Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD02-00692
StatusFinaled
Name SHERVIK BUILDERS INC
Site Address 10162 W FAIRVIEW AVE
Project NameKNUDSEN SQUARE
Customer Number 
ePlanReviewNo
Description
DR. JOHN HINSEL DENTAL CLINIC - To construct a full brick veneer 3,000sq. ft. single level Type VN dental office with a 240 sq. ft. basement used for mechanical only - no storage permitted with one exit. DRH01-00183
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes7/22/20037/22/20037/22/2003 DONE
Additional values from subcontractors.
Permanent occupancy  2/27/2003 DONE
Perm. Occ. Cert. #9570 issued 2-27-03 to Dr. John Hinsel Dental Clinic.
BLD-Final2/11/20032/12/20032/12/2003APASS
DetailsJim Sly
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung OK for Perm Occ. :) 2/12/2003 2:44:57 PM
Permanent Occupancy 2/12/20032/12/2003 DONE
Details
Code Occupancy Approval2/6/20032/6/20032/6/2003ADONE
DetailsCarol Montgomery
Meets compliance with Dr. Can final and release bond. 2/6/03 9:02:20 AM
BLD-Final1/10/20031/13/20031/13/2003APART
DetailsJim Sly
jim; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie OK for Temp. Occ. C/N Need all req signatures for Perm Occ within 90 days of this notice. 1/13/2003 10:15:17 AM
Code Occupancy Approval Temp1/13/20031/10/20031/10/2003AFAIL
DetailsCarol Montgomery
Bonded (1170.) for temporary. Still need 1) bike rack, 2) Dumpster encl. gate, 3) 4-4' Arbs at the a/c units (Fairview frontage) and 4) repair extruded curbing at the dumpster planter area (north side of bldg). 1/13/03 8:15:44 AM
FIRE-Final Inspection1/8/20031/9/20031/9/2003APASS
DetailsTroy Cobbley
fire life safety finaled 1/9/2003 10:09:49 AM
BLD-Final1/8/20031/9/20031/9/2003ANR
DetailsJim Sly
after 10 ###-####
BLD-Final1/7/20031/8/20031/8/2003PFAIL
DetailsJim Sly
jim; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie C/N Mirrors max 38" Max slope ext landings, nd Need plumb 02-02855 and 02-03122 finals. 1/8/2003 4:15:22 PM
FIRE-Final Inspection1/3/20031/6/20031/6/2003AFAIL
DetailsTroy Cobbley
provide ADA approved hardware on the slider doors, see cabo/ansi A11.7.1 section 4, 404.2.7. Remove thumbturn from north exit door, see cabo/ansi A11.7.1 section 4, 404.2.7. Provide "Door to remain unlocked during business hours" at the main exit door per review note #2. Verify the marking of the medical piping per review note #5. Provide address per review note # 10. Provide fire extinguishers per review note #11. Provide automatic shutdown of the HVAC units per UMC section 608. Remove the manual flush bolt from the double doors near the main exit. See UBC section 1003.3.1.8 1/6/2003 11:31:38 AM
FIRE-Final Inspection1/6/20031/6/20031/6/2003PFAIL
DetailsTroy Cobbley
###-#### This inspection was set up by the sprinkler contractor but as with the earlier inspection comments I could not verify where the sprinkler tie in is 1/6/2003 4:18:04 PM
BLD-Final1/2/20031/3/20031/3/2003PNR
DetailsRuss Owen
JIM; Phone #: ###-#### Internet Inspection Request from: Darla Downs. needs all other signatures prior to calling for final. 1/3/2003 4:14:00 PM
BLD-Final12/27/200212/30/200212/30/2002ANR
DetailsRuss Owen
Scheduled by a contractor via Hello! on 12/27/2002 at 14:36:43. Contact: ###-####.did a walk thru and there are items not yet completed to many to list. 12/30/2002 11:31:15 AM
BLD-Framing/Rough-in12/4/200212/5/200212/5/2002APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 12/04/2002 at 11:58:16. Contact: ###-####. Moved Valve box from 1hr Med gas wall. 12/5/2002 9:45:52 AM
BLD-Framing/Rough-in11/20/200211/21/200211/21/2002APART
DetailsJim Sly
call first ###-#### Corr completed except fix from Arch. for valve (box) penitration at 1hr Med Gas wall. 11/21/2002 4:32:21 PM
