Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD02-00579
StatusFinaled
Name BOISE CITY FIRE/POLICE INTERNAL AFFAIRS
Site Address 150 N CAPITOL BLVD
Project NameCITY HALL EXPANSION-3RD FLR
Customer Number 
ePlanReviewNo
Description
(BOISE CITY HALL-3RD FLR)(FIRE DEPT & POLICE INTERNAL AFFAIRS) To perform selective demolition of entire 3rd floor. To remodel the 13,183 sq. ft. area for use as administrative offices & conference rooms. To construct new interior, non-bearing, non-combustible, fire-resistive walls to create new office areas & conference rooms; to upgrade restrooms for compliance with accessibility; modify suspended ceiling system, electrical, mechanical, plumbing, sprinkler & alarms systems as necessary to meet tenants needs and comply with adopted building codes. NOTE: This building is fully fire sprinklered. A certificate of occupancy is required. PC#02-159/drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  8/18/2015 DONE
Fee Review-notes7/18/20037/18/20037/18/2003 DONE
Permanent occupancy  2/24/2003 DONE
Perm. Occ. Cert. #9565 issued 2-24-03 to Boise City Fire & Police Internal Affairs on the 3rd floor of City Hall.
Permanent Occupancy 2/11/20032/11/2003 DONE
Details
BLD-Final2/10/20032/11/20032/11/2003APASS
DetailsCarl Dependahl
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung...ok for c/o...alarms ok per agreement2/11/2003 9:05:37 AM 2/11/2003 9:19:09 AM
BLD-Conference12/20/200212/23/200212/23/2002PPASS
DetailsCarl Dependahl
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung...w/ arch re 3rd fl...keep c/n re carpet. 12/23/2002 3:16:12 PM
BLD-Conference12/23/200212/23/200212/23/2002PCANC
DetailsCarl Dependahl
BLD-Final10/21/200210/21/200210/21/2002AFAIL
DetailsCarl Dependahl
complete carpet removal at restrm, comply w/ UBC 807, ok for t/o. 10/21/02 4:01:11 PM
BLD-Final10/17/200210/18/200210/18/2002ANR
DetailsCarl Dependahl
BLD-Final10/16/200210/17/200210/17/2002PNR
DetailsCarl Dependahl
resolve carpet & other c/n items 10/17/02 4:44:18 PM
BLD-Conference10/15/200210/16/200210/16/2002PPASS
DetailsCarl Dependahl
ww dan s. re notes 10/16/02 5:43:24 PM
BLD-Final10/14/200210/15/200210/16/2002ANR
DetailsCarl Dependahl
3rd fl. Scott
BLD-Final10/11/200210/14/200210/14/2002ANR
DetailsCarl Dependahl
BLD-Final10/10/200210/11/200210/11/2002ANR
DetailsCarl Dependahl
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
BLD-Final10/7/200210/7/200210/7/2002AFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 10/07/2002 at 07:19:00. Contact: ###-####...ok for t/o, keep c/n: firestops (existing condition) at util rm & shaft 10/7/02 4:11:47 PM
FIRE-Final Inspection10/3/200210/4/200210/5/2002APASS
DetailsRick Jackson
BLD-Final10/4/200210/4/200210/4/2002PNH
DetailsCarl Dependahl
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
BLD-Conference10/4/200210/4/200210/4/2002PPASS
DetailsCarl Dependahl
Keep c/n...need to remove carpet from restroom at 3rd fl.
FIRE-Final Inspection10/2/200210/3/200210/3/2002AFAIL
DetailsRick Jackson
will test alarms on 10/4 10/3/2002 4:25:59 PM
BLD-Final10/2/200210/3/200210/3/2002PFAIL
DetailsCarl Dependahl
keep c/n...add exit sign, egress control fail safe, firestops at shafts, etc...need fire ok'd 10/3/2002 3:23:11 PM
FIRE-Final Inspection10/1/200210/2/200210/2/2002PFAIL
DetailsRick Jackson
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung need alarm plans approved prior to testing; need clarification about double egress doors at lobby 10/2/2002 4:34:23 PM
BLD-Final10/1/200210/2/200210/2/2002PFAIL
DetailsCarl Dependahl
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung. NR, see bld02-0938... 10/2/2002 4:50:28 PM
BLD-Conference9/5/20029/6/20029/6/2002APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 09/05/2002 at 13:45:30. Contact: ###-####....w/ scott re finals 9/6/2002 2:58:01 PM
Print Occupancy Form  9/5/2002  
BLD-Framing/Rough-in8/9/20028/12/20028/12/2002PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 08/09/2002 at 07:49:00. Contact: ###-####. grid ok 8/12/2002 2:37:53 PM
BLD-Framing/Rough-in8/6/20028/7/20028/7/2002APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 08/06/2002 at 13:33:27. Contact: ###-####....3rd floor rest room plbg penetrations repaired, ok to tile wall 8/7/2002 4:07:06 PM
BLD-Conference7/17/20027/17/20027/17/2002PPASS
DetailsCarl Dependahl
w/ supt re: "shaft" at restrooms...complete gyp install...patch as needed, add sealants at pipes.
