Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD02-00532
StatusFinaled
Name TOM MCLEOD
Site Address 3566 N HYACINTH LN
Project Name 
Customer Number 
ePlanReviewNo
Description
UNIT TYPE "B" To construct a three bedroom, two and half bathroom 2100 sq. ft. two story townhouse (1141 sq. ft. first floor/959 sq. ft. second floor) with a attached 462 sq. ft. two car garage, a 93 sq. ft. covered back porch and a 105 sq. ft. covered front porch. Per approved plans, engineering and requirement list. PC#134 (SAM) THESE PLANS NEED TO BE REDRAWN TO SCALE AND WITH ALL ENGINEERING AND RED-LINING INCORPORATED BEFORE RESUBMITTING FOR A NEW PERMIT.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  10/22/2004  
BLD-Conference12/13/200212/13/200212/13/2002PPASS
DetailsTony Young
l c issued 12/13/2002 4:20:34 PM
DOC - Permit Finaled12/13/200212/13/200212/13/2002PPASS
DetailsTony Young
Finaled by inspector at 12/13/2002 4:20:06 PM
BLD-Final11/18/200211/19/200211/19/2002PNR
DetailsTony Young
###-####
need trades 1st 11/19/2002 4:23:12 PM
BLD-Final11/15/200211/18/200211/18/2002PPART
DetailsTony Young
###-####
conf. only on final, need trades 1st 11/18/2002 2:43:13 PM
BLD-Final11/8/200211/8/200211/8/2002PFAIL
DetailsTony Young
mike; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
no inspection, need plumbing and mechanicalx 2 , 1st 11/8/2002 2:31:31 PM
BLD-Framing/Rough-in7/22/20027/22/20027/22/2002PPASS
DetailsTony Young
MIKE; Phone #: ###-####
ok on insulation also 7/22/2002 3:38:31 PM
BLD-Framing/Rough-in7/17/20027/18/20027/18/2002APART
DetailsTony Young
MIKE; Phone #: ###-####
c/n posted 7/18/2002 12:37:09 PM
BLD-Conference7/5/20027/5/20027/5/2002PPART
DetailsTony Young
roof vents ?? property line
none on roof w/in 5 ft 7/10/2002 12:50:11 PM
BLD-Conference6/27/20026/28/20026/28/2002APASS
DetailsTony Young
rim 1 hr wall ok 6/28/2002 10:52:17 AM
BLD-Conference6/27/20026/27/20026/27/2002PCANC
DetailsTony Young
conf- mike- ###-####
BLD-Conference6/20/20026/21/20026/21/2002APART
DetailsTony Young
MIKE ###-####
conf. on f/p framing and property line 1 hr wall framing 6/21/2002 10:33:36 AM
BLD-Conference6/10/20026/11/20026/11/2002ACANC
DetailsTony Young
BLD-Conference6/7/20026/10/20026/10/2002PPART
DetailsTony Young
for conf mike- ###-####
a-35s ok to cover on shear walls 6/10/2002 5:16:52 PM
BLD-Conference6/5/20026/6/20026/6/2002APART
DetailsTony Young
###-#### MIKE
nailing on plate, straps 6/6/2002 10:37:09 AM
BLD-Conference5/31/20026/3/20026/3/2002ACANC
DetailsRuss Owen
MIKE ###-####
BLD-Conference5/29/20025/30/20025/30/2002APART
DetailsTony Young
mike- ###-####
firewall issues 5/30/2002 1:41:17 PM
BLD-Other5/30/20025/30/20025/30/2002PPART
DetailsTony Young
main floor firewall ok to stand 5/30/2002 4:05:02 PM
BLD-Conference5/22/20025/23/20025/23/2002AFAIL
DetailsTony Young
cont. wanted to use a non tested fire caulking, we will not accept as it is not listed for that use 5/23/2002 12:05:03 PM
BLD-Conference5/21/20025/22/20025/22/2002PCANC
DetailsTony Young
MIKE ###-####
BLD-Foundation5/13/20025/14/20025/14/2002APART
DetailsTony Young
###-#### MIKE
patio cololm ftg 5/14/2002 11:44:33 AM
BLD-Foundation5/10/20025/10/20025/10/2002PPART
DetailsTony Young
MIKE ###-####
BLD-Conference5/10/20025/10/20025/10/2002PPART
DetailsTony Young
ground rod
BLD-Footing5/7/20025/8/20025/8/2002PPART
DetailsTony Young
TODD ###-####
wip 5/8/2002 1:01:16 PM
BLD-Footing5/7/20025/8/20025/8/2002ANR
DetailsTony Young
TODD ###-####
BLD-Conference5/8/20025/8/20025/8/2002APART
DetailsTony Young
Added by Inspector: 415 On 5/8/2002 10:39:21 AM soil compaction report ok, had to renove soil and bring in compacted fill due to unstable soil
BLD-Foundation5/1/20025/1/20025/1/2002PNR
DetailsTony Young
###-#### MIKE
Issue PAID IN FULL permit  4/30/2002 DONE
Inspection Record Card- Bld  4/26/2002 DONE
Routing - PLAN CHECK3/19/2002 4/25/2002 DONE
Plan assigned to (SAM)3/26/2002 4/25/2002 PASS
DetailsSteve Munroe
4/25/2002 16:15:54 SAM - activity updated through activity BLDA022 from case BLD02-00532.
Case Summary (BLD)  4/25/2002  
Plan Review Report  4/25/2002  
PLANS/APPL TAKEN TO FRONT DESK  4/25/2002 DONE
Pending Assignment by DJO3/14/2002 3/26/2002 DONE
DetailsDan Overy
3/26/2002 09:25:49 SAM - activity updated through activity BLDA183 from case BLD02-00532.
Plan Reviewer's activity  3/25/2002 PEND
3/25/02 16:15 I talked to Tom Mcleod. He will come in at 11:00 on 3/26/02 to meet with me regarding this project. Plans have dimension, engineering and code problems.
Routing - PLANNING3/14/20023/18/20023/19/2002 PASS
Approved as per CUP00-00006.
Routing - PUBLIC WORKS3/19/2002 3/19/2002 PASS
Application received  3/14/2002