BLD-Final | 1/21/2003 | 1/21/2003 | 1/21/2003 | P | NR |
Tom Arcoraci
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
|
Case Summary (BLD) | | | 1/21/2003 | | |
|
|
|
|
BLD-Final | 1/17/2003 | 1/17/2003 | 1/17/2003 | P | FAIL |
Jim Sly
|
|
|
elliot--for 3245 wildwood; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie nr 1/17/2003 2:56:25 PM
|
BLD-Framing/Rough-in | 9/18/2002 | 9/19/2002 | 9/19/2002 | A | PASS |
Dave Hannah
|
|
|
ELLIOT; Phone #: ###-#### Internet Inspection Request from: Annette Moore insulation ok framing c/n done ok to cover 9/19/2002 11:40:28 AM
|
BLD-Framing/Rough-in | 9/17/2002 | 9/18/2002 | 9/18/2002 | A | FAIL |
Jim Sly
|
|
|
###-#### NR 9/18/2002 11:45:52 AM
|
BLD-Framing/Rough-in | 9/12/2002 | 9/12/2002 | 9/12/2002 | P | FAIL |
Dave Hannah
|
|
|
c/n on site ok to insulate
|
BLD-Framing/Rough-in | 8/16/2002 | 8/16/2002 | 8/16/2002 | P | PART |
Dave Hannah
|
|
|
###-#### shear walls ok to cover ext walls all but 8/19/2002 11:53:55 AM for back wall ok to cover after engin ok 8/19/2002 11:54:18 AM
|
BLD-Framing/Rough-in | 8/15/2002 | 8/15/2002 | 8/15/2002 | P | FAIL |
Dave Hannah
|
|
|
###-#### need eng to evaluate shear panels and staple per plan c/n on site same as 3221 and 3261 8/15/2002 5:17:56 PM
|
BLD-Framing/Rough-in | 7/29/2002 | 7/30/2002 | 7/30/2002 | A | PART |
Dave Hannah
|
|
|
clint; Phone #: ###-#### 1hr fire wall second floor ok 7/30/2002 9:10:17 AM
|
BLD-Framing/Rough-in | 7/22/2002 | 7/23/2002 | 7/23/2002 | A | PART |
Jim Sly
|
|
|
###-#### (2) 1hr walls (1st floor) OK. 7/24/2002 2:17:59 AM
|
BLD-Foundation | 7/9/2002 | 7/9/2002 | 7/9/2002 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 07/09/2002 at 08:11:12. Contact: ###-####.everything but holddowns are complete 7/9/2002 1:00:51 PM
|
BLD-Footing | 7/8/2002 | 7/8/2002 | 7/8/2002 | P | PART |
Dave Hannah
|
|
|
ft bill ###-#### work in progress setbacs ok 7/8/2002 11:33:24 AM
|
Issue PAID IN FULL permit | | | 6/20/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/21/2002 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/18/2002 | | DONE |
|
|
|
|
Pending Assignment by DJO | 3/15/2002 | | 4/18/2002 | | DONE |
Dan Overy
|
|
|
|
Routing - PLAN CHECK | 3/21/2002 | | 4/9/2002 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 4/9/2002 | | |
|
|
|
|
Plan Reviewer's activity | | | 4/9/2002 | | PEND |
|
|
|
4/9/02 14:00 I talked with Elliott. He is going to get me the engineering for the girder in the garage. He also said the stair wall can / will be 2 x 6.
|
Plan Reviewer's activity | | | 4/5/2002 | | PEND |
|
|
|
4/5/02 13:50 I called and left a message on Elliott's phone. I let him know that I need engineering from the truss company on the girder in the garage and to know if he can make the wall between the two units a 2 x 6 wall. I also let him know I will be calling the engineer to ask him some questions.
|
Routing - PLANNING | 3/15/2002 | | 4/3/2002 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 3/20/2002 | | 3/21/2002 | | PASS |
|
|
|
|
Application received | | | 3/15/2002 | | |
|
|
|
|