Case Summary (BLD) | | | 2/27/2009 | | |
|
|
|
|
BLD-Aging Inspection | 2/18/2004 | 2/18/2004 | 2/18/2004 | | CANC |
Tom Arcoraci
|
|
|
|
DOC - Permit Expired | 2/18/2004 | 2/18/2004 | 2/18/2004 | A | PASS |
Tom Arcoraci
|
|
|
Expired by inspector at 2/18/2004 9:17:57 AM
|
BLD-Aging Inspection | 12/19/2003 | 12/19/2003 | 12/19/2003 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 10/7/2003 | 10/7/2003 | 10/7/2003 | | PASS |
Tom Arcoraci
|
|
|
wip 10/7/2003 8:22:50 AM
|
BLD-Aging Inspection | 8/5/2003 | 8/5/2003 | 8/5/2003 | | PART |
Tom Arcoraci
|
|
|
ok for perm 8/5/2003 3:54:15 PM
|
Fee Review-notes | 3/15/2002 | 3/15/2002 | 5/5/2003 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 1/7/2003 | | DONE |
|
|
|
|
BLD-Final | 11/4/2002 | 11/5/2002 | 11/5/2002 | A | PASS |
Tom Arcoraci
|
|
|
KAY; Phone #: ###-#### Internet Inspection Request from: Darla Downs ok for perm 11/5/2002 10:05:15 AM
|
PubWorks Occupancy Approval | 11/5/2002 | 11/5/2002 | 11/5/2002 | | DONE |
|
|
|
Drainage project complete, signed permanent occupancy 11/5/02. R.Rokovitz
|
Permanent Occupancy | | 11/5/2002 | 11/5/2002 | | DONE |
|
|
|
|
Code Occupancy Approval | 11/4/2002 | 11/4/2002 | 11/4/2002 | P | PASS |
Scott M.Brown
|
|
|
ALL IN AS REQUIRED FINAL SIGNED OFF. 11/4/2002 3:19:55 PM
|
BLD-Final | 8/15/2002 | 8/16/2002 | 8/16/2002 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 08/15/2002 at 15:50:03. Contact: ###-####. EARLY AM ok for temp occ 8/16/2002 8:24:20 AM
|
Temporary occupancy | | | 8/16/2002 | | DONE |
|
|
|
Temp. Occ. Cert. #4848 issued 8-16-02 to Intermountain Hospital.
|
BLD-Final | 8/14/2002 | 8/15/2002 | 8/15/2002 | P | FAIL |
Tom Arcoraci
|
|
|
###-#### late am need letter from state to feild installtion of state seal 8/15/2002 3:04:27 PM
|
FIRE-Final Inspection | 8/15/2002 | 8/15/2002 | 8/15/2002 | P | PASS |
Troy Cobbley
|
|
|
fire life safety finaled 8/15/2002 1:48:31 PM
|
FIRE-Final Inspection | 8/13/2002 | 8/14/2002 | 8/14/2002 | A | CANC |
Troy Cobbley
|
|
|
cancelled per contractors request. Can not test the duct detectors due to wrong gas valves installed 8/14/2002 10:14:43 AM
|
FIRE-Supply Line Flush | 8/8/2002 | 8/8/2002 | 8/8/2002 | P | PASS |
Troy Cobbley
|
|
|
This inspection done under FIR02-00061 8/8/2002 3:41:47 PM
|
FIRE-Supply Line Hydro | 8/2/2002 | 8/2/2002 | 8/2/2002 | P | PASS |
Troy Cobbley
|
|
|
underground hydro test OK 8/2/2002 1:31:05 PM
|
BLD-Conference | 8/1/2002 | 8/1/2002 | 8/1/2002 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 7/17/2002 | 7/18/2002 | 7/18/2002 | A | PASS |
Tom Arcoraci
|
|
|
KAY HOWARD; Phone #: ###-####
|
FIRE-Sprinkler Rough-in | 7/16/2002 | 7/17/2002 | 7/17/2002 | A | CANC |
Troy Cobbley
|
|
|
This inspection done under FIR02-00061 7/17/2002 9:56:11 AM
|
BLD-Foundation | 7/10/2002 | 7/10/2002 | 7/10/2002 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 07/10/2002 at 06:24:41. Contact: ###-####.walls. 7/10/2002 2:56:07 PM
|
BLD-Footing | 7/8/2002 | 7/8/2002 | 7/8/2002 | P | PASS |
Jim Storey
|
|
|
VERNE ###-####ft and rebar ok 7/8/2002 3:37:30 PM
|
BLD-Footing | 6/28/2002 | 6/28/2002 | 6/28/2002 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 06/28/2002 at 06:40:54. Contact: ###-####.south 3r int. 6/28/2002 11:35:55 AM
|
BLD-Footing | 6/26/2002 | 6/26/2002 | 6/26/2002 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 06/26/2002 at 06:32:22. Contact: ###-####. int fts ok 6/26/2002 2:16:01 PM
|
BLD-Footing | 6/24/2002 | 6/24/2002 | 6/24/2002 | A | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 06/24/2002 at 06:38:43. Contact: ###-####.
