BLD-Final | 7/24/2002 | 7/25/2002 | 7/25/2002 | A | PASS |
Steven Webb
|
|
|
brian-gar door code is 8888; Phone #: ###-#### C. of C. #23292 issued. 7/25/2002 11:05:47 AM
|
DOC - Permit Finaled | 7/25/2002 | 7/25/2002 | 7/25/2002 | A | PASS |
Steven Webb
|
|
|
Finaled by inspector at 7/25/2002 11:05:51 AM
|
BLD-Framing/Rough-in | 5/22/2002 | 5/23/2002 | 5/23/2002 | A | PASS |
Steven Webb
|
|
|
###-####
|
BLD-Energy code compliance | 5/22/2002 | 5/23/2002 | 5/23/2002 | A | PASS |
Steven Webb
|
|
|
###-####
|
BLD-Framing/Rough-in | 5/21/2002 | 5/21/2002 | 5/21/2002 | P | PART |
Steven Webb
|
|
|
fr brian- ###-#### C/N ok to insulate. 5/21/2002 4:03:53 PM
|
BLD-Framing/Rough-in | 5/9/2002 | 5/9/2002 | 5/9/2002 | P | PART |
Steven Webb
|
|
|
shear brian ###-#### SHEAR-ok except one panel inside garage--check at framing. Ok to cover exterior. 5/9/2002 4:13:42 PM
|
BLD-Foundation | 4/9/2002 | 4/9/2002 | 4/9/2002 | P | PART |
Steven Webb
|
|
|
found wall- ###-####--mike wip--80% ready at time of inspection. 4/9/2002 1:09:19 PM
|
BLD-Footing | 4/5/2002 | 4/8/2002 | 4/8/2002 | A | PART |
Steven Webb
|
|
|
###-#### 90% ready at time of inspection. 4/8/2002 11:24:03 AM
|
BLD-Conference | 4/3/2002 | 4/3/2002 | 4/3/2002 | P | DONE |
Steven Webb
|
|
|
Scheduled by Inspector: 420 On 4/3/2002 2:48:02 PM Approved builder to extend his garage 6 feet in depth. Builder talked to Dan Overy--Dan indicated his approval based on it being ok with the field inspector. This change would not add bearing. Ok with inspector if lot will allow. 4/3/2002 2:54:44 PM
|
Inspection Record Card- Bld | | | 3/29/2002 | | DONE |
|
|
|
|
Telephone call | | | 3/29/2002 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 3/29/2002 | | |
|
|
|
|
Plan assigned to (DJO) | 3/28/2002 | 3/28/2002 | 3/28/2002 | | PASS |
Dan Overy
|
|
|
3/28/2002 16:50:51 DJO - activity updated through activity BLDA022 from case BLD02-00609.
|
Plan Reviewer's activity | | | 3/28/2002 | | PEND |
|
|
|
addition framing and sections required for 2nd floor bathroom (floor and roof)
|
Case Summary (BLD) | | | 3/28/2002 | | PEND |
|
|
|
|
Plan Review Report | | | 3/28/2002 | | PEND |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/28/2002 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 3/28/2002 | | |
|
|
|
|
Application received | | | 3/22/2002 | | |
|
|
|
|
Routing - PLANNING | 3/22/2002 | | 3/22/2002 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 3/22/2002 | | 3/22/2002 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 3/22/2002 | | | | |
|
|
|
|
Pending Assignment by DJO | 3/22/2002 | | | | |
Dan Overy
|
|
|
|