Permit Information
Permit NumberBLD02-00568
StatusExpired
Name INTERMOUNTAIN HOSPITAL
Site Address 303 N ALLUMBAUGH ST
Project NameINTERMOUTAIN HOSPITAL
Customer Number 
ePlanReviewNo
Description
***INTERMOUNTAIN HOSPITAL ***To place a four unit Modular Building, totaling 2,905 s.f. office area for medical treatment on the Intermountain Hospital campus. This permit includes the covered entry canopy, foundation piers, tie downs, ramp, stairs, skirting, new concrete sidewalks, and electrical. All per approved plans. Buildings are permitted under the State of Idaho with Tag 8959FB and Plan Approval #PA 11794FB. NOTE: The State of Idaho must issue a Certificate of Occupancy, prior to the City of Boise making their final inspection and issuing a Letter of Completion. NOTE: Entry canopies between the units are being considered as pederstian walkways. DRH01-00158 MGS PC#157-02 MJP
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  2/27/2009  
BLD-Aging Inspection3/1/20043/1/20043/1/2004 CANC
DetailsTom Arcoraci
DOC - Permit Expired3/1/20043/1/20043/1/2004APASS
DetailsTom Arcoraci
Expired by inspector at 3/1/2004 9:34:38 AM
BLD-Aging Inspection12/29/200312/29/200312/29/2003 NR
DetailsTom Arcoraci
BLD-Aging Inspection10/7/200310/7/200310/7/2003 PASS
DetailsTom Arcoraci
wip 10/7/2003 8:22:43 AM
BLD-Aging Inspection8/6/20038/6/20038/6/2003 PASS
DetailsTom Arcoraci
ok for perm 8/6/2003 8:34:20 AM
Case Summary (BLD)  1/7/2003  
BLD-Final11/4/200211/5/200211/5/2002APASS
DetailsTom Arcoraci
KAY; Phone #: ###-#### Internet Inspection Request from: Darla Downs ok for perm 11/5/2002 10:05:24 AM
Permanent Occupancy 11/5/200211/5/2002 DONE
Details
Code Occupancy Approval11/4/200211/4/200211/4/2002PPASS
DetailsScott M.Brown
ALL INAS REQUIRED FINAL SIGNED OFF 11/4/2002 3:19:17 PM
Telephone call  10/29/2002 DONE
Talked w/Kay re: status of temp. occ. & they should be finished this week.
BLD-Final8/26/20028/27/20028/27/2002APASS
DetailsTom Arcoraci
###-#### late am ok for temp 8/27/2002 10:55:27 AM
Temporary occupancy  8/27/2002 DONE
Temp. Occ. Cert. #4853 issued 8-27-02 to the Intermountain Hospital (modular bldg.).
Code Occupancy Approval Temp8/27/20028/27/20028/26/2002ADONE
DetailsScott M.Brown
WE HAVE LANDSCAPE BOND IN PLACE SO SIGNED TEMP FOR THIS BUILDING. 8/27/2002 9:38:08 AM
FIRE-Final Inspection8/22/20028/26/20028/26/2002APASS
DetailsTroy Cobbley
Fire life/safety finaled 8/26/2002 11:11:26 AM
BLD-Framing/Rough-in7/22/20027/23/20027/23/2002APART
DetailsTom Arcoraci
kay; Phone #: ###-#### BAND AT SILL PLATE OK 7/23/2002 8:54:51 AM
BLD-Footing7/18/20027/18/20027/18/2002PPASS
DetailsTom Arcoraci
KAY; Phone #: ###-####
Print Occupancy Form  6/24/2002  
Print Occupancy Form  6/24/2002  
(F) Reprint permit  6/6/2002  
Issue PAID IN FULL permit  6/5/2002 DONE
Routing - PLAN CHECK5/31/2002 6/4/2002 PASS
Per state approved plans.
PLANS/APPL TAKEN TO FRONT DESK  6/4/2002 DONE
Print Pending Permit.LaserJet4  6/4/2002 DONE
Case Summary (BLD)  6/4/2002 DONE
Case Summary (BLD)  6/4/2002  
Print Pending Permit.LaserJet4  6/4/2002  
Case Summary (BLD)  6/4/2002  
Inspection Record Card- Bld  6/4/2002  
Plan assigned to (M_P)4/9/2002 6/4/2002 PASS
DetailsMike Phillips
6/4/2002 08:14:18 M_P - activity updated through activity BLDA022 from case BLD02-00568.
Routing - PLAN CHECK5/22/2002 5/31/2002 FAIL
Waiting for additional informaiton from architect. Called and talked to John Price about additional concerns. He will be working on them.
Plan resubmittals received  5/22/2002 DONE
Received two sets of resubmittal sheets A1.1, A1.2, A4.0, "SHEET 1 OF 2", "SHEET 2 OF 2", F1, with cover letter and responses. Routed to Mike Phillips
Routing - PLAN CHECK4/18/2002 5/22/2002  
Routed to Marty.
Routing - PLANNING5/22/2002 5/22/2002 PASS
Approved per DRH01-00158.
Plan Review Completed(1st rev)  4/18/2002 FAIL
Routing - FIRE4/11/2002 4/18/2002 PASS
approved without written comment
Routing - PLAN CHECK4/9/2002 4/11/2002 FAIL
Plan review completed, sent correction report to Kay Howard and Dean Briggs requesting additional information for further review prior to issuing permit.
Print Pending Permit.LaserJet4  4/11/2002  
Routing - PLANNING3/28/2002 4/9/2002 FAIL
Plans do not comply with Design Review conditions of approval, DRH01-158.
Pending Assignment by JCM3/18/2002 4/9/2002 DONE
DetailsJohn Menard
4/9/2002 08:54:28 JCM - activity updated through activity BLDA170 from case BLD02-00568.
Plan resubmittals received  4/5/2002 DONE
Received two sets of resubmittal sheets A1.0, A1.1, A1.2 with State of Idaho Building Permit Application, State Of Idaho Envelope compliance report, Letter to Lisa Stover/State Plans Examiner, Design Calculations, and Drawings. Cover letter from Briggs Engineering also submitted. Routed to John Menard.
Routing - PUBLIC WORKS3/25/2002 3/28/2002 PASS
Telephone call  3/25/2002 DONE
Called Dean Briggs with Briggs Engineering for (3) copies of civil drawings, Drainage Calculations, and O&M as requested by Brian Murphy.
Routing - PLAN CHECK3/18/2002 3/25/2002  
Routing - PLANNING Land Div3/25/2002 3/25/2002 PASS
Land division ok. Routed to Public Works. (blc)
Additional plans submitted  3/22/2002 DONE
Received fax copy of information from United Water. Attached to plans.
Plans ACCEPTED BY PLAN TECH  3/18/2002 DONE
1. Plans from US Modular not stamped/signed. However plans from Architect are stamped and signed.
Application received  3/15/2002  
Recd Pcfee & Taken To Pln CK  3/15/2002 DONE
Fee Review-notes3/15/20023/15/2002