Case Summary (BLD) | | | 8/17/2010 | | DONE |
|
|
|
|
BLD-Aging Inspection | 2/24/2004 | 2/24/2004 | 2/24/2004 | | DONE |
Dave Hannah
|
|
|
|
DOC - Permit Expired | 2/24/2004 | 2/24/2004 | 2/24/2004 | A | PASS |
Dave Hannah
|
|
|
Expired by inspector at 2/24/2004 10:36:14 AM
|
BLD-Aging Inspection | 8/11/2003 | 8/11/2003 | 8/11/2003 | | PASS |
Carl Dependahl
|
|
|
WIP... 8/11/2003 12:33:21 PM
|
BLD-Aging Inspection | 8/11/2003 | 8/11/2003 | 8/11/2003 | | PASS |
Carl Dependahl
|
|
|
WIP 8/11/2003 8:00:32 AM
|
BLD-Framing/Rough-in | 4/3/2003 | 4/4/2003 | 4/4/2003 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 4/3/2003 at 4:08:09 PM. ...complete air seal ok to insulate 4/4/2003 1:47:46 PM
|
BLD-Framing/Rough-in | 4/4/2003 | 4/4/2003 | 4/4/2003 | P | PART |
Carl Dependahl
|
|
|
ok to cover at rear stair...show 2 layer drywall install at lid; complete fire blocks throughout, WIP 4/4/2003 4:51:30 PM
|
BLD-Foundation | 1/30/2003 | 1/30/2003 | 1/30/2003 | P | PART |
Carl Dependahl
|
|
|
DAVE; Phone #: ###-#### Internet Inspection Request from: Darla Downs, stairwell wall at rear ok 1/30/2003 3:17:56 PM
|
BLD-Footing | 1/28/2003 | 1/28/2003 | 1/28/2003 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 01/28/2003 at 06:53:30. Contact: ###-####...rear stairwell ftgs ok. 1/28/2003 11:38:15 AM
|
BLD-Conference | 1/23/2003 | 1/24/2003 | 1/24/2003 | A | CANC |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 01/23/2003 at 16:46:51. Contact: .
|
BLD-Conference | 1/24/2003 | 1/24/2003 | 1/24/2003 | P | PASS |
Carl Dependahl
|
|
|
consult hvac insp re ladder to roof req's 1/24/2003 3:19:16 PM
|
BLD-Framing/Rough-in | 1/24/2003 | 1/24/2003 | 1/24/2003 | P | PART |
Carl Dependahl
|
|
|
need spec insp reports for welded frame, complete fireblocking & other insps 1/24/2003 3:21:56 PM
|
BLD-Conference | 9/30/2002 | 10/1/2002 | 10/1/2002 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 09/30/2002 at 12:40:42. Contact: .
|
BLD-Conference | 9/27/2002 | 9/27/2002 | 9/27/2002 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 09/27/2002 at 10:54:22. Contact: .need verify roof diaphragm 9/27/2002 3:52:13 PM
|
BLD-Concrete | 9/27/2002 | 9/27/2002 | 9/27/2002 | P | PART |
Carl Dependahl
|
|
|
moment frame ftg ok
|
BLD-Conference | 9/23/2002 | 9/24/2002 | 9/24/2002 | P | PASS |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 09/23/2002 at 11:02:09. Contact: .w/ bldr re spec insp reqs....int ftgs for beam ok, need moment frame. 9/24/2002 4:28:39 PM
|
Issue & PRINT permit | | | 6/20/2002 | | DONE |
|
|
|
|
Telephone call | | | 4/15/2002 | | DONE |
|
|
|
###-####
|
Plan assigned to (CJW) | 3/21/2002 | | 4/12/2002 | | PASS |
Carl Westfall
|
|
|
4/12/2002 14:05:10 CJW - activity updated through activity BLDA022 from case BLD02-00542.
|
Routing - FIRE | 4/4/2002 | | 4/12/2002 | | PASS |
Bill Alexander
|
|
|
|
Plan Review Completed(1st rev) | | | 4/12/2002 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 4/12/2002 | | 4/12/2002 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/12/2002 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 4/12/2002 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/21/2002 | | 4/4/2002 | | PASS |
|
|
|
UBC plan review started April 1, 2002 and finished April 4, 2002. The drawings were approved with conditions. See the conditions list. A copy of the plan review report was sent to the architect.
|
Routing - PUBLIC WORKS | 3/21/2002 | | 3/21/2002 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/15/2002 | | PASS |
|
|
|
|
Application received | | | 3/14/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/14/2002 | | DONE |
|
|
|
|
Fee Review-notes | 3/14/2002 | 3/14/2002 | | | |
|
|
|
|