Permit Information
Permit NumberBLD02-00554
StatusExpired
Name R F CONSTRUCTION
Site Address 3221 -3223 N WILDWOOD LN
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 2644 sq. ft. two story DUPLEX. Each unit is a three bedroom, two and quarter bathroom 1322 sq. ft. (594 sq. ft. first floor/728 sq. ft. second floor) with a attached 438 sq. ft. two car garage and a 42 sq. ft. deck off the second story master bedroom. Per approved plans, engineering and requirement list. CUP01-20 per Susan Riggs with Planning and Zoning. THE CONSTRUCTION OF THE DWELLING UNIT SEPARATION WALL IS DESIGNED TO MEET TOWNHOUSE CONSTRUCTION. NOTE: conversion permits and either a recorded subdivision or a zoning certificate and recorded record of survey must be completed prior to selling as individual units. PC#138 (SAM)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/21/20031/21/20031/21/2003PNR
DetailsTom Arcoraci
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
BLD-Final1/17/20031/17/20031/17/2003PFAIL
DetailsJim Sly
elliot--for 3221 wildwood; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie nr 1/17/2003 2:56:07 PM
BLD-Framing/Rough-in9/18/20029/19/20029/19/2002APASS
DetailsDave Hannah
ELLIOT; Phone #: ###-#### Internet Inspection Request from: Annette Moore insulation ok framing c/n done ok to cover 9/19/2002 11:40:03 AM
BLD-Framing/Rough-in9/18/20029/18/20029/18/2002PPASS
DetailsJim Sly
Energy OK.

BLD-Framing/Rough-in9/17/20029/18/20029/18/2002AFAIL
DetailsJim Sly
NR 9/18/2002 11:45:33 AM
BLD-Framing/Rough-in9/17/20029/17/20029/17/2002PFAIL
DetailsDave Hannah
elliott--; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie c/n itrms not complete 9/17/2002 1:21:12 PM
BLD-Framing/Rough-in9/11/20029/12/20029/12/2002AFAIL
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung c/n on site ok to insulate 9/12/2002 12:08:26 PM
BLD-Framing/Rough-in8/16/20028/16/20028/16/2002PPART
DetailsDave Hannah
shear wall ok to cover ext wall all but for back walls ok after engin ok 8/19/2002 11:53:23 AM
BLD-Framing/Rough-in8/15/20028/15/20028/15/2002PFAIL
DetailsDave Hannah
867-*0707 c/n on site needs engineer to evaluate shear panels back wall restaple ares on panels 8/15/2002 5:19:03 PM
BLD-Framing/Rough-in7/30/20027/30/20027/30/2002APART
DetailsDave Hannah
1hr fire walls 1st and second floors ok to set
BLD-Framing/Rough-in7/29/20027/29/20027/29/2002PPART
DetailsRuss Owen
clint; Phone #: ###-####2nd floor. 7/29/2002 3:47:26 PM
BLD-Framing/Rough-in7/19/20027/22/20027/22/2002APART
DetailsJim Sly
separation wall -clint ###-#### (2) 1hr walls OK. 7/22/2002 11:21:15 PM
BLD-Framing/Rough-in7/18/20027/19/20027/19/2002PCANC
DetailsDave Hannah
separation wall clint ###-####--per clint cancel re-schedule
BLD-Foundation7/9/20027/10/20027/10/2002ACANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 07/09/2002 at 08:12:51. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 07/10/2002 at 07:15:02.
BLD-Foundation7/10/20027/10/20027/10/2002PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 07/10/2002 at 07:16:06. Contact: ###-####.rebar in forms about 80% complete 7/10/2002 2:52:04 PM
BLD-Footing7/9/20027/9/20027/9/2002PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 07/09/2002 at 08:12:13. Contact: ###-####. work in progress setbacks ok 7/9/2002 12:59:59 PM
Issue PAID IN FULL permit  6/20/2002 DONE
Telephone call  6/6/2002 DONE
left mess that permit is ready
Inspection Record Card- Bld  5/22/2002 DONE
PLANS/APPL TAKEN TO FRONT DESK  4/18/2002 DONE
Pending Assignment by DJO3/15/2002 4/18/2002 DONE
DetailsDan Overy
Plan Review Report  4/9/2002  
Plan Reviewer's activity  4/9/2002 PEND
4/9/02 14:00 I talked with Elliott. He is going to get me the engineering for the girder in the garage. He also said the stair wall can / will be 2 x 6.

4/18/02 9:34 I talked to Elliott and just reminded him that I'm waiting for the girder truss engineering.
Routing - PLAN CHECK3/21/2002 4/9/2002 DONE
Plan Reviewer's activity  4/5/2002 PEND
4/5/02 13:50 I called and left a message on Elliott's phone. I let him know that I need engineering from the truss company on the girder in the garage and to know if he can make the wall between the two unit a 2 x 6 wall. I also let him know I will be calling the engineer to ask him some questions.
Routing - PLANNING3/20/2002 4/3/2002 PASS
Routing - PUBLIC WORKS3/20/2002 3/21/2002 PASS
Application received  3/15/2002