|
BLD-Foundation | 6/24/2002 | 6/24/2002 | 6/24/2002 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 06/24/2002 at 11:09:17. Contact: ###-####. east 1/3rd only. 6/24/2002 4:53:02 PM
|
Print Occupancy Form | | | 6/24/2002 | | |
|
|
|
|
BLD-Foundation | 6/20/2002 | 6/21/2002 | 6/21/2002 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 06/20/2002 at 15:25:42. Contact: ###-####.
|
BLD-Footing | 6/17/2002 | 6/18/2002 | 6/18/2002 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 06/17/2002 at 16:41:27. Contact: ###-####. ext fts ok 6/18/2002 2:25:15 PM
|
BLD-Other | 6/13/2002 | 6/13/2002 | 6/13/2002 | P | CANC |
Tom Arcoraci
|
|
|
DAVE ###-#### THIS IS FOR THE STORM DRAIN needs public works 6/13/2002 2:49:54 PM
|
(F) Reprint permit | | | 6/6/2002 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 6/5/2002 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/31/2002 | | 6/4/2002 | | CANC |
|
|
|
Per state approved plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/4/2002 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 6/4/2002 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 6/4/2002 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 6/4/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/4/2002 | | |
|
|
|
|
Plan assigned to (M_P) | 4/9/2002 | | 6/4/2002 | | PASS |
Mike Phillips
|
|
|
6/4/2002 08:57:08 M_P - activity updated through activity BLDA022 from case BLD02-00567.
|
Routing - PLAN CHECK | 5/31/2002 | | 5/31/2002 | | FAIL |
|
|
|
Need additional informaiton to be submitted. Talked to Joh Price and discussed what was needed.
|
Plan resubmittals received | | | 5/22/2002 | | DONE |
|
|
|
Received two sets of resubmittal sheets A1.1, A1.2, A4.0, "SHEET 1 OF 2", "SHEET 2 OF 2", F1, with cover letter and responses. Routed to Mike Phillips
|
Routing - PLAN CHECK | 4/18/2002 | | 5/22/2002 | | |
|
|
|
Routed to Planning.
|
Plan Review Completed(1st rev) | | | 4/18/2002 | | FAIL |
|
|
|
|
Routing - FIRE | 4/11/2002 | | 4/18/2002 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 4/9/2002 | | 4/11/2002 | | FAIL |
|
|
|
Plan Review completed, sent correction notice to Kay Howard and Dean Briggs. Additional information required for further review.
|
Print Pending Permit.LaserJet4 | | | 4/11/2002 | | |
|
|
|
|
Pending Assignment by JCM | 3/18/2002 | | 4/9/2002 | | DONE |
John Menard
|
|
|
4/9/2002 08:53:39 JCM - activity updated through activity BLDA170 from case BLD02-00567.
|
Routing - PLANNING | 3/28/2002 | | 4/8/2002 | | PEND |
|
|
|
PENDING DR REIVEW
|
Plan resubmittals received | | | 4/5/2002 | | DONE |
|
|
|
Received two sets of resubmittal sheets A1.0, A1.1, A1.2 with State of Idaho Building Permit Application, State Of Idaho Envelope compliance report, Letter to Ray Hoy/State Electrical Plans Examiner, Design Calculations, and Drawings. Cover letter from Briggs Engineering also submitted. Routed to John Menard.
|
Routing - PUBLIC WORKS | 3/25/2002 | | 3/28/2002 | | PASS |
|
|
|
|
Telephone call | | | 3/25/2002 | | DONE |
|
|
|
|
Routing - PLANNING Land Div | 3/25/2002 | | 3/25/2002 | | PASS |
|
|
|
Land division ok. Routed to Public Works. (blc)
|
Routing - PLAN CHECK | 3/18/2002 | | 3/25/2002 | | |
|
|
|
|
Additional plans submitted | | | 3/22/2002 | | DONE |
|
|
|
Received fax copy of information from United Water. Attached to plans.
|
Plans ACCEPTED BY PLAN TECH | | | 3/18/2002 | | DONE |
|
|
|
1. Plans from US Modular not stamped/signed. However plans from Architect are stamped and signed.
|
Application received | | | 3/18/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/15/2002 | | DONE |
|
|
|
|
Routing - PLANNING | 5/22/2002 | | | | |
|
|
|
Gave to Marty Santoyo
|