Description
EMERALD TECH CENTER - BUILDING #F (SHELL) - TO CONSTRUCT A NEW 25, 075 SQUARE FOOT, ONE STORY, CONCRETE TILT-UP BUILDING WITH STEEL ROOF JOIST AND METAL ROOF DECK AND RELATED SITE IMPROVEMENTS. THIS BUILDING IS FULLY FIRE SPRINKLERED. THE SPRINKLERS ARE BEING USED FOR AREA INCREASE. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED COMMENT LIST. THIS IS A SHELL PERMIT ONLY. NO OCCUPANCY IS ALLOWED UNDER THIS PERMIT. SEPARATE TENANT IMPROVEMENT PERMITS ARE REQUIRED TO FINISH THIS BUILDING FOR OCCUPANCY. 02-195/JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance/Occupancy  7/2/2019 DONE
Second Notice BLD4/26/20054/26/20054/26/2005 DONE
First Notice has not been responded to.
First Notice 3/19/20044/26/2005 DONE
Fee Review-notes3/28/20023/28/20028/10/2004 DONE
DOC - Permit Finaled3/19/20043/19/20043/19/2004PPASS
DetailsJim Sly
Finaled by inspector at 3/19/2004 2:09:30 PM
BLD-Final3/17/20043/19/20043/19/2004APASS
DetailsJim Sly
jim; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie 3/19/2004 11:43:15 AM Letter from Pinnacle Eng. and Kleinfelder special insp agency.....OK. 3/19/2004 2:09:14 PM
FIRE-Final Inspection3/18/20043/19/20043/19/2004AFAIL
DetailsTroy Cobbley
Shell fire sprinkler system forward flush test failed. 3/19/2004 9:33:58 AM
FIRE-Final Inspection3/19/20043/19/20043/19/2004PPASS
DetailsTroy Cobbley
Fire life safety finaled. The shell/core fire alarm permit (FIR04-00104) has been mistakenly attached to a tenant improvement permit. 3/19/2004 2:08:47 PM
FIRE-Final Inspection3/17/20043/18/20043/18/2004AFAIL
DetailsTroy Cobbley
Paint curbing and final sprinklers and alarms 3/18/2004 9:52:42 AM
PubWorks Occupancy Approval3/10/20043/10/20043/10/2004 DONE
Drainage project complete, signed permanent occupancy 3/10/04. D.Erskine
Code Occupancy Approval  3/9/2004 PAS
ALL IN AS REQUIRED FINAL SIGNED OFF.
BLD-Framing/Rough-in9/10/20029/11/20029/11/2002APART
DetailsTom Arcoraci
JIM; Phone #: ###-#### Internet Inspection Request from: Darla Downs riser room and entry soffiets ok to cover 9/11/2002 10:23:42 AM
BLD-Concrete8/14/20028/15/20028/15/2002APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 08/14/2002 at 17:08:11. Contact: ###-####.suhbject to s-i. 8/15/2002 10:41:13 AM
Routing Off Site - STRUCTURAL6/11/2002 8/6/2002 PASS
Called PDQ to route resubmittal sheets A4.1, s2.1, s2.2, s3.1 with structural calculations to route to outside engineering. dkl Received letter from consulting engineer indicating no further submittals required. JCM
BLD-Footing7/12/20027/15/20027/15/2002APART
DetailsRuss Owen
###-#### JIM subject to si. 7/15/2002 12:43:24 PM
BLD-Concrete7/8/20027/9/20027/9/2002APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 07/08/2002 at 15:00:40. Contact: ###-####.subject to s-i. 7/9/2002 11:51:44 AM
BLD-Concrete7/8/20027/9/20027/9/2002APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 07/08/2002 at 15:00:40. Contact: ###-####.subject to s-i. 7/9/2002 11:51:44 AM
BLD-Footing6/17/20026/17/20026/17/2002PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 06/17/2002 at 10:31:24. Contact: ###-####.Ok special inspection approved. 6/17/2002 2:50:35 PM
BLD-Footing6/11/20026/12/20026/12/2002APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 06/11/2002 at 12:32:33. Contact: ###-####. pending spec insp 6/12/2002 9:30:48 AM
BLD-Footing6/10/20026/11/20026/11/2002PCANC
DetailsRuss Owen
Scheduled by a contractor via Hello! on 06/10/2002 at 15:21:53. Contact: ###-####.