BLD-Framing/Rough-in11/19/200211/20/200211/20/2002ANR
DetailsJim Sly
jim--call 1st before insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in11/18/200211/19/200211/19/2002AFAIL
DetailsJim Sly
Phone #: ###-#### Internet Inspection Request from: Amy Lawson Correct all items on Corr notice. 11/19/2002 11:26:47 AM
BLD-Framing/Rough-in11/13/200211/14/200211/14/2002AFAIL
DetailsJim Sly
###-#### C/N posted. 11/14/2002 12:54:27 PM
BLD-Framing/Rough-in11/12/200211/13/200211/13/2002AFAIL
DetailsJim Sly
###-#### jim 9 Need appr plans. 41-1837 jim 11/13/2002 4:23:39 PM
BLD-Framing/Rough-in11/6/200211/7/200211/7/2002AFAIL
DetailsJim Sly
###-#### C/N No approved plans.... Remove Ext wall covering for shear insp....stop working on Ext. 11/7/2002 11:32:33 AM
BLD-Foundation9/10/20029/11/20029/11/2002APASS
DetailsJim Sly
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
BLD-Footing9/9/20029/9/20029/9/2002PPASS
DetailsDave Hannah
###-####
BLD-Foundation8/6/20028/7/20028/7/2002ADONE
DetailsDave Hannah
###-#### BRENT did this inspection yesterday 8/7/2002 11:30:25 AM
BLD-Foundation8/6/20028/6/20028/6/2002PPART
DetailsDave Hannah
basement walls ok tpo pour 8/6/2002 12:52:14 PM
BLD-Footing8/1/20028/2/20028/2/2002APASS
DetailsDave Hannah
BRENT; Phone #: ###-#### basement ftg 8/2/2002 9:53:31 AM
(F) Reprint permit  7/25/2002  
Issue PAID IN FULL permit  7/24/2002 DONE
PLANS/APPL TAKEN TO FRONT DESK  6/5/2002 DONE
Inspection Record Card- Bld  6/5/2002 DONE
Print Occupancy Form  6/5/2002 DONE
Telephone call  6/5/2002 DONE
LEFT MESSAGE WITH RAYMOND 6-5-02///DLD
Routing - PLAN CHECK6/3/2002 6/5/2002 PASS
Plan assigned to (MLO)3/28/2002 6/5/2002 PASS
DetailsMike Otto
6/5/2002 09:28:06 MLO - activity updated through activity BLDA022 from case BLD02-00692.
Plan resubmittals received  5/31/2002 DONE
Received two sets of resubmittal sheets A-1, A-2, A-3, A-4, A-5, A-6, A-7, A-9, with (2) calculations and cover letter. Routed to Mike Otto.
Routing - FIRE5/30/20025/30/20025/30/2002 PASS
Routing - FIRE5/20/2002 5/22/2002 FAIL
RESUBMITTAL DID NOT ADDRESS FIRE ISSUES
Routing - PLAN CHECK5/16/2002 5/20/2002 FAIL
corrections sent to architect
Plan resubmittals requested  5/20/2002 DONE
UBC corrections
Plan resubmittals received  5/16/2002 DONE
Received two sets of resubmittal sheets T-1, A-1, A-2, A-3, A-4, A-5, A-6, A-7, A-8, A-9, S.10, S-2, S-3, with cover letter and structural calculations. Routed to Mike Otto.
Plan Review Completed(1st rev)  4/17/2002 FAIL
Routing - FIRE4/10/2002 4/17/2002 FAIL
Plan resubmittals requested  4/10/2002 FAIL
UBC Corrections
Routing - PLAN CHECK4/5/2002 4/10/2002 FAIL
corrections sent to architect
Routing - PLUMBING4/2/2002 4/5/2002 PASS
SEE ATTACHED
Received Certificate of Value  4/4/2002 DONE
put one copy in file and two copies with plans. kmm
Routing - PLANNING4/1/2002 4/2/2002 PASS
Approved per DRH01-183.
Plans ACCEPTED BY PLAN TECH  4/1/2002 DONE
Received struct. calcs. and code data, put with plans. kmm
Routing - PUBLIC WORKS3/28/2002 4/1/2002 PASS
Routing - PLANNING Land Div3/28/2002 3/28/2002 PASS
Land division ok. Routed to Public Works. (blc)
Plans ACCEPTED BY PLAN TECH  3/28/2002 PEND
Requires struct. calcs and code data. Contacted James Shervik at ###-#### of these needs. He stated that the eng. will be bring this information on April 1st. kmm
Waiting for Cert. of Value  3/28/2002 DONE
waiting for revised cert. of value to show elec. mech. plumb etc. values. KMM
Plan routing begun/NEW & ADDTN  3/28/2002 DONE
First Notice3/27/20023/27/20023/27/2002 DONE
Application received  3/27/2002  
Recd Pcfee & Taken To Pln CK  3/27/2002