Permit Information
Permit NumberBLD02-00516
StatusFinaled
Name CHRIS SABALA
Site Address 317 -319 S RUBY ST
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 2206 sq. ft. DUPLEX. Each unit to be a three bedroom, two bathroom 1103 sq. ft. with a 40 foot deep by 33 feet wide parking pad per Angie Brosious with Planning and Zoning. Per approved plans and requirement list. THIS STRUCTURE IS BEING BUILD TO ONLY MEET DUPLEX STANDARD AND NOT TO BE SOLD AS INDIVIDUAL UNITS. PC#123 (SAM)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/8/20027/9/20027/9/2002APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 07/08/2002 at 19:11:15. Contact: ###-####.
DOC - Permit Finaled7/9/20027/9/20027/9/2002PPASS
DetailsJim Storey
Finaled by inspector at 7/9/2002 5:00:53 PM
BLD-Final7/4/20027/5/20027/5/2002AFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 07/04/2002 at 15:39:40. Contact: ###-####.insulate supply/ access to 319/ need approved plan. 7/5/2002 9:51:01 AM
BLD-Energy code compliance5/16/20025/16/20025/16/2002APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 05/16/2002 at 07:26:57. Contact: ###-####.j sly draft stop ok per c/n on framing/insulation ok for cover. 5/16/2002 5:08:12 PM
BLD-Framing/Rough-in5/14/20025/15/20025/15/2002AFAIL
DetailsJim Sly
Scheduled by a contractor via Hello! on 05/14/2002 at 20:10:23. Contact: ###-####. C/N... On site. 5/15/2002 12:55:30 PM
BLD-Framing/Rough-in4/26/20024/26/20024/26/2002PDONE
DetailsSteven Webb
SHEER ###-#### CHRIS
BLD-Framing/Rough-in4/26/20024/26/20024/26/2002PPASS
DetailsSteven Webb
SHEER ###-#### CHRIS
BLD-Foundation4/9/20024/10/20024/10/2002APART
DetailsJim Storey
###-#### roy pwoi. 4/10/2002 11:41:32 AM
BLD-Footing4/4/20024/5/20024/5/2002APART
DetailsJim Storey
###-#### wip ft 4/5/2002 10:37:16 AM
BLD-Footing4/4/20024/5/20024/5/2002PFAIL
DetailsJim Sly
Scheduled by a contractor via Hello! on 04/04/2002 at 19:16:21. Contact: ###-####. C/N.....Poured W/O insp. Call for wall insp. Do not pour until insp approval Need approved plans. 4/5/2002 3:24:49 PM
Issue PAID IN FULL permit  3/27/2002 DONE
Pending Assignment by DJO3/13/2002 3/22/2002 DONE
DetailsDan Overy
3/22/2002 09:29:11 SAM - activity updated through activity BLDA183 from case BLD02-00516.
Routing - PLAN CHECK3/18/2002 3/22/2002 DONE
Plan assigned to (SAM)3/22/2002 3/22/2002 PASS
DetailsSteve Munroe
3/22/2002 11:03:37 SAM - activity updated through activity BLDA022 from case BLD02-00516.
Case Summary (BLD)  3/22/2002  
Plan Review Report  3/22/2002  
PLANS/APPL TAKEN TO FRONT DESK  3/22/2002 DONE
Inspection Record Card- Bld  3/22/2002 DONE
Print Occupancy Form  3/22/2002 DONE
Routing - PLANNING3/13/2002 3/18/2002 PASS
Parking as redlined. Pad must be minimum 33 ft. wide by 40 ft. deep.
Routing - PUBLIC WORKS3/18/2002 3/18/2002 PASS
Application received  3/13/2002