Plan resubmittals received  6/11/2002 DONE
Received three sets of resubmittal sheets A4.1, S2.1, S2.2, S3.1, (3) sets of structural calculations, Cover Letter, and transmittal. Routed to John Menard.
(F) Reprint permit  6/5/2002  
Issue PAID IN FULL permit  6/4/2002 DONE
Plan resubmittals requested  6/3/2002  
Faxed the architect of record a copy of the comment list from the consulting structural engineer requesting additional revisions. JCM
Routing Off Site - STRUCTURAL5/21/2002 6/3/2002 FAIL
Called PDQ to route resubmittal Sheet S4.1, S5.1, S5.2 to outside engineering. Received comment list from consulting structural engineer requesting additional submittals. JCM
Routing - PLAN CHECK5/30/2002 5/31/2002 PASS
Additional structural revisions may be required. Will not effect foundation so I will issue the permit to begin construction. I will contact the architect for additional structural revisions, if required by the consulting structural engineer. JCM
PLANS/APPL TAKEN TO FRONT DESK  5/31/2002 PASS
Inspection Record Card- Bld  5/31/2002 DONE
Print Occupancy Form  5/31/2002 DONE
Telephone call  5/31/2002 DONE
permit ready and need ACHD
Plan assigned to (JCM)3/29/2002 5/31/2002 PASS
DetailsJohn Menard
5/31/2002 13:24:43 JCM - activity updated through activity BLDA022 from case BLD02-00699.
Routing - PLANNING Land Div5/29/2002 5/30/2002 PASS
Routing - PLAN CHECK5/23/2002 5/29/2002  
Routing - FIRE5/21/2002 5/23/2002 PASS
Plan Reviewer's activity  5/21/2002 PASS
Reviewed and approved resubmitted plan sheets, as drawn. JCM
Routing - PLAN CHECK5/21/2002 5/21/2002 PASS
Routing - PLUMBING5/13/2002 5/20/2002 PASS
poer plans and 2000 upc
Routing - PLANNING5/10/2002 5/13/2002 PASS
Plan resubmittals received  5/10/2002 DONE
Received three copies of revised sheets L-1, C-1, C-2, C-3, S4.1, S5.1, S5.2. and calcs. Put Land scape plans with plans in P&Z, routed civil and struct. to John M. kmm
Routing - PLAN CHECK4/23/2002 5/10/2002  
Plan Review Completed(1st rev)  4/23/2002 FAIL
Routing - FIRE4/16/2002 4/23/2002 FAIL
WATER SUPPLY
Routing Off Site - STRUCTURAL3/29/2002 4/16/2002 FAIL
Called PDQ to send to outside engineering. dkl Received comment list from consulting structural engineer requesting revisions. JCM
Plan resubmittals requested  4/16/2002 FAIL
Mailed the architect of record a copy of the plan review comment list requesting revisions. JCM
Plan resubmittals requested  4/16/2002  
Faxed the architect of record a copy of the comment list from the consulting structural engineer requesting revisions. JCM
Routing - PLAN CHECK4/15/2002 4/16/2002 FAIL
Routing - PLANNING4/11/2002 4/15/2002 FAIL
The Design Review Application (DRH00-105) needs to be modified. Contacted Wes Steele on 4/12/02.
Routing - PUBLIC WORKS4/5/2002 4/11/2002 PASS
Routing - PLANNING Land Div3/29/2002 4/5/2002 FAIL
Return to Land division for review after routed to everyone else. (blc)
Plans ACCEPTED BY PLAN TECH  3/29/2002 DONE
1. Plans state in notes that Mechanical, Plumbing, Fire Sprinkler, Electrical, and Fire Alarms are "Design Build by Contractor/Subcontractor.
Recd Pcfee & Taken To Pln CK  3/28/2002 DONE