Fee Review-notes | 7/22/2003 | 7/22/2003 | 7/22/2003 | | DONE |
|
|
|
Additional values from subcontractors.
|
Permanent occupancy | | | 2/27/2003 | | DONE |
|
|
|
Perm. Occ. Cert. #9570 issued 2-27-03 to Dr. John Hinsel Dental Clinic.
|
BLD-Final | 2/11/2003 | 2/12/2003 | 2/12/2003 | A | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung OK for Perm Occ. :) 2/12/2003 2:44:57 PM
|
Permanent Occupancy | | 2/12/2003 | 2/12/2003 | | DONE |
|
|
|
|
Code Occupancy Approval | 2/6/2003 | 2/6/2003 | 2/6/2003 | A | DONE |
Carol Montgomery
|
|
|
Meets compliance with Dr. Can final and release bond. 2/6/03 9:02:20 AM
|
BLD-Final | 1/10/2003 | 1/13/2003 | 1/13/2003 | A | PART |
Jim Sly
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie OK for Temp. Occ. C/N Need all req signatures for Perm Occ within 90 days of this notice. 1/13/2003 10:15:17 AM
|
Code Occupancy Approval Temp | 1/13/2003 | 1/10/2003 | 1/10/2003 | A | FAIL |
Carol Montgomery
|
|
|
Bonded (1170.) for temporary. Still need 1) bike rack, 2) Dumpster encl. gate, 3) 4-4' Arbs at the a/c units (Fairview frontage) and 4) repair extruded curbing at the dumpster planter area (north side of bldg). 1/13/03 8:15:44 AM
|
FIRE-Final Inspection | 1/8/2003 | 1/9/2003 | 1/9/2003 | A | PASS |
Troy Cobbley
|
|
|
fire life safety finaled 1/9/2003 10:09:49 AM
|
BLD-Final | 1/8/2003 | 1/9/2003 | 1/9/2003 | A | NR |
Jim Sly
|
|
|
after 10 ###-####
|
BLD-Final | 1/7/2003 | 1/8/2003 | 1/8/2003 | P | FAIL |
Jim Sly
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie C/N Mirrors max 38" Max slope ext landings, nd Need plumb 02-02855 and 02-03122 finals. 1/8/2003 4:15:22 PM
|
FIRE-Final Inspection | 1/3/2003 | 1/6/2003 | 1/6/2003 | A | FAIL |
Troy Cobbley
|
|
|
provide ADA approved hardware on the slider doors, see cabo/ansi A11.7.1 section 4, 404.2.7. Remove thumbturn from north exit door, see cabo/ansi A11.7.1 section 4, 404.2.7. Provide "Door to remain unlocked during business hours" at the main exit door per review note #2. Verify the marking of the medical piping per review note #5. Provide address per review note # 10. Provide fire extinguishers per review note #11. Provide automatic shutdown of the HVAC units per UMC section 608. Remove the manual flush bolt from the double doors near the main exit. See UBC section 1003.3.1.8 1/6/2003 11:31:38 AM
|
FIRE-Final Inspection | 1/6/2003 | 1/6/2003 | 1/6/2003 | P | FAIL |
Troy Cobbley
|
|
|
###-#### This inspection was set up by the sprinkler contractor but as with the earlier inspection comments I could not verify where the sprinkler tie in is 1/6/2003 4:18:04 PM
|
BLD-Final | 1/2/2003 | 1/3/2003 | 1/3/2003 | P | NR |
Russ Owen
|
|
|
JIM; Phone #: ###-#### Internet Inspection Request from: Darla Downs. needs all other signatures prior to calling for final. 1/3/2003 4:14:00 PM
|
BLD-Final | 12/27/2002 | 12/30/2002 | 12/30/2002 | A | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 12/27/2002 at 14:36:43. Contact: ###-####.did a walk thru and there are items not yet completed to many to list. 12/30/2002 11:31:15 AM
|
BLD-Framing/Rough-in | 12/4/2002 | 12/5/2002 | 12/5/2002 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/04/2002 at 11:58:16. Contact: ###-####. Moved Valve box from 1hr Med gas wall. 12/5/2002 9:45:52 AM
|
BLD-Framing/Rough-in | 11/20/2002 | 11/21/2002 | 11/21/2002 | A | PART |
Jim Sly
|
|
|
call first ###-#### Corr completed except fix from Arch. for valve (box) penitration at 1hr Med Gas wall. 11/21/2002 4:32:21 PM
|
BLD-Framing/Rough-in | 11/19/2002 | 11/20/2002 | 11/20/2002 | A | NR |
Jim Sly
|
|
|
jim--call 1st before insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Framing/Rough-in | 11/18/2002 | 11/19/2002 | 11/19/2002 | A | FAIL |
Jim Sly
|
|
|
Phone #: ###-#### Internet Inspection Request from: Amy Lawson Correct all items on Corr notice. 11/19/2002 11:26:47 AM
|
BLD-Framing/Rough-in | 11/13/2002 | 11/14/2002 | 11/14/2002 | A | FAIL |
