sly
|
|
|
Passed by T Acoraci, T Cobbley and C/C by Cathy W.
|
(F) Reprint permit | | | 8/22/2002 | | |
|
|
|
|
Letter of compliance | | | 8/12/2002 | | DONE |
|
|
|
Letter of Compliance #22560 issued 8-12-02.
|
BLD-Final | 8/7/2002 | 8/9/2002 | 8/9/2002 | A | PASS |
Tom Arcoraci
|
|
|
###-#### DAN ok for perm 8/9/2002 8:46:34 AM
|
FIRE-Final Inspection | 8/7/2002 | 8/8/2002 | 8/8/2002 | A | PASS |
Troy Cobbley
|
|
|
fire life/safety finaled 8/8/2002 2:51:07 PM
|
FIRE-Final Inspection | 8/2/2002 | 8/2/2002 | 8/2/2002 | A | FAIL |
Troy Cobbley
|
|
|
provide sign on fire riser door. Fire sprinkler permit finaled
|
BLD-Final | 7/17/2002 | 7/18/2002 | 7/18/2002 | P | NR |
Tom Arcoraci
|
|
|
DAN ; Phone #: ###-####
|
FIRE-Final Inspection | 7/18/2002 | 7/18/2002 | 7/18/2002 | A | PASS |
Troy Cobbley
|
|
|
Fire life/safety finaled. Fire alarm finaled. Fire sprinklers given temporary
|
BLD-Framing/Rough-in | 6/21/2002 | 6/24/2002 | 6/24/2002 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 06/21/2002 at 11:41:32. Contact: ###-####. grid ok 6/24/2002 9:09:32 AM
|
BLD-Framing/Rough-in | 5/9/2002 | 5/10/2002 | 5/10/2002 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 05/09/2002 at 09:40:52. Contact: ###-####. needs spec insp on welding walls ok to cover 5/10/2002 8:56:41 AM
|
Issue PAID IN FULL permit | | | 4/25/2002 | | |
|
|
|
|
Routing - PLAN CHECK | 4/18/2002 | | 4/23/2002 | | PASS |
|
|
|
Approved as noted and attached.
|
Plan assigned to (DRS) | 3/15/2002 | | 4/23/2002 | | PASS |
Dan Stuart
|
|
|
4/23/2002 14:38:47 DRS - activity updated through activity BLDA022 from case BLD02-00500.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/23/2002 | | PASS |
|
|
|
To permit desk for issue.
|
Inspection Record Card- Bld | | | 4/23/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/23/2002 | | DONE |
|
|
|
|
Telephone call | | | 4/23/2002 | | DONE |
|
|
|
CALLED LEFT V- MESSAGE JOHN PLANS READY 4-23-02 ///DLD
|
Plan resubmittals received | | | 4/22/2002 | | DONE |
|
|
|
Received two copies of revised sheets A2.0, A3.0, A4.0, A9.0 S1.0 & M2.1. Sheet M2.1 is not stamped or signed. Two copies of additional structural calculations/ metal bldg. information and one response letter. Routed to Dan S. KMM
|
Routing - FIRE | 4/11/2002 | | 4/18/2002 | | PASS |
|
|
|
|
Plan Review Completed(1st rev) | | | 4/18/2002 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 4/11/2002 | | FAIL |
|
|
|
Plan review corrections to architect.
|
Routing - PLAN CHECK | 3/20/2002 | | 4/11/2002 | | FAIL |
|
|
|
Corrections & clarifications required. Copy of corrections to architect. Routing to fire code analyst for review.
|
Routing - PLUMBING | 3/19/2002 | | 3/20/2002 | | PASS |
|
|
|
per plans and 2000 upc
|
Routing - PLANNING | 3/20/2002 | | 3/20/2002 | | PASS |
|
|
|
Sarah Schafer.
|
Routing - PUBLIC WORKS | 3/15/2002 | | 3/19/2002 | | PASS |
|
|
|
|
First Notice | 3/12/2002 | 3/12/2002 | 3/12/2002 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/12/2002 | | DONE |
|
|
|
|
Application received | | | 3/12/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/12/2002 | | DONE |
|
|
|
|