BLD-Conference7/8/20027/9/20027/9/2002APASS
DetailsCarl Dependahl
need archs details for wet wall/shaft assy. 7/9/2002 2:55:26 PM
BLD-Conference7/8/20027/9/20027/9/2002APASS
DetailsCarl Dependahl
need archs details for wet wall/shaft assy. 7/9/2002 2:55:26 PM
BLD-Conference7/8/20027/9/20027/9/2002APASS
DetailsCarl Dependahl
need archs details for wet wall/shaft assy. 7/9/2002 2:55:26 PM
BLD-Conference7/8/20027/9/20027/9/2002APASS
DetailsCarl Dependahl
need archs details for wet wall/shaft assy. 7/9/2002 2:55:26 PM
BLD-Conference7/8/20027/9/20027/9/2002APASS
DetailsCarl Dependahl
need archs details for wet wall/shaft assy. 7/9/2002 2:55:26 PM
BLD-Conference7/8/20027/9/20027/9/2002APASS
DetailsCarl Dependahl
need archs details for wet wall/shaft assy. 7/9/2002 2:55:26 PM
BLD-Conference7/8/20027/9/20027/9/2002APASS
DetailsCarl Dependahl
need archs details for wet wall/shaft assy. 7/9/2002 2:55:26 PM
BLD-Conference7/8/20027/9/20027/9/2002APASS
DetailsCarl Dependahl
need archs details for wet wall/shaft assy. 7/9/2002 2:55:26 PM
BLD-Conference7/8/20027/9/20027/9/2002APASS
DetailsCarl Dependahl
need archs details for wet wall/shaft assy. 7/9/2002 2:55:26 PM
BLD-Conference7/8/20027/9/20027/9/2002APASS
DetailsCarl Dependahl
need archs details for wet wall/shaft assy. 7/9/2002 2:55:26 PM
BLD-Framing/Rough-in7/8/20027/8/20027/8/2002PPART
DetailsCarl Dependahl
scott- ###-#### plbg permit issue ok, partitions ok...need clarify shaft/core at res 7/8/2002 4:52:03 PM trooms 7/8/2002 4:52:55 PM
BLD-Framing/Rough-in7/1/20027/2/20027/2/2002PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 07/01/2002 at 13:45:37. Contact: ###-####. one side only need oppiset legs screwed/ plan calls for elavator protection not in place. 7/2/2002 3:30:58 PM
BLD-Wall cover7/1/20027/2/20027/2/2002PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 07/01/2002 at 13:46:16. Contact: ###-####. one side only/ need plm permit and r/i insp. 7/2/2002 3:29:43 PM
Issue PAID IN FULL permit  5/23/2002 DONE
Inspection Record Card- Bld  5/23/2002 DONE
Inspection Record Card- Bld  5/23/2002 DONE
Telephone call  5/16/2002 DONE
CALLED LEFT MESSAGE WITH TONYA PLANS READY 5-16-02///DLD
PLANS/APPL TAKEN TO FRONT DESK  5/15/2002 PASS
To permit desk to issue.
Routing - PLAN CHECK4/24/2002 5/15/2002 PASS
Approved as noted on plans & attached plan review comments from all reviewing agencies.
Plan assigned to (DRS)3/21/2002 5/15/2002 PASS
DetailsDan Stuart
5/15/2002 09:05:50 DRS - activity updated through activity BLDA022 from case BLD02-00579.
Plan resubmittals received  5/8/2002 DONE
Received two sets of resubmittal sheets A0.01, A0.20, A0.21, A0.22, A0.23, A0.24, A1.43, A1.44, A2.13, A2.14, A2.23, A2.24, A2.60, A2.70, A2.80, A3.10, A5.11, A5.12, A5.13, A5.14, A5.15, A5.16, A6.13, A6.14, A9.11, A9.12, P0.1, P0.2, P1.0, P1.1, P2.0, P2.1, M1.0, M1.1, M2.0, M2.1, M3.0, FP1.0, FP1.1, E0.1, E1.3, E1.4, E2.3, E2.4, E3.3, E3.4, E4.3, E4.4, E5.0, with cover letter. Routed to Dan Stuart.
Routing - FIRE4/19/20024/24/20024/24/2002 PASS
DetailsBill Alexander
Plan Review Completed(1st rev)  4/24/2002 DONE
Plan resubmittals requested  4/19/2002 DONE
Routing - PLAN CHECK3/26/2002 4/19/2002 FAIL
Corrections required. Copies of plan review comments faxed and mailed to architect, Ted Isbell. Plans routed to fire code analyst.
Routing - PUBLIC WORKS3/21/2002 3/26/2002 PASS
Plans ACCEPTED BY PLAN TECH  3/19/2002 DONE
1. Plans not fully dimensioned.
Additional plans submitted  3/19/2002 DONE
Received two sets of Sheets A5.12. Attached to plans.
First Notice3/18/20023/18/20023/18/2002 DONE
Application received  3/18/2002  
Recd Pcfee & Taken To Pln CK  3/18/2002 DONE
fees waived