Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD02-00502
StatusFinaled
Name IDAHO ATHLETIC CLUB (E SIDE T.I.)
Site Address 2999 N LAKEHARBOR LN
Project NameIDAHO ATHLETIC CLUB-T.I.
Customer Number 
ePlanReviewNo
Description
(IDAHO ATHLETIC CLUB) Remodel to construct a new stairway, hallways, and two accessible restrooms on the east side of existing vacant portion of the Idaho Athletic Club building per approved plans on file. Work will occur on the first and second floor. Work to include structural modifications to install a new steel stairway with handrails and guardrails, new interior walls, new interior doors and windows, new suspended ceiling work, interior finish, glass block planter, fire sprinkler work, new plumbing, new mechanical, and new electrical work. This is a Scope of Work Permit. LETTER OF COMPLETION TO BE ISSUED WHEN DONE. Special Inspection required for structural welding and epoxy/adhesive bolt installations. NOTE: This building is fully fire sprinklered for one-hour substitution. (PC#0144-02) JCB
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  8/12/2010 DONE
BLD-Final3/31/20034/1/20034/1/2003APASS
DetailsTony Young
DOC - Permit Finaled4/1/20034/1/20034/1/2003PPASS
DetailsTony Young
Finaled by inspector at 4/1/2003 2:54:16 PM
BLD-Aging Inspection3/27/20033/27/20033/27/2003 DONE
DetailsTony Young
BLD-Final12/23/200212/26/200212/26/2002PCANC
DetailsTony Young
Brandon, ###-#### - Tony needs to do this one!!
BLD-Final12/23/200212/24/200212/24/2002AFAIL
DetailsCarl Dependahl
rescheduled..c/n ADA restroom, stair enclosure door wont latch at 2nd fl. 12/24/2002 10:06:29 AM
BLD-Final12/20/200212/23/200212/23/2002PNH
DetailsCarl Dependahl
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung...left msg, unable to contact, need plans. 12/24/2002 9:17:26 AM
BLD-Final12/17/200212/18/200212/18/2002AFAIL
DetailsTony Young
Scheduled by a contractor via Hello! on 12/17/2002 at 13:18:44. Contact: ###-####.
no plans on site 12/18/2002 12:14:52 PM
FIRE-Final Inspection12/16/200212/17/200212/17/2002PPASS
DetailsTroy Cobbley
life safety finaled 12/17/2002 1:10:46 PM
FIRE-Final Inspection12/10/200212/11/200212/11/2002PFAIL
DetailsTroy Cobbley
need to test the emergency lights in the west stair well. Contractor (nobody) was not on site 12/11/2002 1:41:11 PM
BLD-Final12/9/200212/9/200212/9/2002PNR
DetailsCarl Dependahl
Brandon, ###-#### - all others have signed off...Fire shows as issued; Troy may have done this all ready, but doesn't show onBLD...recall. 12/9/2002 4:12:27 PM
BLD-Framing/Rough-in9/19/20029/20/20029/20/2002APASS
DetailsTony Young
ceiling grid-brandon; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in8/28/20028/29/20028/29/2002APART
DetailsTony Young
epoxy \\###-####
needs special inspection, pending report 8/29/2002 10:29:06 AM
BLD-Framing/Rough-in8/28/20028/29/20028/29/2002PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 08/28/2002 at 15:15:24. Contact: ###-####.
ok to cover one side of int. walls untill trades sign off 8/29/2002 2:41:15 PM
Issue PAID IN FULL permit  6/25/2002 DONE
Plan assigned to (JCB)3/15/2002 4/24/2002 PASS
DetailsJason Blais
4/24/2002 10:09:17 JCB - activity updated through activity BLDA022 from case BLD02-00502.
Routing - PLAN CHECK4/23/2002 4/24/2002 PASS
Permit and plans approved and taken to front desk.
PLANS/APPL TAKEN TO FRONT DESK  4/24/2002 PASS
Inspection Record Card- Bld  4/24/2002 DONE
Telephone call  4/24/2002 DONE
permit ready
Routing - FIRE4/18/2002 4/23/2002 PASS
Plan Review Completed(1st rev)  4/23/2002 FAIL
Plan resubmittals received  4/22/2002 DONE
Received one copy of revised sheets S0.1 and S1.0. Routed to Jason B.
Routing - PLAN CHECK3/20/2002 4/18/2002 FAIL
Plan review report sent and faxed to architect and engineer. Plan resubmittals and response required for further review. Plans routed to Fire Dept. for review.
Plan resubmittals requested  4/18/2002  
Plan resubmittals and response required for further review.
Plan resubmittals received  4/18/2002 DONE
Received one copy of revised sheets S0.1 and S1.0, one copy of cover letter and two copies of revised calculations. Routed to Jason B. kmm
Routing - PLANNING3/19/2002 3/20/2002 PASS
Approved.
Routing - PUBLIC WORKS3/15/2002 3/19/2002 PASS
Additional plans submitted  3/13/2002 DONE
Received two sets of structural calculations. Attached to plans.
First Notice3/12/20023/12/20023/12/2002 DONE
Plans ACCEPTED BY PLAN TECH  3/12/2002 DONE
Application received  3/12/2002  
Recd Pcfee & Taken To Pln CK  3/12/2002