Jim Sly
|
|
|
###-#### C/N posted. 11/14/2002 12:54:27 PM
|
BLD-Framing/Rough-in | 11/12/2002 | 11/13/2002 | 11/13/2002 | A | FAIL |
Jim Sly
|
|
|
###-#### jim 9 Need appr plans. 41-1837 jim 11/13/2002 4:23:39 PM
|
BLD-Framing/Rough-in | 11/6/2002 | 11/7/2002 | 11/7/2002 | A | FAIL |
Jim Sly
|
|
|
###-#### C/N No approved plans.... Remove Ext wall covering for shear insp....stop working on Ext. 11/7/2002 11:32:33 AM
|
BLD-Foundation | 9/10/2002 | 9/11/2002 | 9/11/2002 | A | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
|
BLD-Footing | 9/9/2002 | 9/9/2002 | 9/9/2002 | P | PASS |
Dave Hannah
|
|
|
###-####
|
BLD-Foundation | 8/6/2002 | 8/7/2002 | 8/7/2002 | A | DONE |
Dave Hannah
|
|
|
###-#### BRENT did this inspection yesterday 8/7/2002 11:30:25 AM
|
BLD-Foundation | 8/6/2002 | 8/6/2002 | 8/6/2002 | P | PART |
Dave Hannah
|
|
|
basement walls ok tpo pour 8/6/2002 12:52:14 PM
|
BLD-Footing | 8/1/2002 | 8/2/2002 | 8/2/2002 | A | PASS |
Dave Hannah
|
|
|
BRENT; Phone #: ###-#### basement ftg 8/2/2002 9:53:31 AM
|
(F) Reprint permit | | | 7/25/2002 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 7/24/2002 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/5/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/5/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/5/2002 | | DONE |
|
|
|
|
Telephone call | | | 6/5/2002 | | DONE |
|
|
|
LEFT MESSAGE WITH RAYMOND 6-5-02///DLD
|
Routing - PLAN CHECK | 6/3/2002 | | 6/5/2002 | | PASS |
|
|
|
|
Plan assigned to (MLO) | 3/28/2002 | | 6/5/2002 | | PASS |
Mike Otto
|
|
|
6/5/2002 09:28:06 MLO - activity updated through activity BLDA022 from case BLD02-00692.
|
Plan resubmittals received | | | 5/31/2002 | | DONE |
|
|
|
Received two sets of resubmittal sheets A-1, A-2, A-3, A-4, A-5, A-6, A-7, A-9, with (2) calculations and cover letter. Routed to Mike Otto.
|
Routing - FIRE | 5/30/2002 | 5/30/2002 | 5/30/2002 | | PASS |
|
|
|
|
Routing - FIRE | 5/20/2002 | | 5/22/2002 | | FAIL |
|
|
|
RESUBMITTAL DID NOT ADDRESS FIRE ISSUES
|
Routing - PLAN CHECK | 5/16/2002 | | 5/20/2002 | | FAIL |
|
|
|
corrections sent to architect
|
Plan resubmittals requested | | | 5/20/2002 | | DONE |
|
|
|
UBC corrections
|
Plan resubmittals received | | | 5/16/2002 | | DONE |
|
|
|
Received two sets of resubmittal sheets T-1, A-1, A-2, A-3, A-4, A-5, A-6, A-7, A-8, A-9, S.10, S-2, S-3, with cover letter and structural calculations. Routed to Mike Otto.
|
Plan Review Completed(1st rev) | | | 4/17/2002 | | FAIL |
|
|
|
|
Routing - FIRE | 4/10/2002 | | 4/17/2002 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 4/10/2002 | | FAIL |
|
|
|
UBC Corrections
|
Routing - PLAN CHECK | 4/5/2002 | | 4/10/2002 | | FAIL |
|
|
|
corrections sent to architect
|
Routing - PLUMBING | 4/2/2002 | | 4/5/2002 | | PASS |
|
|
|
SEE ATTACHED
|
Received Certificate of Value | | | 4/4/2002 | | DONE |
|
|
|
put one copy in file and two copies with plans. kmm
|
Routing - PLANNING | 4/1/2002 | | 4/2/2002 | | PASS |
|
|
|
Approved per DRH01-183.
|
Plans ACCEPTED BY PLAN TECH | | | 4/1/2002 | | DONE |
|
|
|
Received struct. calcs. and code data, put with plans. kmm
|
Routing - PUBLIC WORKS | 3/28/2002 | | 4/1/2002 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 3/28/2002 | | 3/28/2002 | | PASS |
|
|
|
Land division ok. Routed to Public Works. (blc)
|
Plans ACCEPTED BY PLAN TECH | | | 3/28/2002 | | PEND |
|
|
|
Requires struct. calcs and code data. Contacted James Shervik at ###-#### of these needs. He stated that the eng. will be bring this information on April 1st. kmm
|
Waiting for Cert. of Value | | | 3/28/2002 | | DONE |
|
|
|
waiting for revised cert. of value to show elec. mech. plumb etc. values. KMM
|
Plan routing begun/NEW & ADDTN | | | 3/28/2002 | | DONE |
|
|
|
|
First Notice | 3/27/2002 | 3/27/2002 | 3/27/2002 | | DONE |
|
|
|
|
Application received | | | 3/27/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/27/2002 | | |
|
|
|
|