Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD02-00577
StatusFinaled
Name GARRIK CONSTRUCTION N.W.
Site Address 3750 E APHRODITE CT
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 2605 sq. ft. two story single family dwelling with a 1602 sq. ft. attached six car garage, a 437 sq. ft. covered entry porch, a 114 sq. ft. second level balcony deck and a 160 sq. ft. concrete patio at rear of structure per approved plans, all engineering/red-lining and attached requirement lists. (1st floor 1245 sq. ft.)(2nd floor 1086 sq. ft. finished/274 sq. ft. unfinished). Note: 2nd floor unfinished sitting/bonus room areas will require seperate permits to finish. PC #135 SOLAR PROTECTED SHADE RESTRICTED DJO
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
PostCard Mailed  2/1/2003 SENT
PostCard has been mailed requesting inspection.
BLD-Final7/26/20027/26/20027/26/2002PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 07/26/2002 at 10:45:42. Contact: ###-####. c.c # 7/26/2002 3:11:26 PM 17615 issued 7/26/2002 3:11:44 PM
BLD-Energy code compliance5/29/20025/30/20025/30/2002APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 05/29/2002 at 19:27:56. Contact: ###-####. ok to cover 5/30/2002 9:03:59 AM
BLD-Energy code compliance5/29/20025/29/20025/29/2002PFAIL
DetailsSteven Webb
Scheduled by a contractor via Hello! on 05/29/2002 at 09:59:50. Contact: ###-####. C/N--Insulation not completed. Call for re-inspection. 5/29/2002 3:34:33 PM
BLD-Framing/Rough-in5/28/20025/28/20025/28/2002PPART
DetailsSteven Webb
Scheduled by a contractor via Hello! on 05/28/2002 at 09:36:50. Contact: ###-####. C/N --ok to insulate. 5/28/2002 3:28:45 PM
BLD-Framing/Rough-in5/12/20025/13/20025/13/2002APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 05/12/2002 at 09:55:40. Contact: ###-####. shear ok to cover ext 5/13/2002 10:20:45 AM
BLD-Foundation4/3/20024/3/20024/3/2002PPART
DetailsSteven Webb
Scheduled by a contractor via Hello! on 04/03/2002 at 05:45:55. Contact: ###-####. wip 80% ready 4/3/2002 2:50:43 PM
BLD-Footing4/2/20024/2/20024/2/2002PPART
DetailsSteven Webb
Scheduled by a contractor via Hello! on 04/02/2002 at 04:56:42. Contact: ###-####. wip 4/2/2002 2:46:10 PM
Plan assigned to (DJO)3/26/20023/26/20023/28/2002 PASS
DetailsDan Overy
3/28/2002 08:53:11 DJO - activity updated through activity BLDA022 from case BLD02-00577.
PLANS/APPL TAKEN TO FRONT DESK  3/28/2002 DONE
Inspection Record Card- Bld  3/28/2002 DONE
Telephone call  3/28/2002 DONE
CALLED DAVE PLANS READY 3-28-02 ///DLD
Issue PAID IN FULL permit  3/28/2002 DONE
Plan Review Report  3/26/2002 DONE
Plans ACCEPTED BY PLAN CHECK  3/26/2002  
Routing - PUBLIC WORKS3/18/2002 3/19/2002 PASS
Application received  3/18/2002  
Routing - PLANNING3/18/2002 3/18/2002 PASS
Routing - PLAN CHECK3/19/2002